Elaboracion de la Formula Polinómica

Cuadro de Insumos y Coeficientes de Incidencia


Noviembre del 2005
IU Descripción Und. Cantidad P. Unit. P. Parcial Coef.Inc
02 Alambre Negro N° 8 Kg. 14.6382 3.4 49.77 0.002 ###
02 Alambre Negro N° 16 Kg. 16.5294 3.4 56.20 0.002 ###
02 Clavos con cabeza de 21/ Kg. 20.2471 3.4 68.84 0.002 ###
03 Acero Kg. 395.7905 2.1 831.16 0.029 ###
05 Arena gruesa M3 5.2712 17 89.61 0.003 ###
04 Arena Fina M3 2.6282 17 44.68 0.002 ###
05 Piedra chancada de 1/2", M3 8.6082 24.3 209.18 0.007 ###
05 Piedra Mediana (max. 4" M3 1.5314 18.5 28.33 0.001 ###
05 Piedra Grande (max. 8") M3 2.7454 18.5 50.79 0.002 ###
21 Cemento Portland TIPO BL 134.4886 15.8 2124.92 0.073 ###
54 Thiner Gal 8.2508 12 99.01 0.003 ###
55 Imprimante SINOLIT Kg. 19.2200 1.5 28.83 0.001 ###
29 Yeso x 18 Kilos BL 0.2867 4.5 1.29 0.000 ###
29 Electrodo Tipo 6012 Kg. 88.8000 7.8 692.64 0.024 ###
38 Hormigon M3 12.5444 16 200.71 0.007 ###
17 Hoja de Sierra UND 88.8022 4.5 399.61 0.014 ###
39 Lija Para Madera UND 19.2240 1.25 24.03 0.001 ###
37 Lija Para Fierrro UND 1.1867 1.5 1.78 0.000 ###
39 Agua M3 2.9883 6 17.93 0.001 ###
43 Madera Tornillo P2 544.7600 3.5 1906.66 0.066 ###
37 Reglas y Encofrado P2 7.6143 3.5 26.65 0.001 ###
43 Madera Cedro P2 2.2017 5.9 12.99 0.000 ###
43 Triplay Lupuna 6 mm.x 4 UND 8.0000 19 152.00 0.005 ###
46 Malla Metalica Cocada 2" M2 151.5806 25.3 3834.99 0.132 ###
51 Angulo de Fierro 1/8"x 3/ UND 53.0112 11.65 617.58 0.021 ###
51 Platina de Fierro 3/16"x UND 0.9948 36.8 36.61 0.001 ###
54 Pintura Esmalte Gal 13.2569 32.5 430.85 0.015 ###
54 Base Sin Cromato Gal 0.6764 42 28.41 0.001 ###
56 Plancha de Acero LAC 3 UND 0.7155 171.26 122.54 0.004 ###
65 Tuberia de Fierro Galva UND 64.9870 72.25 4695.31 0.161 ###
Mano de Obra 0.000 ###
47 capataz H-H 34.7069 10.78 374.14 0.013 ###
47 operario H-H 304.3561 9.8 2982.69 0.103 ###
47 oficial H-H 168.1404 8.83 1484.68 0.051 ###
47 peon H-H 332.4994 7.91 2630.07 0.090 ###
47 mano de obra T Glb 1.0000 100 100.00 0.003 ###
Equipos 0.000 ###
49 Nivel H-E 0.9700 4 3.88 0.000 ###
49 Cortadora de Disco de 1 H-M 4.1675 12 50.01 0.002 ###
48 Mezcladora de Concreto H-M 8.4879 14 118.83 0.004 ###
48 Camion Volquete 4x2, 1 H-M 3.4104 45 153.47 0.005 ###
48 Camionet Simple Tracci H-M 2.0000 100 200.00 0.007 ###
49 Maquina de Soldar H-M 28.4160 10 284.16 0.010 ###
49 Plancha Compactadora V H-M 1.3148 12.26 16.12 0.001 ###
49 Vibrador a gasolina Y 1/ H-M 2.3325 7.64 17.82 0.001 ###
Sub Total I 25299.76 ###
Gastos Generales 15 % 3794.96428 0.1304 ###
Sub Total II 29094.73
I.G.V 5528.00 1.000
Total 34622.72
Elaboracion de Monomios

