Sunteți pe pagina 1din 5

SADHASIVAM, SENTHIL KUMAR

From: MURUGAN, SURESH


Sent: Wednesday, March 07, 2018 11:22 AM
To: SADHASIVAM, SENTHIL KUMAR
Cc: THIRUVENGADAM, GOPINATH
Subject: FW: ATTACHED COMPLETE SETS OF REVISED DRAWINGS, GTP & CALCULATION FOR
12/16MVA , 66/33kV POWER TRANSFORMER>
Attachments: 16 MVA REV 2 Approved Diagram.pdf; 16 MVA REV 2 Approved GTP.pdf

PFA .

From: MURUGAN, SURESH


Sent: Tuesday, December 19, 2017 5:16 PM
To: 'Mukesh Agarwal'; THIRUVENGADAM, GOPINATH
Cc: tjshah@atlantaelectricals.com; 'A.K.MATHUR'; shanmugam@atlantaelectricals.com; 'Hemang'; DEVARAJ,
SARAVANAN; GURUNATHAN, SHANMUGAVADIVEL; GOPAL, SATISHKUMAR; GANESAN, SELVAM
Subject: RE: ATTACHED COMPLETE SETS OF REVISED DRAWINGS, GTP & CALCULATION FOR 12/16MVA , 66/33kV
POWER TRANSFORMER>

Dear Sir

Please find the Approved Rev-2 Diagram & GTP.

Note: Kindly Provide LV Inspection cover on Tank for future in case failure.

Please proceed for Manufacturing ..

Thanks & Regards


Suresh.M
SIEMENS Gamesa Renewable Power Pvt. Ltd.
# 334, 8th Floor, Block-B, The Futura Tech Park,
Sholinganallur, Chennai-119.
Mobile : +91 7550098826,
Tlfno. +91 44 39242424, Extn: 31332.

From: Mukesh Agarwal [mailto:mukesh.agarwal@atlantaelectricals.com]


Sent: Monday, December 18, 2017 3:07 PM
To: THIRUVENGADAM, GOPINATH; MURUGAN, SURESH
Cc: tjshah@atlantaelectricals.com; 'A.K.MATHUR'; shanmugam@atlantaelectricals.com; 'Hemang'; DEVARAJ,
SARAVANAN; GURUNATHAN, SHANMUGAVADIVEL; GOPAL, SATISHKUMAR; GANESAN, SELVAM
Subject: RE: ATTACHED COMPLETE SETS OF REVISED DRAWINGS, GTP & CALCULATION FOR 12/16MVA , 66/33kV
POWER TRANSFORMER>
Importance: High

Dear Sir,

1
Please find the attached Revised Drawings, Calculation sheet & GTP for 12/16MVA, 66/33kV Power Transformer with
comments incorporated as per your mail Dtd: 12.12.17

Also find our point wise reply in RED bold letter in trailing mail for each comments on drawings.

You are requested to send us the final approved drawings by today itself to take further course of action from our end.

Also you are requested to discuss the matter with NIFPS team to approve the NIFPS drawing immediately.

Do not hesitate to contact us, in case you need more details.

Best Regards,
Mukesh Agarwal
Manager-Marketing
Direct : +91 265 3923284 Board : 3923200 / 3923210
Mobile:- 8156055575

www.atlantaelectricals.com
Gujarat Spun Pipe Compound, P.O. Samiala, Padra Road, Vadodara, Gujarat, India – 391410
Works : 1503-4, Phase-IV, V.U.Nagar, Anand, Gujarat, India -388121
ISO 9001 : 2015, ISO 14001:2004 & OHSAS 18001:2007 Certified Company
 We have a responsibility to the environment. Before printing this e-mail or any attachment herewith, consider if a print is
really necessary.

