Sunteți pe pagina 1din 2

TECO Services Limited Customer

Address
Rumuomasi, Port Harcourt
Date

QUOTATION FOR SUPPLY OF CO2 SYSTEM(SHELL RA CLUB RESTAURANT)

ITEM DESCRIPTION UNIT QTY UNIT PRICE(USD)


MECHANICAL
1 45kgCO2 Cylinder C/W gas (master) no 1 3,284.36
2 45kgCo2 Cylinder C/W gas (slave) no 7 2,605.74
3 Discharge Nozzle no 10 350.77
4 Flexible discharge Hose C/W non‐return valve no 8 288.57
5 Flexible hose (manifold slave) no 1 352.93
6 Flexible pivot loop (slave to slave) no 7 352.00
7 8 port Discharge Manifold no 1 2,750.00
8 High pressure heat valve no 1 450.13
9 Continuous gas weight monitoring system
for 8 Cylinder and rack set 1 11,840.82
10 Blade steel schedule 40 pipes and accessories lot 1 2,278.12
TOTAL

ITEM DISCRIPTION UNIT QTY UNIT PRICE


1 3+1 EXTINGUISHHING Control Panel no 1 1,562.50
2 2×12 V Dc battery set 1 78.75
3 Smoke Detector no 6 99.29
4 120‐140˚C Heat Detector(Explosion Proof) no 4 440.25
5 Manual Release Station no 3 894.68
6 Pre‐discharge Bell no 4 120.78
7 Post Discharge Sounder Flasher no 3 252.51
8 Post Discharge Sounder Flasher/Flasher(External) no 3 258.00
9 Pressure‐Switch(Optional) no 1 989.34
10 Abort Switch no 1 356.67
11 25mm G.1 Conduit pipes and accessories lot 1 2,318.51
12 1.5mm2 2 core Fire Rate Cable m 300 2.68
TOTAL

SUMMARY
1 Mechanical
2 Electrical
3 INSTALLATION CHARGES
Grand Total
Port Harcourt

27/06/2014

TOTAL COST(USD)

3,284.36
18,240.21
3,507.70
2,308.56
352.93
2,464.00
2,750.00
450.13

11,840.82
2,278.12
47,476.83

COST
1,562.50
78.75
595.71
1,761.00
2,684.04
483.12
757.53
774.00
989.34
356.67
2,318.51
804.00
13,165.17

47,476.83
13,165.17
15,625.00
76,267.00

S-ar putea să vă placă și