Sunteți pe pagina 1din 8

An ocean going ship of 4000 gross tons must be fitted

with a standard discharge shore connection for the


discharge of oily wastes to a reception facility. The
c10 155
dimensions for the connection are specified in the
Pollution Prevention Regulations under Part
_____________________.

Which of the following is the minimum


internal diameter of the main bilge suction
c10 2 ½ inches
piping permitted by regulations on a vessel
over 150 gross tons?

An ocean going ship of over 400 gross tons must be


fitted with a standard discharge shore connection. What
c10 size bolt circle diameter is required for this shore 183 mm
connection to transfer oily ballast to a shore side
reception facility?

According to the Coast Guard Pollution Prevention


Regulations (33 CFR), what is the minimum number of
c10 4 bolts
bolts required in a temporarily connected standard ANSI
coupling?

hoses are
Pollution Prevention Regulations state that no person may supported so that
c10
transfer oil to or from a vessel unless_____________. couplings have no
strain on them

Prohibited oil spaces” as specified in the Pollution Tanks storing oil in


c10 Prevention Regulations provide regulations, which of the the forepeak
following? compartment.
According to regulations, when loading, or discharging oil
A red flag (day),
c10 in bulk at a dock, which of the following signals must be
red light (night)
displayed?

an oil tanker of
150 gross tons or
A shipboard oil pollution emergency plan is required of
c10 above, or other
______________.
ship of 400 gross
tons or above
annually by the
owner, with a letter
submitted to the
Shipboard Oil Pollution Emergency Plans must be Coast Guard
c10
reviewed __________. within one month
of the anniversary
date of the plan
approval

be independent of
Coast Guard Regulations require the emergency bilge the main bilge
c10
system to _____. system/ no other
connection

When discharging clean ballast, prior to entering the


loading port, if the ballast is determined by the oil monitor be terminated
c10
to exceed 15 parts per million of oil, the Deballasting must automatically
___________________.

Coast Guard regulations require a shipboard oil pollution


c10 annually only
emergency plan to be reviewed _____________.

c10 The term "arrival ballast" refers to ___________. clean ballast


Which of the following liquids can ordinarily be discharge
c10 overboard without being processed through an oily water Segregated ballast
separator?

Water ballast placed in a tank that has been crude oil


c10 washed, but not water rinsed, shall be regarded as dirty ballast
________.

Regulations, state that ocean going ships of 400 gross


tons and above must be fitted with a standard discharge suitable for a
c10 shore connection for the discharge of oily waste from service pressure of
machinery space bilges to reception facilities. The flange 6 kg/cm2
of this discharge connection must be _______________.

In an oil pumping operation where pumping connections


c10 are made up of flanged hoses the weakest link is the Hose
_________.

tank that is
The term "segregated ballast" is defined in the Pollution completely
c10 Prevention Regulations as ballast water introduced into separated from the
a/an ____________. cargo oil and fuel
oil systems

is in the immediate
vicinity and
No person may transfer oil to or from a vessel unless the
c10 immediately
person in charge _____________.
available to the oil
transfer personnel

valves used during


Pollution Prevention Regulations require that on the
c10 transfer shall be
completion of oil transfer operations all _____________.
closed
Pollution regulations require that the oil transfer
procedures, which must be posted on every vessel having
a capacity of 250 or more barrels of oil, must contain a
c10 I, II & III
description of each oil transfer system installed on the
vessel including each _____________. I. valve II. pump
III. Vent

According to the Coast Guard Pollution Prevention


Regulations, no person may transfer oil to or from a
vessel unless _____________. I. each part of the transfer
c10 system not necessary for the transfer operation is I, II & III
securely blanked or shut off II. the discharge containment
is in place III. each scupper or drain in a discharge
containment system is closed

According to Pollution Prevention Regulations, no person


may transfer oil to or from a vessel unless
_____________. I. each hose is supported in a manner
that prevents strain on its coupling II. Each part of the
c10 I, II & III
transfer system necessary to allow the flow of oil is lined
up for transfer III. each oil transfer hose has no loose
covers, kinks, bulges, or soft spots, and no gouges, cuts
or slahses that penetrate the hose reinforcement

