Sunteți pe pagina 1din 202

Republic of the Philippines

Department of Public works and Highways PAYMENT CERTIFICA


Region-IV-A CERTFICATE OF PAYMENT NUMBER
Batangas 1st District Engineering Office
OFFICE OF THE DISTRICT ENGINEER For the period 7-Apr-14 to 4-Jul-14 SHEET NO. 1 of
Batangas City DATE:
15. I HEREBY CERTIFY that the attached statement
of work is correct and just and does not
NAME OF PROJECT : Construction & Rehabilitation of of MPB Structure (Covered Court) include items and/or portions thereof for CERTIFIED AND FOUND
Brgy. Halang, Taal, Batangas which payment has already been received. In CORRECT PAYMENT
regard to item covering advance payment for RECOMMENDED:
NAME OF CONTRACTOR: LIBRIUS CONSTRUCTION & SUPPLY CORP. materials, the said materials are on site
and are properly protected.
ORIGINAL CONTRACT AMOUNT: - - - - - - - - - - Php 4,704,200.60 GODOFREDO C. DE
REVISED CONTRACT AMOUNT: ---------- Chief, Construction S
JOSE ARISTEO M. LUANCING
1. Total Value of Work to Date - - - - - - - - - - - - - Php 4,704,200.60 Contractor or Representative CHECKED AND RECOM
2. Total Value of Work Previously - - - - - - - - - - - FOR PAYMENT:
3. Total Value of Work this Billing - - - - - - - - - - 4,704,200.60 16. I HEREBY CERTIFY that the materials incor-
4. DEDUCTIONS: (a) 10% Retention - - - - - - - porated in this Certificate of Payment have
(b) 2% Expanded Witholding Tax - - - - 84,003.58 been verified and tested in accordance with BENCIO A. AGUZ
c) 5% Value Added Tax ---- 210,008.96 specifications. Officer-in-Charg
(d) Recoupment from Advance ---- Office of the Asst. Distric
(e) Others (Specify) ---- APPROVED FOR PAYME
5. AMOUNT OF TOTAL DEDUCTION ---- 294,012.54 CECILIA N. BARTE EUFROSINA M. MALIGAYA
6. Amount Approved for Payment ---- Engineer II Chief, Quality Control Section
7. Foreign Component of Billing
'( % of ) ---- 17. I HEREBY CERTIFY that the quantity of JULIANA D. VERG
8. Local component approved amount ---- work approved for payment in the Officer in Charg
9. Foreign Currency Equivalent of attached statement have been accomp- Office of the District E
Foreign Component ---- lished ; that the quantities including
10. Less: Peso Cost Financing to be paid materials brought to site but not incor- Scheduled Physical Prog
directly ADB/IBED/LECF, etc. porated in the work are correct and Actual Physical Progress
under category % of 5 ---- consistent with all previous recommen- Slippage (+) or (-)
11. Less Local Expenditures dations for payment and that the work Contract Expiry Date:
under category % of 5 ---- quantities and amount are consistent with
12. Less Request No. _____for previous the requirements of the contract.
Payment of Materials on hand ----
13. Add: Request No. ____ for materials
curently on hand - - - - - - - - - - - - - - - - - FRANCISCO M. LIMETA JR.
14. NET AMOUNT DUE TO CONTRACTOR - - - - PhP 4,410,188.06 Project Engineer
WHENEVER APPLICABLE, OTHERWISE THESE
WILL NOT BE FILLED UP OR SHOULD BE
REVISED ACCORDINGLY TO SUIT LENDING
PAYMENT CERTIFICATE
NUMBER

CERTIFIED AND FOUND


CORRECT PAYMENT
RECOMMENDED:

GODOFREDO C. DE VILLA
Chief, Construction Section

CHECKED AND RECOMMENDED

BENCIO A. AGUZAR
Officer-in-Charge
Office of the Asst. District Engineer
APPROVED FOR PAYMENT:

JULIANA D. VERGARA
Officer in Charge
Office of the District Engineer

Scheduled Physical Progress 99.40%


Actual Physical Progress 100.00%
(+) 0.60
Contract Expiry Date: 5-Jul-14
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas 1 District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Kumintang Ilaya, Batangas City

STATEMENT OF TIME ELAPSED AND WORK ACCOMPLISHED


As of July 04, 2014

PMS ID No. :
Project Name : 14DB006 - Construction & Rehabilitation of of MPB Structure
(Covered Court)
Brgy. Halang, Taal, Batangas
Contractor : LIBRIUS CONSTRUCTION & SUPPLY CORP.

Period Covered : April 07, 2014 - July 04, 2014

Original Contract Time : 90 Calendar Days

Date of Effectivity of Contract : April 07, 2014

Original Contract Amount : 4,704,200.60

Revised Contract Amount due to


Approved Change Order/Extra Work Order 4,704,200.60

Original Expiry Date : July 05, 2014

Approved Time Extension : 0 Calendar Days

Shutdown days due to Suspension of Work : 0 Calendar Days

Total Time ExtenSion : 0 Calendar Days

Total Calendar Days Elapsed to Date 90 Calendar Days

Contract Time (After Extension) : 90 Calendar Days

Revised Expiry Date due to


Suspension/Extension
Percentages of Time Elapsed : 98.89%

Schedule of Work Accomplished : 99.40%

Actual Work Accomplished : 100.00%

Slippage : 0.60%

Certified: Noted:

FRANCISCO M. LIMETA JR. JULIANA D. VERGARA


Project Engineer Officer-in-Charge
Office of the District Engineer
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

CONTRACTOR'S STATEMENT OF WORK ACCOMPLISHED

For the Period from April 07 to July 04, 2014

Project ID No.: 14DB006

Construction & Rehabilitation of of MPB Structure (Covered Court)

Brgy. Halang, Taal, Batangas

CONTRACTOR : LIBRIUS CONSTRUCTION & SUPPLY CORP.

TOTAL TOTAL TOTAL QTY.

ITEM NO. DESCRIPTION UNIT CONTRACT UNIT PRICE CONTRACT APPROVED IN TOTAL QTY

QTY (PHP) COST PREVIOUS BILLING THIS BILLING


801 Removal of Structures and Obstruction Cu.m. 51.44 226.00 11,625.44 - 51.44

802 Excavation Cu.m. 56.00 1,035.00 57,960.00 - 56.00

900 Reinforced Concrete Cu.m. 80.28 13,540.00 1,086,991.20 - 80.28

1014 Prepainted Metal Sheet Sq.m. 148.52 1,730.00 256,939.60 - 148.52

SPL-1 CHB Canal with Steel Grating Cover Sq.m. 90.72 3,118.50 282,910.32 - 90.72

SPL-2 Steel Works (Roof Framing) Sq.m. 735.00 1,565.00 1,150,275.00 - 735.00

SPL-3 Electrical Works L.S All 339,209.64 339,209.64 - All

SPL-4 Mobilization/Demobilization L.S All 30,000.00 30,000.00 - All

SPL-5 Construction Safety and Health Program L.S All 34,980.00 34,980.00 - All

SPL-6 Project Billboard ea 2.00 6,042.30 12,084.60 - 2.00

SPL-7 Main Scoreboard Set 1.00 120,093.60 120,093.60 - 1.00

SPL-8 Fiberglass Board with Flexible Ring Set 2.00 83,714.40 167,428.80 - 2.00

SPL-6 Plumbing Works l.s 1.00 86.00 86.00 - 1.00

TOTAL AMOUNT 3,550,584.20

5 of 202
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

CONTRACTOR'S STATEMENT OF WORK ACCOMPLISHED

For the Period from April 07 to July 04, 2014

Project ID No.: 14DB006

Construction & Rehabilitation of of MPB Structure (Covered Court)

Brgy. Halang, Taal, Batangas

CONTRACTOR : LIBRIUS CONSTRUCTION & SUPPLY CORP.

TOTAL TOTAL TOTAL QTY.

