Process Installation of Concrete Placing Boom Prepared By Approved By Ref No


Location Overall DEC Site Name N.Munusamy K.I Choi T.W Kim 006
C&S C&S Safety Safety
Project St. Regis KL Hotel Project Designation PM Rev No
Supervisor Engineer Health Officer Manager
Project Ref DEC/HSES/SR/14/001 1
Signature
OSHA 1994 - Act 514 Effective Date
Legal Req
FMA 1967 – Act 139 Date 01/02/2014 01/02/2014 01/02/2014 01/02/2014 01/02/2014 01/02/2014
Hazard Identification (HI) Risk Assessment (RA) Determining Control (DC)

No Activity Hazard Effect Current Control Severity Likelihood Risk Level Additional Control Responsibility

1. Material Handling  Communication Serious injury - Competent talkie-man 4 B B4  No activity shall be carried out below Site Supervisor
between tower Fatality - Regular briefing to talkie-man (MID) the hoisting radius
crane operator and and crane operator  To ensure the materials are not Safety
talkie-man - Lifting apparatus to be checked obstructing the access. Supervisor
 Wrong instruction- daily  To barricade working area and
Unclear instruction warning sign to ensure no
- Use correct lifting apparatus for
 Communication trespassing and other activity been
hoisting
interference due to carry out.
- Ensure material stacked
cross line  Person In-Charge/Competent person
properly
 Lifting apparatus that responsible for the task to
failure - Use tag line to stabilize hoisting ensure his/her workers been provide
 Being hit by material with P.P.E and be worn during work
moving materials- - Work been done should be been done.
Exceeding lifting strictly followed manufacturer
limit/overload manual.
 Material not
stacked properly

2. Installation of Base  Unplanned work Serious injury - Works briefing to workers before 4 B B4  Gauge must be in working condition Site Supervisor
Mast  Inadequate Fatality commence of work (MID) for gas cylinder
tool/material - Experienced worker  Place gas cylinder in upright position Safety
 obstruction / poor - To clean work place before and or trolley supervisor
housekeeping after work  To wear welding shield & glove
 No proper oxy - Tools and material must be
cutting equipment sufficient
 Improper welding - Must have fire extinguisher
 Falling object from - Ensure oxy cutting equipment in
upper level good condition
- Use tag line to stabilize hoisting
material
Hazard Identification (HI) Risk Assessment (RA) Determining Control (DC)

No Activity Hazard Effect Current Control Severity Likelihood Risk Level Additional Control Responsibility

- Ensure welding work are done


properly
- Ensure all bolts and nuts are
tight properly
- Wear PPE at all time
- Install as per PE approved
design

3. Installation Of:  Unplanned Serious injury - Briefing to workers before 4 B B4  To inspect before start work Site Supervisor
3.1 - Tubular Column installation Fatality commence of work (MID)
3.2 - Collar Frame  Inadequate tool / - Experienced worker Safety
3.3 - Turn Table with material - Well planned installation supervisor
3.4 Operator Platform  Improper / - To clean works space before
3.5 - Counter weight unbalance lifting and after work
3.6 - Boom section  Work during rain - To wear proper PPE at all time.
3.7 - Testing and calibrate the  Falling object Safety harness is mandatory
crane while working
- Tools and materials must be
Sufficient
- Ensure no activities below
hoisting radius
- To cordon off below the working
area
- Ensure all the bolts and nuts are
tight properly
- Use tag line to stabilize
hoisting material
- Lifting crane should have
sufficient lifting capacity and in
good condition (Tower Crane)

4. Electrical Installation  Electrical Shock Major health - Competent person 3 B B3 Site Supervisor
 Work during rain effect/injury - Inspection by Wireman (LOW)
 Overhead - Using cable that approved by
electrical cable government
RISK ASSESSMENT MATRIX (RAM)

CONSEQUENCE PROBABILITY (INCREASING LIKELIHOOD)


SEVERITY

A B C D E

People Assets Environment Reputation Heard of in Incident has Happens several Happens several
Never heard of in
construction occurred in our times per year in times per year in this
construction industry
industry corporate our corporate project

No Health No damage<
0 effect/Injury
No effect No impact A0 B0 C0 D0 E0
$500

Slight health Slight damage


1 effect/injury $500- Slight effect Slight impact A1 B1 D1 E1
(FAC) $1,000 C1

Minor Health
Minor damage
2 effect/injury Minor effect Limited impact A2 B2 C2 D2 E2
$1,001-$5,000
(MTC/RWC)

Major health Localized


damage Localized Considerable
3 effect/injury
effect impact
A3 B3 D3 E3
(LWC) $5,001-$50,000 C3

Major damage
4 1 Fatality $50,001- Major effect National impact A4 B4 C4 D4 E4
$1,000,000

Extensive
Multiple International
5 fatalities
damage> Massive effect
impact
A5 B5 D5 E5
$1,000,000 C5