The principal role of quality control is to see if the construction work complies with the
drawings, specifications, and project standards. Field inspection is conducted to
evaluate compliance with the project quality requirements. Field inspection covers not
only the work performed by the field craftsmen, but also the condition of the materials
incorporated into the work.
1. Responsibilities
Field inspection will be conducted by SPM's own forces or those of inspection agencies.
The manage of the Quality Section assigns field inspector to monitor field activities. The
field inspector will document his inspection efforts. Inspection is usually done in two
ways:
(1) By frequent inspection during the work.
(2) By final proof or testing of the completed work.
A chief field inspector will be assigned is more working scope. He has the overall
responsibility for field inspection activities and coordinates the project inspection effort to
ensure the desired results. He will represent the company but under the capacity
construction or field manager in all questions of field inspection. He will verify the
inspection documentation and test results and issue field inspection reports to the client
and project organization through the construction or field manager. He will also report to
the Quality Section Chief in Bangkok Office. The term "inspector" mean "chief field
inspector or supervisor".
Normally, function of the inspector will be defined in a work execution plan to cover the
inspection scope requiring by clients.
The field inspection organization chart is shown in Appendix 1.
2. Scope of Work
Inspection work for field construction shall include, but not be limited to, those items listed
in Appendix 2, Field Inspection Items. Appendix 2 also classifies inspection items into
those inspected by SPM. Only, those for which the clients notified in the inspection
schedule, those witnessed by the clients, and those for which results are reported to the
clients.
4. Detailed Procedures
The inspector shall document detailed procedures, both internal matters and for matters
relating to the client, including schedules, forms for recording inspection results, and
reporting procedures by following contractual formats.
.
SP . Mechamca IEngmeenng C 0., Ltd
(Ii
Doc. No.: SPM-QAlQC-001
QA/QC PROCEDURE
Date: 02/04/07 I Page 2 of 5
The inspector shall submit the inspection records to client for the inspection items