5'-6"

2'-3" 3'-9" 2'-6" 2'-6"


COMBINED FOOTING INDEX:

2'-3" 2'-3"
2'-5" 2'-1"
F1 C2 F2 F3 C2

5'-6"
F F1 6'-0'' 4'-6'' 15'' 6'' 20'' 18'' 6'' FOOTING SIZE
Total Padestal Steel
Parallel to Parallel to
Depth Layer

2'-9"
C1 Depth Length Width
F2 5'-6'' 5'-6'' 18'' 6'' 20'' 18'' 6'' Top Lyr. 10 Tor @ 6" c/c 12 Tor @ 6" c/c
6' C.F-1 12'-10"x 6'-0" 10" 6"
2'-9" 2'-9" F3 5'-0'' 4'-6'' 15'' 6'' 20'' 18'' 6'' Bott. Lyr. 12 Tor @ 5" c/c 12 Tor @ 6" c/c
10'-11"

F4 5'-0'' A/S 15'' 6'' 20'' 18'' 6''


5'-6" GL
2'-3" 3'-9" 2'-6" 2'-6"

2'-3" 2'-3"
C. Footing C. Footing
2'-5" 2'-1"
F1 C2 F2 F3 C2 Bott. Lyr Steel Bott. Lyr Steel

5'-6"
E Padestal
6" 6"

2'-9"
C1
2'-9" 2'-9" 3'' PCC (1:4:8)
3'' F.B Soling
11'-9"

4'' Local Sand

Typical section of CF
5'-6"
5' 3'-6" 2'-6"

2'-3" 2'-3"
C2 F2 F1 C. Footing Bott. Lyr Steel
2'

C2
5'-6"

D 2' 7'-10" 2' 75 75


C1
2'-9"

PLAN
DETAILS OF F1 TO F3
7'-10"

CB-1 2'-9" 2'-9"


56'-4"

3'-6" 2'-6"

65'-7"
2'-3" 2'-3"

F2 F1
C2
5'-6"

C
C2 C1
2'-9"
2'

12a
4'-1"
2'-9" 2'-9"
C. Footing Top Lyr Steel
13'-11"

PLAN OF C.F
450 450
a
3' 5'-6"
3'-6" 2'-6"
2'-6" 2'-6"

F2
2'-3" 2'-3"

F4 F1
5'-6"

B SECTION 1 - 1
2'-9"

C2 C1 C2 NOTE;- FOUNDATION FOR G + 3 STOREYED ONLY.

(typical detail of
2'-9" 2'-9" Lap in column)
11'-11"

FOUNDATION TO 1ST FLOOR Lv


COLUMN L 350 OR (14'') 350 OR (14'')
5'-6" SIZE B 250 OR (10'') 250 OR (10'')
4' 3'-6" 2'-6"
CONCRETE MIX M:20 M:20
2'-3" 2'-3"

F4 F2 F1
5'-6"

A SECTION WITH
5'

2'-9"

MAIN STEEL
C2 C1 C2
8-16Tor 4-16Tor+4-12 Tor
2'-9" 2'-9" FOUNDATION PLAN & DETAILS
LINKS
8Tor @
2'-3" 10' 2'-7" 10'-9" 100/150 C/C.
25'-7" DETAIL - 'R'

01 02 03 04 05 COLUMN MKD C1 C2
S-1