From: THIRUVENGADAM, GOPINATH [mailto:TGOPINATH@gamesacorp.com]


Sent: 12 December 2017 12:19
To: Mukesh Agarwal; MURUGAN, SURESH
Cc: tjshah@atlantaelectricals.com; A.K.MATHUR; shanmugam@atlantaelectricals.com; Hemang; DEVARAJ, SARAVANAN;
GURUNATHAN, SHANMUGAVADIVEL; GOPAL, SATISHKUMAR; GANESAN, SELVAM
Subject: RE: ATTACHED COMPLETE SETS OF REVISED DRAWINGS, GTP & CALCULATION FOR 12/16MVA , 66/33kV
POWER TRANSFORMER>

Dear Sir,

Kindly find below the comments in the attached drawing. Kindly incorporate the below comments and submit the
revised drawing.

1. Project Title: 66/33 KV Substation at Sonahalli, Bellary, Karnataka. ------------------- We have corrected project
name in all drawings as per your comment.
2. In Flux density Calculation, Detailed Core area calculation to be furnished. --------- Calculation sheet attached.
3. Current density calculation to be provided. -------- Calculation sheet attached.
4. Provide Radiator Manufacture’s Chart for Heat dissipation ------ Calculation sheet attached.
5. Difference in Heat dissipation observed for same dimension of Radiator – Clarify? ----- Calculation sheet
attached.
6. Load Loss should be considered for extreme minimum tap and corresponding heat dissipation to be calculated.
---- Calculation sheet attached.
7. Rail gauge distance should be 1676 mm instead of 1436 mm. ----- We have corrected Rail gauge = 1676mm
8. Inspection cover should be provided on L.V Side. ------ We have provided Item no.25 – inspection cover on LV
side.

2
9. Pin Insulator support to be provided for L.V Neutral flat grounding. ----- We have provided Pin Insulator
support for LV neutral flat grounding.
10. Transport Oil level gauge is not shown in BOM. ----- We have corrected BOM with item no. 54 - Transport Oil
level gauge on Dwg Part List no. AT09/1495 Q/A2
11. Air release plug(2 No’) should be provided on Transformer top cover in additional to inspection cover ----- We
have provided 2 Nos. Air release plug on Transformer top cover in additional to inspection cover.
12. Transformer Side Plate thickness should be 8 mm instead of 6 mm. ----- We have corrected Side Plate thickness
8 mm instead of 6 mm on Dwg No. AT09/1494 Q/A1
13. Only 2 No’s of Top Cover lifting lugs shown in drawing – Confirm? ----- We have confirm that 2 No’s of lifting
lugs for Top Cover
14. Earthing Pads should be provided on diagonally opposite ends of transformer tank ----- We have provided
Earthing Pads on diagonally opposite ends of transformer tank
15. Tinned Copper flat should be provided for Earthing. ----- We have provided item no. 35 Tinned Copper flat for
earthing on Dwg Part List no. AT09/1495 Q/A2
16. OLTC Equalising pipe and Turret Equalizing pipe should be provided ----- We have provided item no. 58 OLTC
and Turret Equalizing pipe on Dwg Part List no. AT09/1495 Q/A2
17. All Cables should be armored and laid on closed cable tray. ----- We have provided armored Cables and laid on
cable tray with cover
18. All Hardware’s should be HDG. ----- We have provided All Hardware’s shall be HDG hardware
19. Quantity(Weight) of Silicagel Breather should be provided. ----- We have provided 5 Kg & 1 Kg Silica gel
Breather
20. L.V Phase CT & Neutral CT should be 300/1 A and 300/1-1 A respectively(Ref Mail dt: 29/11/17 from Mr. Suresh)
---- Please refer to Mr. Murugan Suresh mail Dtd: 04.12.17 for confirmation of LV phase CT & LV Neural CT
should be 400/1A & 400/1-1A respectively.

With regards,

Gopinath. T

From: Mukesh Agarwal [mailto:mukesh.agarwal@atlantaelectricals.com]


Sent: Tuesday, December 05, 2017 5:34 PM
To: MURUGAN, SURESH
Cc: tjshah@atlantaelectricals.com; A.K.MATHUR; shanmugam@atlantaelectricals.com; Hemang; DEVARAJ, SARAVANAN;
GURUNATHAN, SHANMUGAVADIVEL; GOPAL, SATISHKUMAR; GANESAN, SELVAM; THIRUVENGADAM, GOPINATH
Subject: RE: ATTACHED COMPLETE SETS OF REVISED DRAWINGS, GTP & CALCULATION FOR 12/16MVA , 66/33kV
POWER TRANSFORMER>
Importance: High

Dear Sir,

Please find the attached Revised Complete sets of Drawings & GTP along with calculation sheet for 12/16MVA, 66/33kV
for your Final Approval with incorporating all your comments as per your mail Dtd: 27/11/2017.

