Documente Academic
Documente Profesional
Documente Cultură
Maximum : 830 m
Minimum : 740 m
iv. Head Race Tunnels : Two nos concrete lined HRTs (HRT-3 & HRT-4)
Dia 8.5 M, Length HRT-3: 932m, HRT–4 :1060m already constructed
Number : 2 composed of two horizontal galleries, linked with a vertical shaft.
vi. Penstocks
Output
-Nominal value : 278 MVA
Length :
TRT-3 : 1081 m