IU Descripción Coef.Inc Coef.Inc


02 Acero Liso 0.0060 0.006 2
03 Acero 0.0286 0.029 2
04 Agregados 0.0084 0.008 3
05 Piedra chancada 0.0130 0.013 3
21 Cemento 0.0730 0.073 3
54 Pintura 0.0202 0.020 5
43 Madera 0.0721 0.072 4
46 Malla metalica 0.1318 0.132 6
29 Dólar 0.0238 0.024 5
65 Tuberia de fiero galvanizado 0.1614 0.161 2
47 Mano de obra 0.2602 0.260 1
49 Maquinaria Nacional 0.0169 0.017 4
48 Maquinaria Importada 0.0121 0.012 5
39 Indice General 0.0153 0.016 6
51 Angulo de Fierro 0.0267 0.027 6
39 Gastos Generales y Utilidad 0.1304 0.130 8
Total 1.0000 1.000

Agrupacion De Terminos
1
Simbolo Descripción Eliminados y agrupados IU Coef.Inc 2
47 Mano de obra 0.26 3
65 Tuberia de fiero galvanizado 3 2 0.196 4
04 Agregados 38 5 21 0.094 5
43 Madera 37 49 0.089 6
29 Dólar 54 48 0.056
46 Malla metalica 51+56 39 0.175 8
39 Gastos Generales y Utilidad 0.13

0.000
0.023
0.006
0.013
0.000
0.000
0.000
0.065
0.000
observacion 0.000
0.005
0.131
0.021
0.001
0.014
0.000
0.004
0.161
0.000
0.012
0.102
0.051
0.090
0.003
0.000
0.000
0.001
0.004
0.005
0.006
0.009
FORMULA POLINOMICA

Simbolo Descripción IU Coef.Inc % Partic.


J Mano de obra 47 0.260 100.00%
Tuberia de fiero galvanizad 65 82.14%
TAL Acero 03 0.196 14.80%
Acero Liso 02 3.06%
Agregados 04 8.51%
APC Piedra chancada 05 0.094 13.83%
Cemento 21 77.66%
Madera 43 80.90%
MMA 0.089
Maquinaria Nacional 49 19.10%
Dólar 29 42.86%
DMP Maquinaria Importada 48 0.056 21.43%
Pintura 54 35.71%
Malla Metalica 46 75.43%
MAI Angulo de Fierro 51 0.175 15.43%
Indice General 39 9.14%
GGU Gastos Generales y Utilida 39 0.130 100.00%

Formula Polinómica

Jr TALr APCr MMAr DM Pr MAIr GGUr


K=0. 260∗ +0 . 196∗ +0. 094∗ +0 . 089∗ +0. 056∗ +0 .175∗ +0. 130∗
Jo TALo APCo MMAo DMPo MAIo GGUo
ANEXO Nº 01: CALCULO DEL AVANCE DE OBRA
VALORIZACION Nº 01 AL 31 DE MAYO 2006

PRESUPUESTO VALORIZACION
ITEM DESCRIPCION VALOR ANTERIOR
UND METRADO P.U. MONTO
METRADO VALOR
01.00.00 OBRAS PROVISIONALES
01.01.01 Transporte de equipo , Herramientas y Madera GLB 1.00 300.00 300.00 0.00 0.00
01.02.00 Cartel de Obra 2.4 x 4.8 PZA 2.00 701.16 1402.32 0.00 0.00

02.00.00 TRABAJOS PRELIMINARES


02.01.00 Demoilicion Muros M² 4.40 11.99 52.76 0.00 0.00
02.02.00 Demolicion de Losa Concreto e = 10 cm M² 32.90 5.76 189.50 0.00 0.00
02.03.00 Trazo y Replanteo ML 129.40 0.35 45.29 0.00 0.00

03.00.00 MOVIMIENTO DE TIERRAS


03.01.00 Excavacion de Zanjas para Cimentacion de Malla Metalica y Bancas M3 11.70 17.98 210.37 0.00 0.00
03.02.00 Base de Hormigon para Losa e = 10 cm M² 32.90 5.53 181.94 0.00 0.00
03.03.00 Eliminacion de Material Excedente con Esponj. M3 19.50 12.91 251.75 0.00 0.00