We will submit NIFPS drawings with incorporating comments by tomorrow. We have come to know from Mr. Prakash
of Easun-MR, that Easun-MR have visited M/s. Siemens Gamesa site and M/s. Siemens Gamesa have submit more
comments on Drawings. So Easun-MR will submit the drawings by tomorrow and same to be forwarded by incorporating
all comments.

In the mean time you are requested to send us the final approval on attached drawing along with manufacturing
clearance immediately to proceed further so that we can meet the delivery.

Do not hesitate to contact us, in case you need more details.

3
Best Regards,
Mukesh Agarwal
Manager-Marketing
Direct : +91 265 3923284 Board : 3923200 / 3923210
Mobile:- 8156055575

www.atlantaelectricals.com
Gujarat Spun Pipe Compound, P.O. Samiala, Padra Road, Vadodara, Gujarat, India – 391410
Works : 1503-4, Phase-IV, V.U.Nagar, Anand, Gujarat, India -388121
ISO 9001 : 2015, ISO 14001:2004 & OHSAS 18001:2007 Certified Company
 We have a responsibility to the environment. Before printing this e-mail or any attachment herewith, consider if a print is
really necessary.

---------- Forwarded message ----------


From: "MURUGAN, SURESH" <MUSURESH@gamesacorp.com>
Date: Mon, Nov 27, 2017 at 6:44 PM +0530
Subject: 12/16 mva , 66/33kv power transformer. Mail 1 OF 2
To: "mukesh.agarwal@atlantaelectricals.com" <mukesh.agarwal@atlantaelectricals.com>
Cc: "tjshah@atlantaelectricals.com" <tjshah@atlantaelectricals.com>, "shanmugam@atlantaelectricals.com"
<shanmugam@atlantaelectricals.com>, "akmathur@atlantaelectricals.com" <akmathur@atlantaelectricals.com>,
"hemang.shah@atlantaelectricals.com" <hemang.shah@atlantaelectricals.com>, "DEVARAJ, SARAVANAN"
<DSARAVANAN@gamesacorp.com>, "GURUNATHAN, SHANMUGAVADIVEL"
<GSHANMUGAVADIVEL@gamesacorp.com>, "GOPAL, SATISHKUMAR" <GSATISHKUMAR@gamesacorp.com>,
"GANESAN, SELVAM" <GSELVAM@gamesacorp.com>, "THIRUVENGADAM, GOPINATH"
<TGOPINATH@gamesacorp.com>

Dear Sir

Please find the approved with comment diagram for 12/16mva , 66/33kv power transformer.

The following points in compile by manufacture before manufacturing


slno Description
1 GTP need to submit in Manufacturer Letter Head.
2 HV & LV winding STC rating need to mention
3 HV WTI CT Need to Provide
4 Repeater need to provide for HV WTI.
5 HV &LV Neutral flat shall be copper flat .
6 NIFPS Drain valve shall be Gate valve
7 HV Bushing & Neutral CT shall be 200/1-1A with PS
class.
8 LV Bushing & Neutral CT shall be 400/1-1A with PS
class.
9 Arching horn need to provide for HV Bushing
10 HV Terminal shall be bolted type suitable foe Drake
ACSR.
11 Cooler control incomer shall be MCCB .

4
The following calculation need to submit .
1) Current Density.
2) Flux Density.
3) Heat Dissipation.
4) Short circuit .
5) Painting Procedure .

Note; Kindly acknowledge after receipt of mail .

Thanks & Regards


Suresh.M
SIEMENS Gamesa Renewable Power Pvt. Ltd.
# 334, 8th Floor, Block-B, The Futura Tech Park,
Sholinganallur, Chennai-119.
Mobile : +91 7550098826,
Tlfno. +91 44 39242424, Extn: 31332.

S-ar putea să vă placă și