ITEM NO. DESCRIPTION UNIT CONTRACT UNIT PRICE CONTRACT APPROVED IN TOTAL QTY

QTY (PHP) COST PREVIOUS BILLING THIS BILLING


Say 4,704,200.60
WE HEREBY CERTIFY THAT THE STATEMENT OF WORK ACCOMPLISHED

Submitted: Checked: Verified & Found Correct: Recommending Approval:

FRANCISCO M. LIMETA JR. GODOFREDO C. DEVILLA BENCIO A. A


Project Engineer DPWH Project Engineer Chief, Construction Section Officer-in-C
Office of the Assistant

6 of 202
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NTRACTOR'S STATEMENT OF WORK ACCOMPLISHED

For the Period from April 07 to July 04, 2014

Project ID No.: 14DB006

ruction & Rehabilitation of of MPB Structure (Covered Court)

Brgy. Halang, Taal, Batangas

COST OF COST OF

TOTAL QTY BALANCE OF PREVIOUS THIS COST BALANCE OF

TO DATE QUANTITY BILLING BILLING TO DATE COST


51.44 - - 11,625.44 11,625.44 -
56.00 - - 57,960.00 57,960.00 -
80.28 - 1,086,991.20 1,086,991.20 -
148.52 - - 256,939.60 256,939.60 -
90.72 - - 282,910.32 282,910.32 -
735.00 - - 1,150,275.00 1,150,275.00 -
All - - 339,209.64 339,209.64 -
All - 30,000.00 30,000.00 -
All - - 34,980.00 34,980.00 -
2.00 - - 12,084.60 12,084.60 -
1.00 - - 120,093.60 120,093.60 -
2.00 - - 167,428.80 167,428.80 -
1.00 - 86.00 86.00 -

7 of 202
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NTRACTOR'S STATEMENT OF WORK ACCOMPLISHED

For the Period from April 07 to July 04, 2014

Project ID No.: 14DB006

ruction & Rehabilitation of of MPB Structure (Covered Court)

Brgy. Halang, Taal, Batangas

COST OF COST OF

TOTAL QTY BALANCE OF PREVIOUS THIS COST BALANCE OF

TO DATE QUANTITY BILLING BILLING TO DATE COST

- 3,550,584.20 3,550,584.20 -
Say 4,704,200.60 4,704,200.60
0.00% 100.00% 100.00% 0.00%
Recommending Approval: Approved:

BENCIO A. AGUZAR JULIANA D. VERGARA


Officer-in-Charge Officer-in-Charge
Office of the Assistant District Engineer Office of the District Engineer

8 of 202
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas 1st District Engineering Office
Batangas City

Name of Project: Construction & Rehabilitation of of MPB Structure (Covered Court)


Location: Brgy. Halang, Taal, Batangas
Contract ID: 14DB006
Contractor: LIBRIUS CONSTRUCTION & SUPPLY CORP.

ITEMIZED COST OF REVISION

VAR
ORIGINAL CONTRACT
Item
Description ADDITIVE (+) DEDUCTIVE
No.

Quantity Unit Unit Cost Amount Quantity Sum (P) Quantity

801 Removal of Structures and Obstruction 51.44 Cu.m. 226.00 11,625.44

802 Excavation 56.00 Cu.m. 1,035.00 57,960.00

900 Reinforced Concrete 80.28 Cu.m. 13,540.00 1,086,991.20

1014 Prepainted Metal Sheet 815.40 Sq.m. 1,730.00 1,410,642.00 (666.88)

SPL-1 CHB Canal with Steel Grating Cover 90.72 Sq.m. 3,118.50 282,910.32

SPL-2 Steel Works (Roof Framing) 735.00 Sq.m. 1,565.00 1,150,275.00

SPL-3 Electrical Works All L.S 339,209.64 339,209.64

SPL-4 Mobilization/Demobilization All L.S 30,000.00 30,000.00

SPL-5 Construction Safety and Health Program All L.S 34,980.00 34,980.00

SPL-6 Project Billboard 2.00 ea 6,042.30 12,084.60

SPL-7 Main Scoreboard 1.00 Set 120,093.60 120,093.60

SPL-8 Fiberglass Board with Flexible Ring 2.00 Set 83,714.40 167,428.80

SPL-6 Plumbing Works

9 of 202
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas 1st District Engineering Office
Batangas City

Name of Project: Construction & Rehabilitation of of MPB Structure (Covered Court)


Location: Brgy. Halang, Taal, Batangas
Contract ID: 14DB006
Contractor: LIBRIUS CONSTRUCTION & SUPPLY CORP.

ITEMIZED COST OF REVISION

VAR
ORIGINAL CONTRACT
Item
Description ADDITIVE (+) DEDUCTIVE
No.

Quantity Unit Unit Cost Amount Quantity Sum (P) Quantity

TOTAL AMOUNT 4,704,200.60 0.00

PREPARED BY: CHECKED BY:

FRANCISCO M. LIMETA JR. GODOFREDO C. DE VILA


Project Engineer Chief, Construction Section
Offic

10 of 202
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas 1st District Engineering Office
Batangas City

ITEMIZED COST OF REVISION

VARIATION ORDER NO.1 REVISED CONTRACT


DUE TO VARIATION NO. 1
DEDUCTIVE (-) EXTRA WORK ORDER

Sum (P) Quantity Unit Unit Cost Amount Quantity Unit Unit Cost Amount

51.44 Cu.m. 226.00 11,625.44

56.00 Cu.m. 1,035.00 57,960.00

80.28 Cu.m. 13,540.00 1,086,991.20

(1,153,702.40) 148.52 Sq.m. 1,730.00 256,939.60

90.72 Sq.m. 3,118.50 282,910.32

735.00 Sq.m. 1,565.00 1,150,275.00

All L.S 339,209.64 339,209.64

All L.S 30,000.00 30,000.00

All L.S 34,980.00 34,980.00

2.00 ea 6,042.30 12,084.60

1.00 Set 120,093.60 120,093.60

2.00 Set 83,714.40 167,428.80

1.00 l.s 86.00 86.00 1.00 l.s 86.00 86.00

11 of 202
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas 1st District Engineering Office
Batangas City

ITEMIZED COST OF REVISION

VARIATION ORDER NO.1 REVISED CONTRACT


DUE TO VARIATION NO. 1
DEDUCTIVE (-) EXTRA WORK ORDER

Sum (P) Quantity Unit Unit Cost Amount Quantity Unit Unit Cost Amount

(1,153,702.40) 86.00 3,550,584.20


Say 4,704,200.60
Original Contract Amount 4,704,200.60
Difference in cost (+) or (-) -

RECOMMENDING APPROVAL: APPROVED BY:

BENCIO A. AGUZAR JULIANA D. VERGARA


Officer-in-Charge Officer-in-Charge
Office of the Assistant District Engineer Office of the District Engineer

12 of 202
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BATANGAS 1ST DISTRICT ENGINEERING OFFICE
Batangas City

PROPOSED VARIATION ORDER NO. 1

Project/Location : Construction & Rehabilitation of of MPB Structure (Covered Court)


Brgy. Halang, Taal, Batangas
To : LIBRIUS CONSTRUCTION & SUPPLY CORP.
You are hereby directed to make herein described changes from the plans and specifications of the following described work not included in the plans and sp

DESCRIPTION OF WORK TO BE DONE : DECREASE IN QUANTITIES


1014 Prepainted Metal Sheet

NEW ITEM
SPL-6 Plumbing Works

REASONS FOR CHANGE : To suit the actual field condition

CHANGE REQUESTED BY : Project Engineer & Contractor

WORK TO BE PERFORMED AT : Approved Contract Unit Price

We the undersigned Contractors have given careful consideration to the change proposed and hereby agree, if this proposal Difference in Cost due to this Change :
is approved that we will provide all equipment, furnish all materials except as maybe otherwise be noted and perform all Net Cost of Previous Change :
services necessary for work above specified and will accept as full payment thereto the prices shown on the second page of Total Cost of Change :
the attached sheet. Original Contract Amount :
Estimated Revised Contract Amount :
Percentage Change in Original Contract Value (+) or (-)
Date: May 19, 2014
By reason this proposed change
Contractor: LIBRIUS CONSTRUCTION & SUPPLY CORP. of contract will be allowed. :
Original Contract Time :
By: JOSE ARISTEO M. LUANCING Approved Time Extension :
Authorized Managing Officer Total Extension of Time including thus C.O. :

PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL

FRANCISCO M. LIMETA JR. GODOFREDO C. DE VILLA BENCIO A. AGUZAR


Project Engineer Chief, Construction Section Officer-in-Charge
Office of the Assistant District Engineer
NOTE: This Variation Order is not effective until approved
of the Philippines PAGE 1 of
BLIC WORKS AND HIGHWAYS Project No.:
TRICT ENGINEERING OFFICE Province of: BATANGAS
atangas City

hanges from the plans and specifications of the following described work not included in the plans and specifications:

PhP -

PhP 4,704,200.60
PhP 4,704,200.60
+ 0.00%

0 CD
90 CD
0 CD
90 CD

APPROVAL:

JULIANA D. VERGARA
Officer-in-Charge
Office of the District Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas 1st District Engineering Office
Batangas City

Name of Project: Construction & Rehabilitation of of MPB Structure (Covered Court)


Location: Brgy. Halang, Taal, Batangas
Contract ID: 14DB006
Contractor: LIBRIUS CONSTRUCTION & SUPPLY CORP.

ITEMIZED COST OF REVISION

Item ORIGINAL CONTRACT


Description
No.
Quantity Unit Unit Cost Amount Quantity
801 Removal of Structures and Obstruction 4.00 Mos. 18,000.00 72,000.00 4.00
802 Excavation 4.00 Mos. 340.00 1,360.00 4.00
900 Reinforced Concrete 4.00 Mos. 49,800.00 199,200.00 4.00
1014 Prepainted Metal Sheet 4.00 Mos. 29,800.00 119,200.00 4.00
SPL-1 CHB Canal with Steel Grating Cover 3.00 Pcs. 4,990.00 14,970.00 3.00
SPL-2 Steel Works (Roof Framing) 4.00 Mos. 46,600.00 186,400.00 4.00
SPL-3 Electrical Works 1.00
SPL-4 Mobilization/Demobilization 505.00 Cu.m. 650.00 328,250.00 505.00
SPL-5 Construction Safety and Health Program 1,914.00 Cu.m. 140.00 267,960.00 0.00
SPL-6 Project Billboard 5,081.00 Sq.m. 15.00 76,215.00 0.00
SPL-7 Main Scoreboard 1,017.00 Cu.m. 1,000.00 1,017,000.00 0.00
SPL-8 Fiberglass Board with Flexible Ring 715.00 Cu.m. 1,200.00 858,000.00 0.00
PART E SURFACE COURSE
300 Crushed Aggregate Surface Course 79.00 Cu.m. 1,200.00 94,800.00 0.00
301(1) Bituminous Prime Coat (MC Cut- Asphalt) 6.23 m.t. 61,000.00 380,030.00 0.00
302(2) Bituminous Tack Coat (Emulsified Asphalt) 2.08 m.t. 83,785.09 174,272.99 0.00
310(a.3) Bituminous Concrete Surface Course (50mm thk.) 4,157.00 Sq.m. 903.00 3,753,771.00 0.00
310(b.3) Bituminous Concrete Surface Course (50mm thk.) 4,157.00 Sq.m. 903.00 3,753,771.00 0.00
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
404 Reinforcing Steel Bar, Grade 40 (Minor Structures) 3,975.00
405 Structural Concrete Class A (Minor Structures) 44.00

17 of 202
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas 1st District Engineering Office
Batangas City

Name of Project: Construction & Rehabilitation of of MPB Structure (Covered Court)


Location: Brgy. Halang, Taal, Batangas
Contract ID: 14DB006
Contractor: LIBRIUS CONSTRUCTION & SUPPLY CORP.

ITEMIZED COST OF REVISION

Item ORIGINAL CONTRACT


Description
No.
Quantity Unit Unit Cost Amount Quantity
502(2) Inlet with Bar Grate (includes curb and gutter reinforcement) 58.00 Ea. 400.00 23,200.00 50.00
502(3) Concrete Cover 58.00 Ea. 2,200.00 127,600.00 50.00
506 Stone Masonry 189.00 Cu.m. 3,800.00 718,200.00 460.00
SPL-5 CHB Covered Line Canal 580.00 l.m. 8,000.00 4,640,000.00 517.20
PART H MISCELLANEOUS STRUCTURES
600 (3) Concrete Curb and Gutter, Type A (Cast in Place) 580.00 l.m. 1,000.00 580,000.00 567.20
600 (3)a Metal Guardrails (Metal Beam) 177.00 l.m. 3,000.00 531,000.00 287.30
603 (3)b Metal Beam End Piece 10.00 Ea. 1,500.00 15,000.00 6.00
612 (1) Reflectorized Thermoplastic Pavement Markings (White) 174.00 Sq.m. 800.00 139,200.00 175.02
612 (2) Reflectorized Thermoplastic Pavement Markings (Yellow) 174.00 Sq.m. 900.00 156,600.00 175.02

TOTAL AMOUNT 18,227,999.99

Original Contract Amount


Difference in cost (+) or (-)

PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL:

FRANCISCO M. LIMETA JR. GODOFREDO C. DE VILA BENCIO A. AGUZAR


PROJECT ENGINEER Chief, Construction Section Officer-in-Charge
Office of the Assistant District Engineer
18 of 202
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas 1st District Engineering Office
Batangas City

ITEMIZED COST OF REVISION

REVISED CONTRACT
DUE TO VARIATION NO. 1

Unit Unit Cost Amount


Mos. 18,000.00 72,000.00
Mos. 340.00 1,360.00
Mos. 49,800.00 199,200.00
Mos. 29,800.00 119,200.00
Pcs. 4,990.00 14,970.00
Mos. 46,600.00 186,400.00
ea 16,883.85 16,883.85
Cu.m. 650.00 328,250.00
Cu.m. 140.00 0.00
Sq.m. 15.00 0.00
Cu.m. 1,000.00 0.00
Cu.m. 1,200.00 0.00

Cu.m. 1,200.00 0.00


m.t. 61,000.00 0.00
m.t. 83,785.09 0.00
Sq.m. 903.00 0.00
Sq.m. 903.00 0.00

kg. 69.94 278,011.50


cu.m. 7,391.92 325,244.48

19 of 202
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas 1st District Engineering Office
Batangas City

ITEMIZED COST OF REVISION

REVISED CONTRACT
DUE TO VARIATION NO. 1

Unit Unit Cost Amount


Ea. 400.00 20,000.00
Ea. 2,200.00 110,000.00
Cu.m. 3,800.00 1,748,000.00
l.m. 8,000.00 4,137,600.00

l.m. 1,000.00 567,200.00


l.m. 3,000.00 861,900.00
Ea. 1,500.00 9,000.00
Sq.m. 800.00 140,016.00
Sq.m. 900.00 157,518.00

9,292,753.83

Original Contract Amount 18,227,999.99


Difference in cost (+) or (-) (8,935,246.16)

APPROVED BY:

JULIANA D. VERGARA
Officer-in-Charge
Office of the District Engineer
20 of 202
Construction of Multi-Purpose Building Structure,
Barangay Poblacion 9, Balayan, Batangas 1st LD

Back-up Computation

A.1.1 Temporary Facilities 3.00 mo.

A.1.2 Progress Photographs 3.00 ea.

SPL-1 Project Billboard 2.00 ea.

SPL-2 Construction Safety and Health Program 3.00 mos.

SPL-3 Mobilization/Demobilization 3.00 mos.

802 EXCAVATION 48.735 CU.M.


FOOTING
LENGTH= 1.50 WIDTH= 1.50 DEPTH= 1.95 NO.= 10.00 VOLUME= 43.875

TIE BEAM
LENGTH= 54.00 WIDTH= 0.20 DEPTH= 0.45 NO.= 1.00 VOLUME= 4.86
48.735

804(a) Backfilling of Excavated Materials 18.15 CU.M.


