Sunteți pe pagina 1din 59

Power and Battery Cabinet

PBC 6200

Indoor Cabinets

Prebared by : Ahmed Abouzaid


PBC 6200 Overview

Prebared by : Ahmed Abouzaid


Power Unit Overview

Prebared by : Ahmed Abouzaid


Power Unit Overview
- 48 V Neutral AC Power

Prebared by : Ahmed Abouzaid


AC Input Bracket Installation
Alternatives

Prebared by : Ahmed Abouzaid


Power Unit Attachment to
Battery Rack

Prebared by : Ahmed Abouzaid


Power Unit Attachment to Wall

Prebared by : Ahmed Abouzaid


Dimensions

Prebared by : Ahmed Abouzaid


Earth Grounding Points

Prebared by : Ahmed Abouzaid


Power Cable Connection

Prebared by : Ahmed Abouzaid


Rectifiers

Prebared by : Ahmed Abouzaid


AGM Battery Connections

Prebared by : Ahmed Abouzaid


Power Unit

Prebared by : Ahmed Abouzaid


Power and Battery Cabinet
PBC 6200

Indoor Cabinet

Prebared by : Ahmed Abouzaid


Installation video (MBL)
› An installation video (MBL) is available for installation of a PBC 6200
› This generic MBL includes installation of a PBC 6200 including connection of the AC
power, fitting of rectifiers, batteries etc.
› But it does not include installation of an RBS 6601 in the PBC 6200 rack.
› Link to PBC 6200 MBL: http://mbl.internal.ericsson.com/external/en_lzu1087821.htm

Prebared by : Ahmed Abouzaid


PBS 6200 Overview

Prebared by : Ahmed Abouzaid


Delivered Items

Prebared by : Ahmed Abouzaid


Put one of the side walls

Prebared by : Ahmed Abouzaid


Fasten the Battery Shelf to the
Front

Prebared by : Ahmed Abouzaid


Position the Second Side Wall

Prebared by : Ahmed Abouzaid


Raise the Rack to a Standing
Position

Prebared by : Ahmed Abouzaid


Assemble the cross bars in
pairs

Prebared by : Ahmed Abouzaid


Attach One of the Cross Bar

Prebared by : Ahmed Abouzaid


Fasten the Cross Bars

Prebared by : Ahmed Abouzaid


Fasten the remaining battery
shelves

Prebared by : Ahmed Abouzaid


Position The Roof Plate

Prebared by : Ahmed Abouzaid


Tighten all screws

Prebared by : Ahmed Abouzaid


Earth Grounding

Prebared by : Ahmed Abouzaid


Drilling Template

Prebared by : Ahmed Abouzaid


Anchor Sleeve Installation

Prebared by : Ahmed Abouzaid


Battery Rack Positioning

Prebared by : Ahmed Abouzaid


Battery Rack Leveling

Prebared by : Ahmed Abouzaid


Raised Floor Installation

Prebared by : Ahmed Abouzaid


Attach the Adapter Frame

Prebared by : Ahmed Abouzaid


Delivered Items

Prebared by : Ahmed Abouzaid


Position the Roof Plate

Prebared by : Ahmed Abouzaid


Attach the Cross Bar Pair

Prebared by : Ahmed Abouzaid


Position the Two Sides

Prebared by : Ahmed Abouzaid


Fasten the Transmission
Equipment Rack

Prebared by : Ahmed Abouzaid


Attach the TRM Mounting Kit

Prebared by : Ahmed Abouzaid


Power Unit Overview

Prebared by : Ahmed Abouzaid


AC Input Bracket Installation
Alternatives

Prebared by : Ahmed Abouzaid


Power Unit Attachment to
Battery Rack

Prebared by : Ahmed Abouzaid


Power Unit Attachment to Wall
Dimensions

Prebared by : Ahmed Abouzaid


Earth Grounding Points

Prebared by : Ahmed Abouzaid


Power Cable Connection

Prebared by : Ahmed Abouzaid


Rectifiers

Prebared by : Ahmed Abouzaid


Cicuit Breaker

Prebared by : Ahmed Abouzaid


Alarm Cable Connection

Prebared by : Ahmed Abouzaid


Battery Cable Connection

Prebared by : Ahmed Abouzaid


Cables Connected to Forks

Prebared by : Ahmed Abouzaid


Cables Directly Connected to Circuit
Breaker and Terminals

Prebared by : Ahmed Abouzaid


Web Board

Prebared by : Ahmed Abouzaid


Inter-block Connections

Prebared by : Ahmed Abouzaid


AGM Battery Connections

Prebared by : Ahmed Abouzaid


OPzV Battery Connections

Prebared by : Ahmed Abouzaid


Connections between Main and
Extension Power Units

Prebared by : Ahmed Abouzaid


Installing Batteries
Connecting the Batteries – Enersys
EON 100 Ah Batteries

Connecting an Enersys EON 100 Ah


Battery String

Prebared by : Ahmed Abouzaid

S-ar putea să vă placă și