04.00.00 OBRAS DE CONCRETO SIMPLE


04.01.00 Dados Anclaje : Concreto f'c = 175 Kg/cm2 M3 1.40 215.86 302.20 0.00 0.00
04.02.00 Cimientos Corridos : Concreto C:H 1 : 10 + 30% P.G. Max. 6" M3 5.60 104.59 585.70 0.00 0.00
04.03.00 Sobrecimientos : Concreto 1 : 8 + 25% P.M. Max. 4" M3 2.70 150.41 406.11 0.00 0.00
04.04.00 Sobrecimientos : Encofrado y Desencofrado M² 35.50 22.91 813.31 0.00 0.00
04.05.00 Losas : Concreto f'c = 140 Kg/cm2 e = 4" M² 32.90 31.44 1034.38 0.00 0.00

05.00.00 OBRAS DE CONCRETO ARMADO


05.01.00 Bancas Corridas : Concreto f'c = 175 Kg/cm2 M3 5.90 214.76 1267.08 0.00 0.00
05.02.00 Bancas Corridas : Encofrado y Desencofrado M² 54.50 28.51 1553.80 0.00 0.00
05.03.00 Bancas Corridas : Acero de Refuerzo fy = 4200 Kg/cm2 kg 281.00 3.11 873.91 0.00 0.00
06.00.00 CARPINTERIA METALICA
06.01.00 Malla Metalica , Cocada 2" x 2" en Parque La Amistad M² 75.90 73.55 5582.45 0.00 0.00
06.02.00 Malla Metalica , Cocada 2" x 2" en Parque Las Casuarinas M² 101.70 72.51 7374.27 0.00 0.00

07.00.00 REVOQUES Y ENLUCIDOS


07.01.00 Tarrajeo Frotachado en Sobrecimientos de Malla Metalica . Incl. Resanes M² 38.10 14.24 542.54 0.00 0.00
07.02.00 Tarrajeo Frotachado en Apoyos de Bancas M² 16.80 16.34 274.51 0.00 0.00
07.03.00 Tarrajeo Pulido en Losa de Bancas M² 53.30 16.88 899.70 0.00 0.00

08.00.00 PINTURA
08.01.00 Imprimante y Pintura Esmalte 2 Manos en Sobrecimiento de Malla Metalica y M M² 96.10 6.55 629.46 0.00 0.00

09.00.00 VARIOS
09.01.00 Pintura de Losa Deportiva PZA 2.00 263.18 526.36 0.00 0.00

COSTO DIRECTO S/.25299.69 S/.0.00


GASTOS GENERALES (10%) S/.2529.97 S/.0.00
UTILIDADES (5%) S/.1264.98 S/.0.00
……………… ………………
SUB TOTAL A PRECIOS DEL VR SIN IGV S/.29094.64 S/.0.00

SUB TOTAL A PRECIOS DEL CONTRATO S/.27731.09

MONTO CONTRATADO
VALOR REFERENCIAL
FACTOR DE RELACION (fr)
MONTO AVANCE DE OBRA (V)
ANEXO Nº 02: CALCULO DEL AVANCE DE OBRA
VALORIZACION Nº 01 AL 30 DE JUNIO 2006

PRESUPUESTO VALORIZACION
ITEM DESCRIPCION VALOR ANTERIOR
UND METRADO P.U. MONTO
METRADO VALOR
01.00.00 OBRAS PROVISIONALES
01.01.01 Transporte de equipo , Herramientas y Madera GLB 1.00 300.00 300.00 1.00 300.00
01.02.00 Cartel de Obra 2.4 x 4.8 PZA 2.00 701.16 1402.32 2.00 1402.32

02.00.00 TRABAJOS PRELIMINARES


02.01.00 Demoilicion Muros M² 4.40 11.99 52.76 4.40 52.76
02.02.00 Demolicion de Losa Concreto e = 10 cm M² 32.90 5.76 189.50 32.90 189.50
02.03.00 Trazo y Replanteo ML 129.40 0.35 45.29 129.40 45.29

