Sunteți pe pagina 1din 7

Ecolibrium

THE OFFICIAL JOURNAL OF AIRAH MARCH 2018 · VOLUME 17.2


RRP $14.95
PRINT POST APPROVAL
NUMBER PP352532/00001

Common
good
  Games facility
A
built for all.
COV ER FE ATURE

Common good
As one of the key venues for the Gold Coast 2018 Commonwealth Games to be held next month,
the Gold Coast Sports and Leisure Centre has been designed to accommodate a range of sports,
with both the short and long term in mind. Sean McGowan reports.

Located on the Nerang-Broadbeach Totalling some 16,500m², the centre As well as the City of Gold Coast having
Road in Carrara – adjacent to also accommodates meeting and function permanent offices within the facility,
Metricon Stadium – the $105 million rooms, associated support facilities, it is also anticipated that the centre will
Gold Coast Sports and Leisure Centre 460 underground carparking spaces, become home to Queensland’s premier
is a multi-purpose facility incorporating and the new headquarters and training state representative sporting bodies.
two 6,000m² mixed-use indoor halls home of the Gold Coast Suns (AFL) In “Games mode” this April, the centre
connected by a pedestrian plaza. Football Club. will play venue to four sports: badminton,

38 ECO L I BR I U M  •  M A RCH 2018


COV ER FE ATURE

In “Legacy” mode after the


Commonwealth Games, the centre will
become an important community facility.

para powerlifting, weightlifting and BALANCING NDY project leader and senior associate
wrestling. The Hall 1 show hall will John McIntosh says the main challenge
feature a grandstand capacity of 5,300 STAKEHOLDER NEEDS was working with so many stakeholders,
people (including players and officials). NDY’s involvement in the project who all had their own needs and
began with an invitation to tender for requirements.
After the Games, the venue will
become an important community the building services design works – “The key stakeholders were the
facility. In “Legacy mode”, it will support including ESD – as part of the BVN Department of State Development,
a range of ball sports, including elite and Architects’ (as principal consultant) whose focus was capital cost and
community-grade basketball (14 courts), submission to the Queensland program; the City of Gold Coast whose
netball (10 courts) and badminton. Government’s Department of State main focus was legacy and ongoing costs;
It will also provide vital space for Development (DSD). and the Gold Coast 2018 Commonwealth
exhibitions and community events. The consultant was initially engaged for Games Corporation (GOLDOC), whose
pre-design and schematic design phases focus was firmly on Games mode and
To cater for such varying use and
through the principal consultant in what infrastructure could be built into
occupancy numbers, the Gold Coast
November 2013. NDY was later novated the legacy works to cater for the Games.”
Sports and Leisure Centre features
a unique, energy-efficient multi-mode to the managing contractor, Hansen A number of community stakeholders
ventilation design by building services Yuncken, to complete the design and associated with the various sporting
and ESD engineer, Norman Disney & oversee the project through the tender groups to be accommodated in
Young (NDY). and construction phases. the facility were also consulted.

M A RCH 2018 • ECO L I BR I U M 39
COV ER FE ATURE

The halls have been


designed to minimise
air conditioning.

These included groups representing centre to operate in natural ventilation naturally ventilated facility for legacy
basketball, netball and badminton. mode or mechanically assisted ventilation community sports use, with “bump-in”
modes. The idea was to minimise the air conditioning provided for Games
“The stakeholders attended every design
requirement for the halls to operate full mode. However, the City of Gold Coast
meeting and workshop throughout
air conditioning. (as the building owner and operator)
the design stages,” McIntosh says,
also wanted the ability to stage major
“and actively contributed to the design “Energy efficiency, capital cost and
sporting, leisure and exhibition events
outcomes.” ongoing running costs were all at the
throughout the year, with a view towards
forefront of design discussions with the
From the initial design meeting, NDY permanent air conditioning as and when
stakeholders,” Gentner says.
project director Andrew Gentner, needed.
M.AIRAH, says a key driver for the The initial brief from the Department
Through design “optioneering”,
project was to maximise the ability of the of State Development was to provide a
verification and cost analysis, it
was determined the temporary air
conditioning solution for the Games only
was both inefficient and unnecessarily
expensive.