Which of the following statements is true concerning oil


transfer connections? I. Any permanently connected
flange coupling must have a bolt in each hole II. Approved
c10 quick-connect couplings may be used III. When a I, II & III
temporary connection utilizes an American National
Standard Institute (ANSI) standard flange, a bolt in every
other hole is acceptable if at least four bolts are used
Oil Pollution Prevention Regulations, require that the
person-in-charge of transfer operations is to insure that
the _____________. I. drains and scuppers are closed by
c10 I, II & III
the mechanical means II. transferrer and transferee know
the identity of the product to be transferred III. hose is
supported to prevent kinking or damage

In accordance with Regulations, a 25,000 gross ton cargo


vessel on an ocean route, having two 10,000 HP oil fired
boilers, requires a certain quantity of hand portable and
semi-portable fire extinguishing systems in the engine
c10 I, II & III
room. Which of the following quantities of extinguishing
agents would meet these requirements? I. 100 lbs. CO2,
20 lbs. dry chemical II. 30 lbs. CO2, 40 gals. foam III. 5
gals foam, 50 lbs. dry chemical

where they can be


The transfer procedures for oil products are required to be
c10 easily seen or
posted ____________.
readily available

Remote control for stopping machinery driving fuel oil protected against
service pumps is required. These controls shall be accidental
_______. operation

When completing the ballasting operation of a Back flow of


contaminated tank, which of the following problems must contaminated
be guarded against? water
discharging at an
Among other restrictions, an oil tanker may not discharge
instantaneous rate
an oily mixture into the sea from a cargo tank, slop tank,
of oil content not
or cargo pump room bilge unless the vessel is_________
exceeding 30 liters
.
per nautical mile

notify the terminal


If a leak in an oil hose coupling cannot be stopped by
operator, then
tightening the coupling bolts, you should
shutdown and
____________________.
repair the leak

While loading bulk oil, you notice oil on the water near the
barge. Which of the following actions should you carry Stop loading
out FIRST?

all parts of the


Pollution Prevention Regulations, state that no person
transfer system
c10 may transfer oil to or from a vessel unless
have been
_____________.
properly lined up

When amendments are made to the Shipboard Oil and cannot be


c10 Pollution Emergency Plan, the revisions must be implemented
submitted to the Coast Guard __________. without approval

The approval period for a shipboard oil pollution


c10 five years
emergency plan expires after __________.

To prevent oil from escaping into the sea when ballasting start the cargo
c10 through the cargo piping system, you should FIRST pump, then open
_________. sea suction valves
document signed
by vessel and
shore facility
According to the Pollution Prevention Regulations, the persons-in-charge
c10
declaration of inspection is the ____________. declaring that all
transfer
requirements
have been met

Topping off of any


Which of the listed operations must be personally
c10 tanks being
supervised by the person-in-charge while taking on fuel?
loaded.

According to 33 CFR Part 151, all tankships of 150 GT


shipboard oil
and above and all other ships of 400 GT and above,are
c10 pollution
required to prepare and maintain an approved
emergency plan
__________________.

During topping off of bunker tanks, the loading rate must


c10 person-in-charge
be personally supervised by the ____________.

According to Pollution Prevention Regulations, no person the designated


c10 may connect or engage in any other critical oil transfer person-incharge is
operation unless _____________. present

According to Pollution Prevention Regulations, if a cargo


the hose is
c10 hose shows a small leak in its fabric, you may transfer oil
replaced
after______________.

According to Pollution Prevention Regulations (33 CFR),


c10 the minimum number of bolts permitted in an ANSI four
standard flange on an oil hose is_______________.
The minimum number of bolts necessary for a standard
c10 ANSI oil transfer hose temporary flange coupling (eight four bolts
bolt hole flange) is ____________________.

c10 According to Regulations (46 CFR), no vessel can come officer-in-charge of


alongside or remain alongside a tank vessel while it is the vessel which is
loading A, B, or C grade cargo without having the loading
permission of the ____________.

c10 According to Pollution Prevention Regulations, when may When authorized


a person serve as the person-in-charge of both a vessel by the Captain of
and a facility during oil transfer operations? the Port.

S-ar putea să vă placă și