03.00.00 MOVIMIENTO DE TIERRAS


03.01.00 Excavacion de Zanjas para Cimentacion de Malla Metalica y Bancas M3 11.70 17.98 210.37 11.70 210.37
03.02.00 Base de Hormigon para Losa e = 10 cm M² 32.90 5.53 181.94 32.90 181.94
03.03.00 Eliminacion de Material Excedente con Esponj. M3 19.50 12.91 251.75 19.50 251.75

04.00.00 OBRAS DE CONCRETO SIMPLE


04.01.00 Dados Anclaje : Concreto f'c = 175 Kg/cm2 M3 1.40 215.86 302.20 1.40 302.20
04.02.00 Cimientos Corridos : Concreto C:H 1 : 10 + 30% P.G. Max. 6" M3 5.60 104.59 585.70 5.60 585.70
04.03.00 Sobrecimientos : Concreto 1 : 8 + 25% P.M. Max. 4" M3 2.70 150.41 406.11 2.70 406.11
04.04.00 Sobrecimientos : Encofrado y Desencofrado M² 35.50 22.91 813.31 35.50 813.31
04.05.00 Losas : Concreto f'c = 140 Kg/cm2 e = 4" M² 32.90 31.44 1034.38 32.90 1034.38

05.00.00 OBRAS DE CONCRETO ARMADO


05.01.00 Bancas Corridas : Concreto f'c = 175 Kg/cm2 M3 5.90 214.76 1267.08 2.95 633.54
05.02.00 Bancas Corridas : Encofrado y Desencofrado M² 54.50 28.51 1553.80 27.25 776.90
05.03.00 Bancas Corridas : Acero de Refuerzo fy = 4200 Kg/cm2 kg 281.00 3.11 873.91 140.50 436.96

06.00.00 CARPINTERIA METALICA


06.01.00 Malla Metalica , Cocada 2" x 2" en Parque La Amistad M² 75.90 73.55 5582.45 37.95 2791.22
06.02.00 Malla Metalica , Cocada 2" x 2" en Parque Las Casuarinas M² 101.70 72.51 7374.27 50.85 3687.13

07.00.00 REVOQUES Y ENLUCIDOS


07.01.00 Tarrajeo Frotachado en Sobrecimientos de Malla Metalica . Incl. Resanes M² 38.10 14.24 542.54 19.05 14.24
07.02.00 Tarrajeo Frotachado en Apoyos de Bancas M² 16.80 16.34 274.51 8.40 16.34
07.03.00 Tarrajeo Pulido en Losa de Bancas M² 53.30 16.88 899.70 26.65 16.88

08.00.00 PINTURA
08.01.00 Imprimante y Pintura Esmalte 2 Manos en Sobrecimiento de Malla Metalica y M M² 96.10 6.55 629.46 48.05 6.55

09.00.00 VARIOS
09.01.00 Pintura de Losa Deportiva PZA 2.00 263.18 526.36 1.00 263.18

COSTO DIRECTO S/.25299.69 S/.14418.55


GASTOS GENERALES (10%) S/.2529.97 S/.1441.86
UTILIDADES (5%) S/.1264.98 S/.720.93
……………… ………………
SUB TOTAL A PRECIOS DEL VR SIN IGV S/.29094.64 S/.16581.34

SUB TOTAL A PRECIOS DEL CONTRATO S/.27731.09

MONTO CONTRATADO
VALOR REFERENCIAL
FACTOR DE RELACION (fr)
MONTO AVANCE DE OBRA (V)
L AVANCE DE OBRA
AL 31 DE MAYO 2006

VALORIZACION SALDO POR VALORIZAR


VALOR ACTUAL VALOR ACUMULADO %
METRADO VALOR
METRADO VALOR METRADO VALOR

1.00 300.00 1.00 300.00 100% 0.00 0.00


2.00 1402.32 2.00 1402.32 100% 0.00 0.00

4.40 52.76 4.40 52.76 100% 0.00 0.00


32.90 189.50 32.90 189.50 100% 0.00 0.00
129.40 45.29 129.40 45.29 100% 0.00 0.00

11.70 210.37 11.70 210.37 100% 0.00 0.00


32.90 181.94 32.90 181.94 100% 0.00 0.00
19.50 251.75 19.50 251.75 100% 0.00 0.00