FOOTING
A= 1.50 m N= 10 units
B= 1.10 m
H= 1.10 m
VOLUME= 1.82 cu.m.
VOL. T= 18.15 cu.m.
Construction of Multi-Purpose Building Structure,
Barangay Poblacion 9, Balayan, Batangas 1st LD

Back-up Computation

SPL-4 Removal of Existing Concrete Pavement 20.7 cu.m.


Pavement
LENGTH= 1.50 WIDTH= 1.50 DEPTH= 0.20 NO.= 10.00 VOLUME= 4.5
LENGTH= 54.00 WIDTH= 1.50 DEPTH= 0.20 NO.= 1.00 VOLUME= 16.2
20.7

SPL-5 Gravel Bedding 5.84 CU.M.


FOOTING
LENGTH= 1.50 WIDTH= 1.50 DEPTH= 0.10 NO.= 10.00 VOLUME= 2.25

TIE BEAM
LENGTH= 54.00 WIDTH= 1.50 DEPTH= 0.10 NO.= 1.00 VOLUME= 8.1
5.84
Construction of Multi-Purpose Building Structure,
Barangay Poblacion 9, Balayan, Batangas 1st LD

Back-up Computation

900 Reinforced Concrete 28.10 CU.M.


FOOTING
LENGTH= 1.50 WIDTH= 1.50 DEPTH= 0.35 NO.= 10.00 VOLUME= 7.88

COLUMN
LENGTH= 0.40 WIDTH= 0.40 HEIGHT= 7.10 NO.= 10.00 VOLUME= 11.360

TIE BEAM
LENGTH= 78.20 WIDTH= 0.20 DEPTH= 0.35 NO.= 1.00 VOLUME= 5.474

FLOORING
LENGTH= 1.50 WIDTH= 1.50 DEPTH= 0.10 NO.= 10.00 VOLUME= 2.25
LENGTH= 54.00 WIDTH= 0.20 DEPTH= 0.10 NO.= 1.00 VOLUME= 1.08
28.039
say 28.10

SPL-6 Steel Works 439.20 sq.m.


L= 24.4
W= 9
N= 2
Area= 439.2 sq.m.

1014 PREPAINTED METAL SHEET 468.48 SQ.M.


ROOFING (CURVE) WIDTH 18.4
Construction of Multi-Purpose Building Structure,
Barangay Poblacion 9, Balayan, Batangas 1st LD

Back-up Computation
LENGTH 24.4
AREA 448.96
448.96 sq.m.
Pre-painted Gutter WIDTH 0.4
LENGTH 24.4
AREA 19.52

Prepared by: Checked by:

AURORA M. LUMPAS ALEJANDRO G. ILUSTRE JR.


Contractor's Project Engineer DPWH Project Engineer
Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas

Quantity Take-Off

A.1.1 Temporary Facilities

A.1.2 Progress Photographs

SPL-1 Project Billboard

SPL-2 Construction Safety and Health Program

SPL-3 Mobilization/Demobilization

802 EXCAVATION
FOOTING
LENGTH= 1.50 WIDTH= 1.50 DEPTH= 1.95 NO.= 12.00 VOLUME=

TIE BEAM
LENGTH= 33.50 WIDTH= 0.20 DEPTH= 0.45 NO.= 2.00 VOLUME=

804(a) Backfilling of Excavated Materials


FOOTING
A= 1.50 m N= 12 units
B= 1.10 m
H= 1.10 m
VOLUME= 1.82 cu.m.
VOL. T= 21.78 cu.m.

104 Embankment (from borrow)


Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas

Quantity Take-Off

L= 15.00 m N= 1.25 cu.m.


W= 27.50 m
H= 2.24 m
VOLUME= 462.00 cu.m.
VOL. T= 577.50 cu.m.
Common Barrow 577.50

SPL-6 Masonry Works

Along Grid Line ( B - 1 to 3 )


ITEM LENGTH (m) HEIGHT (m) NO. QTY. UNIT
#5 CHB Catch Basin = 5.10 2.04 5.00 51.99 sq.m.

#5CHB 652.00 pcs


cement 53.00 bags
sand 4.39 cu.m.
10mmØ vertical bar 69.00 kgs
10mmØ horizontal bar 69.00 kgs
tie wire 2.76 kgs

Along Grid Line ( A - B )


ITEM LENGTH (m) HEIGHT (m) NO. QTY. UNIT
#5 CHB Fence = 15.00 2.64 2.00 39.59 sq.m.

#5CHB= 497.00 pcs


cement= 41.00 bags
sand= 3.34 cu.m.
10mmØ vertical bar= 52.00 kgs
Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas

Quantity Take-Off
10mmØ horizontal bar= 53.00 kgs
tie wire= 2.10 kgs

Wall Footing of Fence


ITEM LENGTH (m) WIDTH (m) THK. NO. QTY. UNIT
wall footing of Fence 0.6 15 0.2 2.00 3.60 cu.m.

Cement= 35.00 bags


Sand = 1.80 cu.m.
Gravel= 3.60 cu.m.
10mm bars= 15 m
9.71 kgs
tie wire= 0.19 kgs

Column for Fence


ITEM LENGTH (m) WIDTH (m) THK. NO. QTY. UNIT
Column for Fence 6.238 0.2 0.15 2.00 0.37 cu.m.

Cement= 4.00 bags


Sand = 0.19 cu.m.
Gravel= 0.37 cu.m.

Reinforcing steel bars for column

10mm bars for column of fence 49.904 m


32.31 kgs
stirrups 44.8 m
29.01 kgs
tie wire 1.23 kgs
Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas

Quantity Take-Off

SPL-4 Gravel Bedding


FOOTING
LENGTH= 1.50 WIDTH= 1.50 DEPTH= 0.10 NO.= 12.00 VOLUME=

TIE BEAM
LENGTH= 67.00 WIDTH= 0.40 DEPTH= 0.10 NO.= 1.00 VOLUME=

900 Reinforced Concrete


FOOTING
LENGTH= 1.50 WIDTH= 1.50 DEPTH= 0.35 NO.= 12.00 VOLUME=

COLUMN
LENGTH= 0.40 WIDTH= 0.40 HEIGHT= 7.10 NO.= 4.00 VOLUME=

COLUMN
LENGTH= 0.40 WIDTH= 0.40 HEIGHT= 9.04 NO.= 4.00 VOLUME=

COLUMN
LENGTH= 0.40 WIDTH= 0.40 HEIGHT= 5.12 NO.= 2.00 VOLUME=

COLUMN
LENGTH= 0.40 WIDTH= 0.40 HEIGHT= 2.88 NO.= 2.00 VOLUME=
Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas

Quantity Take-Off

TIE BEAM
LENGTH= 80.20 WIDTH= 0.20 DEPTH= 0.35 NO.= 1.00 VOLUME=

STIFFENER BEAM
LENGTH= 5.10 WIDTH= 0.15 DEPTH= 0.20 NO.= 5.00 VOLUME=

say
Portland Cement 303 bags
Sand 15 cu.m.
Gravel 29 cu.m.
6mm thk. X 4' x8' Ord. Plywood 40 pcs.
Coco Lumber Assrtd. 1834 bdft.
Assrtd. CWNail 15 kgs

REINFORCING STEEL BARS


Column Footing 1.5m x 1.5m x 0.35
Main Bars 16 mm Ǿ bars dia.
N= 216 108 1.95 20
# bars available in 1 full length 3 210.6 16
No. of Pcs. 72 38.290909 12
681.84 kgs. 10

Tie Beams
Main Bars 16 mm Ǿ bars 12 mm Ǿ bars
along: A&B 1&6 1&6 dia.
N= 10 24 24 20
Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas

Quantity Take-Off
20 40 24 16
No. of Pcs. 60 127.92 12
696.12 kgs. 10

Stirrups 10 mm Ǿ bars stiffener


N= 490 165
90 pcs. 22
414.40 kgs.