The Gold Coast
Sports and
Leisure Centre
features a unique,
energy-efficient
multi-mode
ventilation
design

Temporary air conditioning for the Games


40 ECO L I BR I U M  •  M A RCH 2018 was ruled out as an option.
COV ER FE ATURE

Particular attention was also given


to the design of the system to cater for
LESSONS FROM THE CONSULTANT badminton – one of four feature sports
to be hosted at the Games.
NDY project leader and senior 2. Understand all the
associate John McIntosh shares different stakeholder briefs “Extensive heat-load modelling was
some of the lessons learned undertaken to establish the optimum
3. Determine the most suitable
from the Gold Coast Sports sizing for the layout and selection
design strategy to address
and Leisure Centre project. of ductwork and diffusers to meet
all brief requirements badminton air movement requirements,”
1. Listen to and involve 4. Ensure stakeholder buy-in to says McIntosh.
the stakeholders the proposed design strategies.
Under badminton conditions, a
minimum of 1.5 air changes per hour,
and a maximum of 0.1m/s air velocity
It also offered no legacy benefit This was vital to prove the performance across the field of play are required
to the community. of each of the ventilation steps. so as to minimise air currents and the
This led to the mechanical services “drift” of the shuttlecock as it moves
brief being amended to include SIZING THE SYSTEM across the court.
the provision of full air conditioning One of the key design challenges of the
to the halls. The ability of the centre multi-mode system was in sizing the air ENERGY
to operate in natural ventilation
mode, or mechanically assisted
conditioning systems to best cater for EFFICIENT DESIGN
both Games and legacy populations.
ventilation modes had to maximised. The central chilled water plant designed
This minimises the requirement McIntosh says the initial Games-mode by NDY comprises two large centrifugal
to operate full air conditioning. occupancy levels were briefed by the chillers, and a low-load chiller located
Department of State Development and in a rooftop plant room, with cooling
GOLDOC. towers adjacent. This chilled water is
MULTI-MODE distributed to dedicated AHUs serving
In response, NDY designed a unique The following table summarises the
each functional area.
multi-mode ventilation system that various design populations the facility
minimises the energy consumption of was required to accommodate. Constant-volume units serve the halls
the facility while maximising occupant and function rooms, while variable-
As well as CFD modelling, extensive
comfort. volume units were used to serve the
heat-load modelling was undertaken
council offices and the Gold Coast Suns
This resulted in the provision on all operating scenarios.
facilities. All AHUs and fan-coil units
of a four-step ventilation solution with: This optimised the size and configuration (FCUs) feature high-efficiency motors,
Step 1: Operation of façade louvres of the central chilled water plant, as well with economy cycle operation and
to provide natural ventilation as sizing the air handling units (AHUs). outside-air control provided to the AHUs.

Step 2: Operation of high-volume,


low-speed fans in conjunction
with the louvres Design population summary table
Step 3: Mechanically assisted
Legacy Legacy Legacy Legacy
ventilation utilising the Part Games
Mode Mode Mode Mode Hall 2
hall smoke exhaust fans of Project Mode
Sport Exhibition Major Event Major Event
Step 4: Full air conditioning.
Hall 1
This system was designed to be controlled 2,750 5,000 1,500 5,202 500
Show Hall
by the building management system (BMS)
based on ambient and internal conditions, Hall 2
with optional operator input in relation to Community 2,750 500 1,500 500 4,000
Hall
the particular use, if required.
“The Gold Coast climate provided Gold Coast
206 206 206 206 206
opportunity to maximise natural and Suns
mechanical ventilation of the halls,” Level 2
says Gentner. Function 1,089 1,089 1,089 1,089 1,089
Extensive computational fluid Facilities
dynamics (CFD) modelling was Level 3
undertaken to determine the optimal Commentary – 8 – 8 –
arrangement, location and orientation Box
of intake louvres, as well as fan locations
and mechanical ventilation openings. Source: NDY

M A RCH 2018 • ECO L I BR I U M 41
COV ER FE ATURE

All building services have also been


designed to sit above the designated
flood level.

BENCHMARKING
The design of the Gold Coast Sports
and Leisure Centre sets a new standard
in occupant comfort in relation to the
use of natural and multi-mode ventilation
systems in a sub-tropical environment.
It also measures up so far as energy
efficiency is concerned.
As per the requirements of the design
Totalling 16,500m2, the centre accommodates the HQ and training facility
brief, benchmarking against the GBCA’s
for the AFL’s Gold Coast Suns. Green Star – Public Building v1 rating
tool, as well as the One Planet Living
To further the energy efficiency of number of mechanical ventilation steps Design Principles, was completed.
the systems, variable-speed drives available to suit the particular use or
(VSDs) are installed on all fans and One Planet Living forms a holistic
event,” says Gentner.
pumps. An energy metering system framework to provide guidance for local
is also installed. “For example, for recreational sporting government, businesses and the built
events, the full air conditioning step environment – comprehensively addressing
Importantly, the system design provides may be disabled, allowing the BMS key sustainability issues and effectively
flexible operation of the systems to suit to automatically control between the making a sustainable lifestyle a reality
all combination of centre uses at any remaining available steps. For Show (see breakout).
particular time.
Court use, exhibitions or trade events, “These 10 principals are set as goals
“The mechanical system enables the all mechanical ventilation steps can for the Commonwealth Games events,”
operator, via the BMS, to nominate the be made available.” says Gentner. “Consequently, the Gold