1.40 302.20 1.40 302.20 100% 0.00 0.00


5.60 585.70 5.60 585.70 100% 0.00 0.00
2.70 406.11 2.70 406.11 100% 0.00 0.00
35.50 813.31 35.50 813.31 100% 0.00 0.00
32.90 1034.38 32.90 1034.38 100% 0.00 0.00

2.95 633.54 2.95 633.54 50% 2.95 633.54


27.25 776.90 27.25 776.90 50% 27.25 776.90
140.50 436.96 140.50 436.96 50% 140.50 436.96
37.95 2791.22 37.95 2791.22 50% 37.95 2791.22
50.85 3687.13 50.85 3687.13 50% 50.85 3687.13

0.00 0.00 0.00 0.00 0% 38.10 542.54


0.00 0.00 0.00 0.00 0% 16.80 274.51
0.00 0.00 0.00 0.00 0% 53.30 899.70

0.00 0.00 0.00 0.00 0% 96.10 629.46

0.00 0.00 0.00 0.00 0% 2.00 526.36

S/.14101.36 S/.14101.36 55.74% S/.11198.33


S/.1410.14 S/.1410.14 S/.1119.83
S/.705.07 S/.705.07 S/.559.92
………………… ……………………. …………………….
S/.16216.57 S/.16216.57 S/.12878.07

S/.15456.56

AVANCE PROGRAM. = 55.74%


S/.33000.00 AVANCE REAL = 55.74%
S/.34622.63 …………………….
0.95313 RETRASO = 0.00%
S/.15456.56
L AVANCE DE OBRA
AL 30 DE JUNIO 2006

VALORIZACION SALDO POR VALORIZAR


VALOR ACTUAL VALOR ACUMULADO %
METRADO VALOR
METRADO VALOR METRADO VALOR

0.00 0.00 1.00 300.00 100% 0.00 0.00


0.00 0.00 2.00 1402.32 100% 0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00 4.40 52.76 100% 0.00 0.00
0.00 0.00 32.90 189.50 100% 0.00 0.00
0.00 0.00 129.40 45.29 100% 0.00 0.00

0.00 0.00 11.70 210.37 100% 0.00 0.00


0.00 0.00 32.90 181.94 100% 0.00 0.00
0.00 0.00 19.50 251.75 100% 0.00 0.00

0.00 0.00 1.40 302.20 100% 0.00 0.00


0.00 0.00 5.60 585.70 100% 0.00 0.00
0.00 0.00 2.70 406.11 100% 0.00 0.00
0.00 0.00 35.50 813.31 100% 0.00 0.00
0.00 0.00 32.90 1034.38 100% 0.00 0.00
2.95 633.54 5.90 633.54 100% 0.00 633.54
27.25 776.90 54.50 776.90 100% 0.00 776.90
140.50 436.96 281.00 436.96 100% 0.00 436.96
0.00
0.00
37.95 2791.22 75.90 2791.22 100% 0.00 2791.22
50.85 3687.13 101.70 3687.13 100% 0.00 3687.13

19.05 14.24 38.10 542.54 100% 0.00 0.00


8.40 16.34 16.80 274.51 100% 0.00 0.00
26.65 16.88 53.30 899.70 100% 0.00 0.00

48.05 6.55 96.10 629.46 100% 0.00 0.00


0.00
0.00
1.00 263.18 2.00 526.36 100% 0.00 0.00

S/.8642.94 S/.16973.94 34.16% S/.8325.75


S/.864.29 S/.1697.39 S/.832.58
S/.432.15 S/.848.70 S/.416.29
………………… ……………………. …………………….
S/.9939.38 S/.19520.03 S/.9574.61

S/.9473.56

AVANCE PROGRAM. = 34.16%


S/.33000.00 AVANCE REAL = 34.16%
S/.34622.63 …………………….
0.95313 RETRASO = 0.00%
S/.9473.56
INDICES UNIFICADOS DE PRECIOS PARA ZONA 1: LA LIBERTAD