Column
Main Bars 20 mm Ǿ bars dia.
N= 707.2 20
1,744.43 kgs. 16
12
Stirrups 10 mm Ǿ bars 10
N= 436
80 pcs.
296.00 kgs.

Summary
20 mm Ǿ bars 1,744.43 kgs.
16 mm Ǿ bars 1,377.96 kgs.
10 mm Ǿ bars 710.40 kgs.
Total Weight 3,832.79 kgs.
G.I Tie wire #16 77.00 kgs.
Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas

Quantity Take-Off

SPL-5 Steel Works 241.20 sq.m.


20mm Base Plate 100.61 kgs.
10mm thk. Steel Plate 28.26 kgs.
20mm dia. X 350mm long Anchor bolts 48 pcs.
12mm dia. Sag Rod with bolts, nuts and washers 27 pcs.
2"x 6"x 1.5mm C-Purlns (roof and fascia board) 41 pcs.
6mm gusset plate 114 kgs.
16mm dia. Round bar (Cross bracing 7.5m length) 142.44 kgs.
Standard turn buckle 24 pcs.
For Truss-1 2"Ǿ G.I. Pipe, schedule 40 1 bay only 1425 / pc
Top Chord Bottom Chord Side
L= 18 17 3.324
N= 2 2 2
Lt= 36 34 6.648
Total Length= 76.648 m
say 77 m
Web Members 1"Ǿ G.I. Pipe, schedule 40 610 / pc
Vertical Diagonal 1 Horizontal
L= 19 29 2
N= 2 2 2
Lt= 38 58 4
Total Length= 100 m

For side struts 2"Ǿ G.I. Pipe, schedule 40 h= 0.6 along 1 & 6
Top & Bottom along A & B w= 5.1 4.2
L= 11.4 6
N= 6 25.2
Lt= 68.4
Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas

Quantity Take-Off
Total Length= 69 m

Web Members 1"Ǿ G.I. Pipe, schedule 40 610 / pc


along A & B Vertical Diagonal
L= 7 8 4.5 5.12
N= 6 6 1.2 1.3
Lt= 42 48 5.7 6.42
Total Length= 90 m

For center struts 2"Ǿ G.I. Pipe, schedule 40 h= 0.4


Top & Bottom w= 5.5
L= 11.8
N= 2
Lt= 24
Total Length= 24 m

Web Members 1"Ǿ G.I. Pipe, schedule 40 610 / pc


Vertical Diagonal
L= 0.4 0.7
N= 44 44
Lt= 17.6 30.8
Total Length= 49 m

Summary
2"Ǿ G.I. Pipe, schedule 40 170.0 29 pcs.
1"Ǿ G.I. Pipe, schedule 40 239.0 40 pcs.
Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas

Quantity Take-Off

1014 PREPAINTED METAL SHEET


ROOFING (CURVE) WIDTH 18
LENGTH 7.9
AREA 142.20
142.20 sq.m.
Pre-painted Gutter WIDTH 0.4
LENGTH 7.9
AREA 6.32

8 pcs
National High School, Balaytigue, Nasugbu, Batangas

antity Take-Off

3.00 mo.

2.00 mos

2.00 ea.

3.00 mos.

3.00 mos.

58.68 CU.M.

52.65

6.03
58.68

21.78 CU.M.

577.50 CU.M.
National High School, Balaytigue, Nasugbu, Batangas

antity Take-Off

91.58 SQ.M
National High School, Balaytigue, Nasugbu, Batangas

antity Take-Off

5.38 CU.M.

2.7

2.68
5.38

28.80 CU.M.

9.45

4.544

5.785

1.637

0.920
National High School, Balaytigue, Nasugbu, Batangas

antity Take-Off

5.614

0.765

28.715
28.80

weight (kg)
14.80
9.47
5.33
3.70

weight (kg)
14.80
National High School, Balaytigue, Nasugbu, Batangas

antity Take-Off
9.47
5.33
3.70

weight (kg)
14.80
9.47
5.33
3.70

157.2
25.152

140
National High School, Balaytigue, Nasugbu, Batangas

antity Take-Off
30

steel clamp 0.36


C-purlins 35
fascia 6
41

trusses/gusset p 186

strut 48

along 1 & 6
12.6
4.2
National High School, Balaytigue, Nasugbu, Batangas

antity Take-Off

148.52 SQ.M.

3.7017142857

2.4390243902
Construction of Day Care Center Brgy. Bolbok, Tuy, B
Bolbok, Tuy, Batangas
QUANTITY TAKE-OFF

A.1.1 Temporary Facilities

A.1.2 Progress Photographs

SPL-1 Project Billboard

SPL-2 Construction Safety & Health Program

SPL-3 Mobilization/Demobilization

SPL-4 Gravel Bedding

Item Length (m) Width (m) Thickness (m) No. of Footing


Column Footing 1.2 1.2 0.1 9
Footing(Retaining Wall) 10 1.8 0.1 3

Item Length (m) Width (m) Thickness (m) No. of Span


Wall Footing (Gridline 1&3) 7 0.4 0.1 2
Wall Footing (Gridline A&C) 6.5 0.4 0.1 2
Septic tank (Footing) 1.5 0.4 0.1 3
Septic tank 1.5 3 0.1 1
Flooring 7 6.5 0.1 1
Flooring 5.95 1.5 0.1 1
Flooring(out1) 10 1.8 0.1 1
Flooring(out2) 10 1 0.1 2
Wall Footing (Internal) 7.45 0.4 0.1 1

SPL-5 Masonry Works w/ Plastering

Total Area less


Item Width (m) Height (m) area of doors Unit
and windows

CHB #5 (Front) Ground 7 3.9 21.9 sq.m


CHB #5 (Right) Ground 6.5 3.9 23.67 sq.m
CHB #5 (Left) Ground 6.5 3.9 18.63 sq.m
CHB #5 (Rear)Ground 7 3.9 24.9 sq.m
Total Area less
Item Length (m) Width (m) area of doors Unit
and windows

CHB #4 (Ground) 15.2 3.9 56.76 sq.m

Total Area less


Item Width (m) Length (m) area of doors Unit
and windows

CHB #5 (2nd Level) 27 4.05 99.75 sq.m

Total Area less


Item Length (m) Width (m) area of doors Unit
and windows

CHB #4 (2nd Level) 2.7 7.55 19.125 sq.m

Item Length (m) Width (m) Total Area Unit


CHB #5 (Septic Tank) 1.8 10.5 14.5125 sq.m
CHB #4 (Perimeter Wall) 2.075 30 57.8625 sq.m

Item Length (m) Width (m) Total Area Unit


CHB #4 (cath basin) 0.5 0.5 4 sq.m

Item Total Area Unit cement=


Plastering 682.22 sq.m sand=

#5 CHB= 2,943.00 pcs #4 CHB=


cement= 208.00 bags cement=
sand= 17.16 cu.m. sand=
10mmØ vertical bar= 671.00 kgs 10mmØ vertical bar=
10mmØ horizontal bar= 671.00 kgs 10mmØ horizontal bar=
tie wire= 27.00 kgs tie wire=

Materials Quantity Unit


#5 CHB 2943.00 pcs
#4 CHB 1759.00 pcs
cement 517.00 bags
sand 46.45 cu.m.
10mmØ vertical bar 1070.00 kgs
10mmØ horizontal bar 1070.00 kgs
tie wire 43.00 kgs
SPL-6 Plumbing Works

ITEM QTY
Water Closet Inc. Fittings and Acc. (Round) American Std. or Equivalent 3
Lavatory Inc. Fittings and Acc. American Std. or Equivalent 3
PPR 25mm 8
PPR 32mm 8
PPR REDUCER 25x32mm 8
Check Valve 1
Gate Valve 1
Water Meter 1
PPR Elbow 25mm 5
PPR Tee 25mm 8
PPR Coupling 25mm 8
Faucet 3
Solvent 10
PVC P-Trap 100mmØ 2
PVC P-Trap 50mmØ 3
PVC Pipe 150mmØ 6
PVC Pipe 100mmØ 18
PVC Pipe 50mmØ 10
PVC 45deg. Single Branch, Wye 100mm x 50mm 6
PVC Clean-out w/ plug & sealing ring 100mm 2
PVC Elbow 90 deg 100mm 5
PVC Elbow 90 deg 50mm 8
PVC Coupling 100mm 6
Floor Drain 3

SPL-7 Ceiling

Ceiling Area 93.6 sq.m.