Mechanical services layout Hall 1 (Show Hall)  Mechanical services layout Hall 2 (Community)

42 ECO L I BR I U M  •  M A RCH 2018


COV ER FE ATURE

GAMES READY
MULTI-MODE VS MIXED MODE After reaching project completion in
February 2017, the Gold Coast Sports
According to NDY’s Andrew Gentner, M.AIRAH, there are a number and Leisure Centre hosted its first event
of key differences between the unique multi-mode system designed for – the 2017 Sudirman Badminton Cup
the Gold Coast Sports and Leisure Centre, and the mixed-mode systems – in late May 2017.
commonly found in commercial building projects.
“The HVAC systems continue to operate
“Mixed mode is more of a hybrid system, with a single plant operating in one as designed,” says McIntosh. “And feedback
or two operating modes,” says Gentner. from the City of Gold Coast and the Gold
Coast Suns has been very positive.
“The HVAC design for the Gold Coast Sports and Leisure Centre is a true
multi-mode system utilising several unique systems in either stand-alone mode or “The result shows that with careful
a combination of manual or temperature-controlled and stepped parallel systems. planning and use of computer modelling,
even in a subtropical environment
“This design maximises natural ventilation, minimises unnecessary
the use of natural and mechanically
use of mechanical ventilation or air conditioning and therefore maximises
assisted ventilation can provide comfort
energy efficiency and minimises ongoing operational cost to the council.”
conditions, while still offering the
flexibility to provide full air conditioning
for specific events.”
Coast Sports and Leisure Centre has Says Gentner: “The modelled As a key venue of the Gold Coast 2018
incorporated a number of ESD features energy consumption of 4,400,000kWh Commonwealth Games, the Gold Coast
to align with these principals and ensure per annum is expected to be significantly Sports and Leisure Centre stands ready as
sustainable design outcomes.” reduced by up to 30 per cent through the world’s sporting attention turns to the
the use of the multi-mode ventilation Gold Coast from April 4, 2018.  ❚
The centre’s design also exceeds the
system.”
minimum performance requirement
of National Construction Code, Section J.
PROJECT AT A GLANCE
One Planet Living design principles
The personnel
Making buildings more energy efficient ■ Architect:  BVN
Zero Carbon and delivering all energy with renewable ■ Builder:  Hansen Yuncken
technologies.
■ Building services engineer:  NDY
Reducing waste, reusing where possible, ■ Client:  Department of State
Zero waste
and ultimately sending zero waste to landfill. Development, Infrastructure
& Planning
Encouraging low carbon modes of
■ ESD engineer:  NDY
Sustainable transport transport to reduce emissions and reducing
the need to travel. ■ Mechanical services
contractor:  Coolmaster
Using sustainable healthy products, ■ Structural engineer:  Bligh Tanner
Sustainable materials with low embodied energy, sourced locally,
made from renewable or waste resources. The equipment
Choosing low impact, local, seasonal ■  AHUs:  Cooling & Heating
Local and sustainable food
and organic diets and reducing food waste.
■ Air and dirt separators:
Using water more efficiently in buildings Masterflow Solutions
Sustainable water and in the products we buy; tackling ■ BMS:  Austec
local flooding and water course pollution. ■ Cooling towers:  BAC
■ Chillers  Daikin
Protecting and restoring biodiversity and
Land use and wildlife natural habitats through appropriate land ■ Dampers:  Polyaire
use and integration in the built environment. ■ Diffusers:  Polyaire
■ Fans:  Fantech, Pacific HVAC
Reviving local identity and wisdom;
Culture and community ■ Heat recovery (pool): 
supporting and participating in the arts.
Air Change Australia
Creating bioregional economies ■ Silencers and attenuators:
Equity and local economy that support fair employment, inclusive Fantech
communities and international fair trade. ■ Pumps:  WILO
Encouraging active, sociable, meaningful ■ VAV boxes:  Barcol Air
Health and happiness (Source: NDY)
lives to promote good health and wellbeing.

M A RCH 2018 • ECO L I BR I U M 43

S-ar putea să vă placă și