DESCRIPCION Nov-05 Apr-06


01 Aceite, Lubricantes 533.93 567.14
02 Acero de Construcción liso 412.67 407.17
03 Acero de Construcción Corrugado 410.29 404.82
04 Agregado Fino 327.00 329.43
05 Agregado grueso 369.13 367.60
06 Alambre y Cable de Cobre Desnudo 582.47 660.41
07 Alambre y Cable Tipo TW y THW 385.03 455.20
08 Alambre y Cable Tipo WP 511.93 590.08
09 Alcantarilla Metal 205.25 202.52
10 Aparatos Sanitarios con Griferia 279.41 280.31
11 Artef. Alumbrado Exterior 228.30 225.56
12 Artef. Alumbrado Interior 215.68 216.49
13 Asfalto 1091.37 1091.37
14 Baldosa Acustica 249.06 250.91
15 Baldosa Asfaltica
16 Baldosa Vinílica 313.12 313.66
17-1 Bloques y Ladrillo 365.58 379.50
18 Cable Telefónico 338.07 328.04
19 Cable NYY - N2XY 449.15 513.67
20 Cemento Asfáltico 1147.10 1147.10
21 Cemento Portland Tipo I 361.79 362.47
22 Cemento Portland Tipo II 359.56 359.56
23 Cemento Portland Tipo V 360.57 360.57
24 Ceramica Esmaltada y S/Esmaltar 235.87 239.66
26 Cerrajería Nacional 344.87 334.36
27 Detonante 347.25 377.80
28 Dinamita 320.31 316.30
29 Dólar
30 Dolar mas inflación 391.90 387.94
31 Ducto de Concreto 270.93 270.75
32 Flete terrestre 366.34 380.21
33 Flete aéreo 535.65 530.15
34 Gasolina 502.66 497.06
35 Gelatina
36 Gelignita
37 Herramienta Manual 250.39 255.41
38 Hormigón 315.72 313.89
39 Índice General de precios al Consumidor 307.90 315.47
40 Loseta 304.58 305.68
41 Madera en tiras para Piso 269.09 272.83
42 Madera imp.para enc/carp 276.34 274.41
43 Madera nac para enc/caRP. 363.81 376.10
44 Madera terciada para encofrado y carpinteria 267.60 274.24
45 Madera terciada para encofrado 263.52 265.04
46 Malla de Acero 427.95 442.48
47 Mano de obra 347.47 347.52
48 Maquinaria y Equipo Nac. 321.32 328.10
49 Maquinaria y Equipo Imp. 274.40 271.18
50 Marco y tapa fo. fdo. 332.96 330.39
51 Perfil de Acero Liviano 276.67 282.48
52 Perfil de Aluminio 274.82 299.65
53 Petróleo Diesel 698.72 700.04
54 Pintura Látex 333.87 340.41
55 Pintura Temple 371.07 381.68
56 Plancha de Acero LAC 488.65 482.14
57 Plancha de Acero LAF 385.64 380.50
59 Plancha de Fibro - Cemento 166.57 1666.57
60 Plancha de Poliuretano 215.21 285.26
61 Plancha Galvanizada 308.56 320.45
62 Poste de Concreto 290.18 288.83
63 Poste de Fierro
64 Terrazo 174.91 169.82
65 Tubería de Acero Negro y/o galv. 278.47 285.57
66 Tuberia de PVC para la red de Agua Potable y Alcantarillado 522.73 471.62
68 Tubería de Cobre 202.50 227.52
69 Tuberia de Concreto Simple 289.02 289.02
70 Tuberia de Concreto Reforzado 177.07 177.07
71 Tubería de fo.fdo. 370.53 368.55
72 Tubería de PVC 392.94 360.93
73 Ductos y Acces. Telef. 451.61 455.06
76 Válvula de bronce Imp.
77 Valvula de Bronce Nac. 252.73 254.15
78 Valvula de Fierro Fdo. Nacional 383.07 379.78
79 Vidrio Incoloro Nacional
80 Concreto Premezclado 99.74 100.43
ANEXO Nº 02: CALCULO DEL COEFICIENTE "K"

