Client: WILLIAMS GAS PIPELINES Location: MOORESVILLE, NC
Equipment ID: Unit Name: AIR TANK 2
Manufacture. No. National Board No. Construction Code:
Manufacturer: Year: Capacity/ Weight:
Design Temp: Design Pressure: M.A.W.P:
Condition (Check ONE)
ID Item Good Fair Poor NA NI Comments 1 Foundation V MINOR HAIRLINE CRACKS NOTED 2 Support Type SADDLE 3 Support Condition V COATING FAILURE EVIDENT. 4 Anchor Bolts V LOCK TYPE WASHERS SHOULD BE CONSIDERED INSTALLING 5 Ladders V 6 Platform V 7 Appurtenances V 8 Grounding V BETTER SELECTION SHOULD BE CONSIDERED 9 Relief Valves V 10 Welds V 11 Shell 11.1 Protective Coat Condition V TWO (2) MINOR LOCALIZED AREAS NOTED 11.2 Corrosion 11.3 Insulation Condition 12 Head 12.1 Head type (Elliptical, etc.) ELLIPTICAL 12.2 Protective Coat Condition V 12.3 Corrosion 12.4 Insulation / Jacket 13 Nozzles 13.1 Protective Coat Condition V 13.2 Corrosion 13.3 Insulation / Seal Condition 13.4 Bolting Condition V 13.5 Flange Condition (leaks) V ACTIVE CREVICE CORROSION NOTED