ACTIVITY HAZARD DESCRIPTION INITIAL ADDITIONAL CONTROL MEASURES RESIDUALRIS


RISK K
RATE RATE
Prepare PTW, confirm weather Forecast,
Prepare Rigging/ Lifting Falling person/ objects and injury Toolbox Talk-ensure all Work team understand
equipment. or fatality. Slippery structure work task and personnel familiar with the area
surfaces. 5 x 2 =10 and emergency escape route/ equipment. Low
Medium Preparation (Tools/Equipment), Secure work
site and radio check with all crew member and
CCR/ Control Room.
Hook cow’s tail/ lanyard when stand on the
exposed level (overboard).
All loose item/ tools/equipment will secure with
proper lanyard.
Inflated lifejacket to be worn. Standby Boat
available for over site work during operation.
not more than 500 meter from the location.
Rig up/Setting Rope Anchoring Falling and injury or fatality. Inspect equipment / tools prior to start work.
system Slippery structure surfaces. 3x1=3 Survey work areas to make sure identify the Low
Low hazards; secure equipment/tools.
Supervisor close visual contact with Technicians
Ascending/Descending/Maneuve Falling and injury or fatality 5 x 2 =10 while in progressing the work. Low
r. Medium Independent anchoring system on every set of
ropes system..
Rope access supervisor will check suitable
anchoring system and monitoring movement of
technicians and ropes transfer.
Form:
Rev: 0
Eff date:
JOB SAFETY ANALYISIS & HAZARD CONTROL

Working at Windy Weather Falling and injury or fatality 1 x 1 =1 Assess the wind and vision prior to work. Stop Low
Condition. when wind is in access (IRATA Level III
Low assessment. Report to CCR/ site rep. prior
commence the job.(18-20 knot) depending on
the area.

Drink sufficient fluids and water, do not work


Working at height weather The dehydration and heat stroke 1x 1 =1 continuously under direct sun heat. Low
temperature and humidity Low

Concurrent operation and Falling Objects causing injury 4 x 1 =4 Barricade the working Area before commence
conflict with activity above work Low any activity and ensure no other operations was Low
areas carried out on that area. Inform Supervisor in
charges to make sure no job to be done above
rope access activity.

Collapse and Fall 3x2=6 Do not work more then 3 hours continuously Low
Fatigue Medium on ropes. Safety reason.

Poor House Keeping Causing injury to themselves and 1 x 1 =1 Maintain work place clean and tidy all the time Low
other/ properties Low to prevent tripping hazards.

COMPLETED BY DESIGNATION DATE