COEFICIENTE K DE REINTEGRO

Simbolo Descripción IU Coef.Inc % Partic. Ir (Nov. 2005) Io (Abril 2006) Io / Ir


J Mano de obra 47 0.260 100.00% 347.47 347.470 347.52 347.52 1.000
347.470 347.52
Tuberia de fiero galvaniza 65 82.14% 278.47 228.743 285.57 234.575
TAL Acero 03 0.196 14.80% 410.29 60.706 404.82 59.897 1.016
Acero Liso 02 3.06% 412.67 12.633 407.17 12.464
302.082 306.937
Agregados 04 8.51% 327.00 27.830 329.43 28.037
APC Piedra chancada 05 0.094 13.83% 369.13 51.050 367.60 50.838 1.001
Cemento 21 77.66% 361.79 280.965 362.47 281.493
359.844 360.368
Madera 43 80.90% 363.81 294.318 376.10 304.261
MMA 0.089 1.027
Maquinaria Nacional 49 19.10% 274.40 52.413 271.18 51.798
346.732 356.059
Dólar 30 42.86% 391.9 167.957 397.94 170.546
DMP Maquinaria Importada 48 0.056 21.43% 321.32 68.854 328.10 70.307 1.018
Pintura 54 35.71% 333.87 119.239 340.41 121.575
356.051 362.428
Malla Metalica 46 75.43% 427.95 322.797 442.48 333.756
MAI Angulo de Fierro 51 0.175 15.43% 276.67 42.686 282.48 43.583 1.032
Indice General 39 9.14% 307.90 28.151 315.47 28.843
393.634 406.182
GGU Gastos Generales y Utilida 39 0.130 100.00% 307.90 307.900 315.47 315.470 1.025
307.900 315.470
K (Abril 2006)
COEFICIENTE K DE ADELANTO

Simbolo Descripción IU Coef.Inc % Partic. Ir (Nov. 2005) Io (Marzo 2006) Io / Ir


J Mano de obra 47 0.260 100.00% 347.47 347.47 347.52 347.520 1.000
347.47 347.520
Tuberia de fiero galvaniza 65 82.14% 278.47 228.743 275.16 226.024
TAL Acero 03 0.196 14.80% 410.29 60.706 405.80 60.042 0.988
Acero Liso 02 3.06% 412.67 12.633 408.15 12.494
302.082 298.561
Agregados 04 8.51% 327.00 27.830 328.07 27.921
APC Piedra chancada 05 0.094 13.83% 369.13 51.050 369.13 51.050 1.002
Cemento 21 77.66% 361.79 280.965 362.47 281.493
359.844 360.463
Madera 43 80.90% 363.81 294.318 362.47 293.234
MMA 0.089 0.995
Maquinaria Nacional 49 19.10% 274.40 52.413 271.17 51.797
346.732 345.031
Dólar 30 42.86% 391.90 167.957 386.63 165.699
DMP Maquinaria Importada 48 0.056 21.43% 321.32 68.854 329.10 70.521 1.003
Pintura 54 35.71% 333.87 119.239 338.97 121.061
356.051 357.281
Malla Metalica 46 75.43% 427.95 322.797 435.93 328.816
MAI Angulo de Fierro 51 0.175 15.43% 276.67 42.686 273.63 42.217 1.015
Indice General 39 9.14% 307.90 28.151 313.87 28.697
393.634 399.730
GGU Gastos Generales y Utilida 39 0.130 100.00% 307.90 307.900 313.87 313.870 1.019
307.900 313.870
K (Marzo 2006)

COEFICIENTE K DE ADELANTO

Simbolo Descripción IU Coef.Inc % Partic. Ir (Nov. 2005) Io (Mayo 2006) Io / Ir


J Mano de obra 47 0.260 100.00% 347.47 347.47 347.52 347.520 1.000
347.47 347.520
Tuberia de fiero galvaniza 65 82.14% 278.47 228.743 290.83 238.896
TAL Acero 03 0.196 14.80% 410.29 60.706 398.50 58.962 1.027
Acero Liso 02 3.06% 412.67 12.633 400.82 12.270
302.082 310.128
Agregados 04 8.51% 327.00 27.830 329.43 28.037
APC Piedra chancada 05 0.094 13.83% 369.13 51.050 364.80 50.451 1.000
Cemento 21 77.66% 361.79 280.965 362.47 281.493
359.844 359.980
Madera 43 80.90% 363.81 294.318 379.03 306.631
MMA 0.089 1.032
Maquinaria Nacional 49 19.10% 274.40 52.413 267.59 51.113
346.732 357.744
Dólar 29 42.86% 391.90 167.957 385.04 165.017
DMP Maquinaria Importada 48 0.056 21.43% 321.32 68.854 328.15 70.318 1.002
Pintura 54 35.71% 333.87 119.239 340.30 121.536
356.051 356.871
Malla Metalica 46 75.43% 427.95 322.797 449.73 339.225
MAI Angulo de Fierro 51 0.175 15.43% 276.67 42.686 285.00 43.971 1.046
Indice General 39 9.14% 307.90 28.151 313.80 28.690
393.634 411.887
GGU Gastos Generales y Utilida 39 0.130 100.00% 307.90 307.900 313.80 313.800 1.019
307.900 313.800
K (Mayo 2006)
K
0.260