Ceiling Joist 502.91 bd.ft.
Ceiling Board 33.00 pcs
Finishing Nail Assorted 11.00 kgs

403 Steel Works

Base Plate
Item Length (m) Width (m) Thickness (m) No. of Plate
0.35 0.2 0.012 9
16mm x 0.3m Anchor Bolts

Total No. of
Item No. of Bolts No. of Column Unit
Bolts
4 9 36 pcs

12mm x 0.15m Anchor Bolts

Total No. of
Item No. of Bolts No. of Column Unit
Bolts
2 9 18 pcs

Truss (Main Members)


Unit Weight
Item Length (m) Weight No. of Truss
(kg/m)
65mm x 65mm x 6mm Angel 35.366 5.91 209.01306 3
Bar

Truss (Web Members)


Unit Weight
Item Length (m) Weight No. of Truss
(kg/m)
50mm x 50mm x 5mm Angel 33.234 3.77 125.29218 3
Bar

Angle Bar Cleats


Unit Weight
Item Length (m) Weight No. of Truss
(kg/m)
75mm x 75mm x 6mm Angel 2.34 6.87 16.0758 3
Bar Cleats

Gusset Plate
Unit Weight
Item Length (m) Width (m) No. of Plate
(kg/sq.m)
6mm thk. Gusset Plate 0.1 0.15 47.1 17

Sagrod
Unit Weight
Item Length (m) Total Weight Unit
(kg/m)
12mm dia. Sagrod w/ nuts & 54 5.33 287.82 kgs.
washers

Stainless Steel Handrails


Item qty Unit
38mm Stainless pipe for ramp 20 pcs
and stairs and walkway
Summary Materials Quantity Unit
Base Plate 59.4216 kgs

16mm x 0.3m Anchor Bolts 36.00 pcs

65mm x 65mm x 6mm Angel 627.04 kgs


Bar

50mm x 50mm x 5mm Angel 375.88 kgs


Bar

6mm thk. Gusset Plate 36.03 kgs


150x65x20x2mmmm C-purlins 603.648 kgs
(roof & fasia)
12mm dia. sagrod w/ nuts & 287.82 kgs
washer

75mm x 75mm x 6mm Angel 48.2274 kgs.


Bar Cleats

38mm Stainless pipe for ramp 20.00 pcs


and stairs and walkway
Welding Rod 23.00 kgs
12mm x 0.15m Anchor Bolts 18.00 pcs

802 Excavation

Item Length (m) Width (m) Depth (m) No. of Footing

Column Footing 1.200 1.200 1.550 9.000


Lot area 10.000 10.000 1.875 1.000

Item Length (m) Width (m) Depth (m) No. of Span

Footing(Retaining wall) 10.000 1.800 2.175 3.000


Wall Footing 38.450 0.400 0.750 1.000
Septic Vault 1.500 3.000 1.800 1.000
Septic Vault (Footing) 1.500 0.400 0.200 3.000

804(a) Backfilling of Excavated Materials


Total Volume of Total Volume Total Volume
Item Of Concrete Unit
Excavation of Backfill
(below NGL)

1 2 (1-2)
Excavated Materials 336.933 218.696 118.237 cu.m

900 Reinforced Concrete

Concrete

Item Length (m) Width (m) Depth (m) No. of Septic


Septic Tank 3 1.8 0.1 1
Septic Tank(Footing) 1.5 0.4 0.2 3
Septic Tank(Cover) 3 1.8 0.1 1

Item Length (m) Width (m) Depth (m) No. of Footing


Column Footing 1.2 1.2 0.25 9
Footing (Retaining Wall) 10 1.8 0.45 3

Item Length (m) Width (m) Depth (m) No. of Span


Wall Footing (Gridline 1&3) 7 0.4 0.2 2
Wall Footing (Gridline A&C) 6.5 0.4 0.2 2
Wall Footing (Internal) 7.45 0.4 0.2 1
Stairs 0.3 1 0.175 17
Landing 1 1 0.175 1

Item Length (m) Width (m) Depth (m) No. of Column


Column 0.2 0.35 8.95 9
Retaining Wall 10 0.45 4.05 3

Item Length (m) Width (m) Thickness (m) Total Volume


Flooring(out1) 10 1.8 0.1 1.8
Flooring (out2) 10 1 0.1 2
Flooring 7 6.5 0.1 4.55
Flooring (out3) 5.95 1.5 0.1 0.8925

Item Length (m) Width (m) Thickness (m) Total Volume


Floor Beam 1 3.4 0.35 0.25 0.8925
Floor Beam 2 3.8 0.35 0.25 1.6625
Floor Beam 3 2.95 0.35 0.25 0.774375
Floor Beam 4 3.55 0.35 0.25 0.931875
Floor Beam 5 2.25 0.35 0.25 0.196875

Item Length (m) Width (m) Thickness (m) Total Volume


Roof Beam 1 7 0.35 0.2 1.47
Roof Beam 2 6.5 0.35 0.2 1.365

Item Length (m) Width (m) Thickness (m) Total Volume


2nd Floor Slab 7 7.5 0.1 5.25

Item Length (m) Width (m) Thickness (m) Total Volume


Sun Breaker 19.1 0.6 0.125 1.4325

Item Length (m) Width (m) Thickness (m) Total Volume


Ramp 3.8 1 0.1 0.5245

Item Length (m) Width (m) Thickness (m) Total Volume


Lintel Beam 19.1 0.25 0.12 0.7175
Lavatory 1.95 0.5 0.15 0.29075

Materials Quantity Unit


Portland Cement 1239.00 bags
Sand 59.00 cu.m
Gravel 118.00 cu.m
12mm thk. X 4' x8' Marine Plywood 70.00 pcs
Coco Lumber Assrtd. 2077.00 bd.ft
Assrtd. CWNail 21.00 kgs

Reinforcing Steel Bars

Main Bars

Item Length No. of bars No. of Footing Weight

Footing 1.2 7 9 238.6440


Footing(Retaining Wall) 10 11 3 520.8500
Footing(Retaining Wall) 1.8 20 3 170.4600

Item Length No. of bars No. of Column Weight

Column 8.95 6 9 762.8085


Retaining Wall 4.05 66 3 712.3545

Item Length No. of bars No. of Gridline Weight

Wall Footing (Gridline 1&3) 7 3 2 37.3100

Item Length No. of bars No. of Gridline Weight

Wall Footing (Gridline A&C) 6.5 3 2 34.6450


Lavatory 1.95 6 1 7.2150

Item Length No. of bars No. of Gridline Weight


Wall Footing (Internal) 10.1 3 1 26.9165

Item Length No. of bars No. of Gridline Weight

Floor Beam 1 3.4 6 3 96.5940

Item Length No. of bars No. of Gridline Weight


Floor Beam 2 3.8 6 5 179.9300

Item Length No. of bars No. of Gridline Weight


Floor Beam 3 2.95 6 3 83.8095

Item Length No. of bars No. of Gridline Weight

Floor Beam 4 3.55 6 3 100.8555

Item Length No. of bars No. of Gridline Weight

Floor Beam 5 2.25 6 1 21.3075

Item Length No. of bars No. of Gridline Weight

Roof Beams 1 7 6 3 198.8700

Item Length No. of bars No. of Gridline Weight

Roof Beams 2 6.5 6 3 184.6650


Item Length No. of bars All Canopy Weight
Sun Breaker 19.1 8 1 94.227
Lintel Beam 19.1 4 1 47.113