0.199

0.094

0.091

0.057

0.181

0.133

1.015
K
0.260

0.194

0.094

0.089

0.056

0.178

0.133

1.004

K
0.260
0.201

0.094

0.092

0.056

0.183

0.132

1.018
ANEXO Nº 03:CALCULO DE REINTEGROS

REINTEGRO
MONTO DE AVANCE OBRA COEF. VALORIZACION REINTEGRO
V Kabril R´=V (K-1)
S/. 15456.56 1.015 S/. 232.43

DEDUCCION DE REINTEGRO
MONTO DE ADELANTO MONTO DE CONTRATO MONTO DE AVANCE OBRA COEF. VALORIZACION COEF. ADELANTO
A C V Kabril Kmarzo
S/. 6000.00 S/. 33000.00 S/. 15456.56 1.015 1.004

REINTEGRO (R´-D) = S/. 201.53

ANEXO Nº 04:CALCULO DE AMORTIZACION

AMORTIZACION
MONTO DE ADELANTO MONTO DE CONTRATO MONTO DE AVANCE OBRA AMORTIZACION
A C V AA = A*V/C
S/. 6000.00 S/. 33000.00 S/. 15456.56 S/. 2810.28
ANEXO Nº 03:CALCULO DE REINTEGROS

REINTEGRO
MONTO DE AVANCE OBRA COEF. VALORIZACION REINTEGRO
V Kabril R´=V (K-1)
S/. 9473.56 1.015 S/. 142.46

DEDUCCION DE REINTEGRO
MONTO DE ADELANTO MONTO DE CONTRATO MONTO DE AVANCE OBRA COEF. VALORIZACION COEF. ADELANTO
A C V Kabril Kmayo
S/. 6000.00 S/. 33000.00 S/. 9473.56 1.015 1.018

REINTEGRO (R´-D) = S/. 137.43

DEDUCCION POR ADELANTO DE MATERIALES

ADELANTO POR COMPRA DE MALLA METALICA AL 01 - 06 - 06


Imr = 449.73
Imo = 435.23
Ima = 443.48

AM = ( coef. De incid. ) X ( valoriz. ) X (( Imr - Imo) / Ima )

0.174 X 9473.56 X ( ( 449.73 - 435.23 ) / 443.48 ) ) = 53.90


Rt =142.46 -(5.03+53.90) = S/. 83.53

ANEXO Nº 04:CALCULO DE AMORTIZACION

AMORTIZACION
MONTO DE ADELANTO MONTO DE CONTRATO MONTO DE AVANCE OBRA AMORTIZACION
A C V AA = A*V/C
S/. 6000.00 S/. 33000.00 S/. 9473.56 S/. 1722.47

(ADEL. DCTO - IGV ) X 0.5 =

( 60000 - 1140 ) X 0.50 = 2430

AMOTIZACION TOTAL = S/. 4152.47


DEDUCCION
D=(A*V/C)*((Ki-Ka)/Ka)
S/. 30.89
DEDUCCION
D=(A*V/C)*((Ki-Ka)/Ka)
S/. 5.03
CUADRO RESUMEN N° 1

AVANCE DE OBRA V S/. 15,456.56


REINTEGRO R S/. 201.53
--------------------
VALORIZACION BRUTA VB S/. 15,658.09
AMORTIZACION (AA) AA S/. 2,810.28
--------------------
VALORIZACION NETA VN S/. 12,847.81
IMPUESTOS (19%) IGV S/. 2,441.08
--------------------
MONTO A CANCELAR M S/. 15,288.89