Item Length No. of bars All Canopy Weight


Stairs 1 1 17 10.483
Stairs 1 3 1 2.665
Stairs 0.8 3 17 25.160

Along Gridline
Item Length No. of bars Weight
1,2 & 3

Flooring 7 1 17 76.5739

Along Gridline
Item Length No. of bars Weight
A,B & C

Flooring 6.5 1 18 72.1500

Along Gridline
Item Length No. of bars Weight
1,2 & 3

2nd Floor Slab 7 1 38 164.0333

Along Gridline
Item Length No. of bars Weight
A,B & C

2nd Floor Slab 7.5 1 35 161.875

Item Length No. of bars Septic Weight


Septic Tank 2 7 28 241.7333
Septic Tank (Cover) 3 10 60 1110.0000

TIES

Item Length No. of bars No. of Column Weight

Column Ties 1.5 47 9 391.2750


Retaining Wall 30 21 3 1165.5000
Wall Footing1 1.2 36 2 53.2800
Wall Footing2 1.2 33 2 48.8400
Wall Footing3 1.2 38 1 28.1200

Item Length No. of bars No. of Beam Weight


Floor Beam 1 1.5 19 3 52.7250

Item Length No. of bars No. of Beam Weight


Floor Beam 2 1.5 22 5 101.7500

Item Length No. of bars No. of Beam Weight


Floor Beam 3 1.5 16 3 44.400

Item Length No. of bars No. of Beam Weight


Floor Beam 4 1.5 20 3 55.500

Item Length No. of bars No. of Beam Weight


Floor Beam 5 1.5 11 1 10.175

Item Length No. of bars No. of Beam Weight


Roof Beam 1 1.5 43 3 119.3250

Item Length No. of bars No. of Beam Weight


Roof Beam 2 1.5 40 3 111.0000

Item Length No. of bars No. of Beam Weight


Sun Breaker 1.2 64 1 47.3600
Lintel Beam 0.75 64 1 29.6000
Lavatory 1 22 2 27.1333

Materials Quantity Unit


16mm dia. Def. Bars 2558.7940 kgs
12mm dia. Def. Bars 813.8910 kgs
10mm dia. Def. Bars 4289.3322 kgs
tie wire 154.0000 kgs

1005 Windows

DESCRIPTION A (m.)

a. Aluminum Frame Sliding window 1.4


b. Fixed Glass window on aluminum frame 0.5
c. Awning Type window 0.6

1010 Doors

DESCRIPTION A (m.)
a.Solid Panel Board 1.6
b. Hollow Core Flush Door 0.8
c. PVC Door w/ Complete Accessories 0.6
d. Hinge (50mm x 101mm)
e. Door Locks (Schlage or equivalent)

L
f. 2" x 5" Door Jamb 2.1
g. 2" x 5" Door Jamb 2.1

1018 Tile Works

Description Length Width/ Height Area unit


Floor Tiles 3.20 6.50 20.80 sq.m
1.50 3.80 5.70 sq.m
2.80 3.80 10.64 sq.m
3.40 6.50 22.10 sq.m
3.80 1.30 4.94 sq.m
2.30 3.55 8.17 sq.m
2.80 1.95 5.46 sq.m
Stairs ( Unglazed Tiles) 8.08 1.00 8.08 sq.m
Landing ( Unglazed Tiles) 1.18 1.00 1.18 sq.m
87.06
Tile Grout 8.71
say 9.00 packs

cement= area x (0.082 + 0.025)= 9.314885 say


sand= 0.025 x area x 0.5= 1.09 say

Description Length Width/ Height Area unit


CR Floor Tiles 1.75 2.20 3.85 sq.m
CR Floor Tiles 2.05 2.20 4.51 sq.m
CR Floor Tiles 1.50 2.20 3.30 sq.m
CR Wall Tiles 3.50 0.70 2.45 sq.m
8.80 0.70 6.16 sq.m
4.10 0.70 2.87 sq.m
3.00 0.70 2.10 sq.m
4.50 0.70 3.15 sq.m
28.39
Tile Grout 2.84
say 3.00 packs

cement= area x (0.082 + 0.025)= 3.03773 say


sand= 0.025 x area x 0.5= 0.35 say

Materials QTY unit


Tile Grout 12.00 packs
Cement 14.00 bags
Sand 3.00 cu.m
Glazed Tiles 103.79 sq.m
Unglazed Tiles 11.66 sq.m

1032 Painting Works

Total Area = 529.47

Materials AREA no. unit


Paint Latex Gloss 529.47 18.00 gal.
Paint Latex Semi-Gloss 529.47 36.00 gal.
Paint Metal Epoxy 5.00 gal.
Lacquer Thinner 3.00 gal.
Masonry Putty 529.47 18.00 gal.
Concrete Neutralizer 5.00 gal.
Paint Brush 6.00 pcs.
Roller Brush 6.00 pcs.

1014 Pre-Painted Metal Sheets

Roofing
Item Length (m) Width (m) Area Unit
Long Span Rib Type GA 26 7.2 7.2 51.84 sq.m

No. of
Item Length (m) Unit
Flashing
Pre-Painted Gutter GA 24 8 4 l.m

No. of
Item Length (m) Unit
Flashing
Flashing GA 24 9.25 4 l.m Pre-Painted Gutter GA 24

Materials Quantity Unit


Long Span Rib Type GA 26 51.84 sq.m
Pre-Painted Gutter GA 24 4.00 pcs
Flashing GA 24 4.00 pcs
Tex Screw 480.00 pcs
Blind Rivets 120.00 pcs
Roofing Sealant 3.00 pcs

1100 Electrical Works

Materials
1 RSC 25.4mm dia. 2 pc
2 Service Entrance Cap 1 pc
3 Junction Box, 4"x4" G.I. 20 pcs
4 Utility Box, 2"x4" G.I. 20 pcs
5 16mmØ x 2.40m Grounding Rod Copperweld w/ Heavy Duty Cla 2 pcs
6 2.0mm2 THHN Wire, Stranded 400 m
7 3.5mm2 THW Wire, Stranded 250 m
8 5.5mm2 THW Wire, Stranded 20 m
9 8.0mm2 THW Wire, Stranded 40 m
10 Two Gang Universal/Ground Convenience Outlet 8 sets
11 Single Gang Switch 6 sets
12 Two Gang Switch 1 sets
13 Three Gang Switch 1 sets
1 x 40 Flourescent Fixture with Aluminum Reflector and 4 sets
14 accessories (Lamps, Ballast, Starter)
15 18 watts ESL Cool Daylight 7 pcs
16 Ceiling Receptacle, 3 1/2" dia. 7 pcs
17 Panel Box, Flush Type, 4 Branches (MDP) 1 pc
18 Circuit Breaker, 30A, 2P, Bolt Type 1 pcs
19 Circuit Breaker, 20A, 2P, Bolt Type 1 pcs
20 Circuit Breaker, 40A, 2P, Bolt Type 1 pc
21 uPVC Pipe, 12.7mm dia. 45 pcs
22 uPvc Pipe, 19mm dia. 50 pcs
23 uPvc Pipe, 25.4mm dia. 4 pcs
24 uPVC Elbow Short Radius, 12.7mm dia. 8 pcs
25 uPVC Elbow Long Radius, 12.7mm dia. 10 pcs
26 uPVC Elbow Long Radius, 19mm dia. 15 pcs
27 uPVC Elbow Long Radius, 25.4mm dia. 2 pcs
28 RSC Elbow, 25.4mm dia. 2 pcs
29 uPVC Coupling, 12.7mm dia. 20 pcs
30 uPVC Coupling, 19mm dia. 25 pcs
31 uPVC Coupling, 25.4mm dia. 2 pcs
32 RSC Coupling, 25.4mm dia. 2 pcs
33 #8 masonry drill bit 1 pc
34 #8 tox and screw 40 sets
35 1" U-Metal Clamp 20 pcs
36 Electrical Tape 14 rolls
37 Rubber Tape 2 rolls
38 1/2" Mica Tube 10 m
39 #16 Tie Wire 6 kg
40 #8 Nylon Cable Ties, White 6 packs
er Brgy. Bolbok, Tuy, Batangas 1st LD
Tuy, Batangas
TITY TAKE-OFF

3.00 mos.

3.00 mos.

2.00 ea.

3.00 mos.

3.00 mos.

18.00 cu.m

Total Volume Unit


1.296 cu.m
5.400 cu.m

Total Volume Unit


0.56 cu.m
0.52 cu.m
0.18 cu.m
0.45 cu.m
4.55 cu.m
0.8925 cu.m
1.8 cu.m
2 cu.m
0.298 cu.m

341.11 sq.m
168.00 bags
14.00 cu.m

1,759.00 pcs
141.00 bags
15.29 cu.m.
399.00 kgs
399.00 kgs
16.00 kgs
1.00 l.s

QTY Unit
3.00 sets
3.00 sets
8.00 pcs
8.00 pcs
8.00 pcs
1.00 pcs
1.00 pcs
1.00 pcs
5.00 pcs
8.00 pcs
8.00 pcs
3.00 pcs
10.00 pcs
2.00 pcs
3.00 pcs
6.00 pcs
18.00 pcs
10.00 pcs
6.00 pcs
2.00 pcs
5.00 pcs
8.00 pcs
6.00 pcs
3.00 pcs

93.6 sq.m

2381.16 kgs.

Total Weight Unit


59.4216 kgs.
Total Weight Unit

627.03918 kgs.

Total Weight Unit

375.87654 kgs.

Total Weight Unit

48.2274 kgs.

No. of Truss Total Weight Unit

3 36.0315 kgs.
345.03 cu.m

Total Volume Unit

20.088 cu.m
187.500 cu.m

Total Volume Unit

117.450 cu.m
11.535 cu.m
8.100 cu.m
0.360 cu.m

118.237 cu.m
118.00 cu.m

Total Volume Unit


0.54 cu.m
0.36 cu.m
0.54 cu.m

Total Volume Unit


3.24 cu.m
24.3 cu.m

Total Volume Unit


1.12 cu.m
1.04 cu.m
0.596 cu.m
0.8925 cu.m
0.175 cu.m

Total Volume Unit


5.6385 cu.m
54.675 cu.m

Unit
cu.m
cu.m
cu.m
cu.m

Unit
cu.m
cu.m
cu.m
cu.m
cu.m

Unit
cu.m
cu.m

Unit
cu.m

Unit
cu.m

Unit
cu.m

Unit
cu.m
cu.m

Unit

kgs. 16mm
kgs. 12mm
kgs. 12mm

Unit

kgs. 16mm
kgs. 12mm

Unit

kgs. 12mm

Unit

kgs. 12mm
kgs. 12mm

Unit
kgs. 12mm

Unit

kgs. 16mm

Unit
kgs. 16mm

Unit
kgs. 16mm

Unit

kgs. 16mm

Unit

kgs. 16mm

Unit

kgs. 16mm

Unit

kgs. 16mm
Unit
kgs. 10mm
kgs. 10mm

Unit
kgs. 10mm
kgs. 12 mm
kgs. 10 mm

Unit

kgs. 10mm

Unit

kgs. 10mm

Unit

kgs. 10mm

Unit

kgs. 10mm

Unit
kgs. 10mm
kgs. 10mm

Unit

kgs. 10mm
kgs. 10mm
kgs. 10mm
kgs. 10mm
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm
kgs. 10mm
kgs. 10mm

15.72 sq.m

total Area
B (m.) Area (sq.m.) Qty. (sets) Unit
(sq.m.)
1.2 1.68 8 13.44 sq.m.
1.2 0.6 2 1.2 sq.m.
0.6 0.36 3 1.08 sq.m.

12.18 sq.m

total Area
B (m.) Area (sq.m.) Qty. (sets) Unit
(sq.m.)
2.1 3.36 2 6.72 sq.m.
2.1 1.68 1 1.68 sq.m.
2.1 1.26 3 3.78 sets
32 sets
6 sets

W no. Perimeter
1.6 2 11.6 31.71 bd.ft.
0.8 1 5 13.67 bd.ft.
10 bags
2 cu.m

4 bags
1 cu.m

529.47 sq.m
51.84 sq.m

d Gutter GA 24

1.00 l.s
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Two(2) Storey Four (4) Classroom


at Bagong Pook ES, Lian, Batangas
Item No./ Description: SPL-9 Rail Guard
Unit of Measurement: lot
Quantity: 1.00
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman 1 45 82.84
Skilled Laborer 2 45 60.05
Laborer 4 45 46.25

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Welding Machine 1 1 106.26
Oxy-Acetylene Outfit 1 1 3,500.00

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
50 mm Ø G.I. Pipe Sch. 40 pcs 17.00 1,425.00
38 mm Ø G.I. Pipe Sch. 40 pcs 6.00 1,070.00
Square Bar 19mm kgs 341.64 50.00
Welding Rod kgs 9.00 120.00

Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contingencies & Miscellaneous (OCM) per DO 22, s. 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost
Amount

3,727.80
5,404.50
8,325.00

17,457.30

Amount

106.26
3,500.00

3,606.26
21,063.56

Amount

24,225.00
6,420.00
17,082.00
1,080.00

48,807.00
69,870.56
8,384.47
6,987.06
4,262.10
89,504.18
89,504.18
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Bolbok, Tuy, Batangas
Item No./ Description: SPL-8 Fire Escape
Unit of Measurement: lot
Quantity: 1.00
Designation No. of Person No. of Hours Hourly Rate Amount
A Labor
Construction Foreman 1 45 82.84 3,727.80
Skilled Laborer 1 45 60.05 2,702.25
Laborer 2 45 46.25 4,162.50

Sub-Total for A 10,592.55

N ame and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment
Welding Machine 1 23 106.26 2,443.87
Oxy-Acetylene Outfit 1 5 3,500.00 17,500.00
Minor Tools 1,059.26

Sub-Total for B 21,003.12


C. Total (A+B) 31,595.67
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost Amount
F. Materials
Channel Bar, C 8 x 13 kgs. 491.04 50.00 24,552.00
Angle Bar, L50 x 50 x 6mm kgs. 53.64 50.00 2,682.00
Angle Bar, L65 x 65 x 6mm kgs. 106.38 50.00 5,319.00
Angle Bar, L38 x 38 x 4.5mm kgs. 42.48 50.00 2,124.00
Angle Bar, L25 x 25 x 4.5mm kgs. 8.70 50.00 435.00
Base Plate 12mm kgs. 3.77 50.00 188.50
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Bolbok, Tuy, Batangas
Item No./ Description: SPL-8 Fire Escape
Unit of Measurement: lot
Quantity: 1.00
Gusset Plate 10mm kgs. 7.07 50.00 353.50
Gusset Plate 8mm kgs. 16.96 50.00 848.00
Checkered Plate 6mm kgs. 446.25 50.00 22,312.50
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Bolbok, Tuy, Batangas
Item No./ Description: SPL-8 Fire Escape
Unit of Measurement: lot
Quantity: 1.00
Square Bar 20mm kgs. 650.83 50.00 32,541.50
50 mm Ø G.I. Pipe Sch. 40 pcs. 4.00 1,425.00 5,700.00
100 mm Ø G.I. Pipe Sch. 40 pcs. 2.00 3,680.00 7,360.00
Anchor Bolts, 12mmØ x 350mm pcs. 16.00 150.00 2,400.00
Anchor Bolts, 10mmØ x 100mm pcs. 4.00 80.00 320.00
Anchor Bolts, 12mmØ x 100mm pcs. 4.00 90.00 360.00
Base Plate, 8mm thk. kgs. 5.66 50.00 283.00
Welding Rod kgs. 46.00 120.00 5,520.00

Sub-Total for F 113,299.00


G. Direct Unit Cost (E+F) 144,894.67
H. Overhead, Contingencies & Miscellaneous (OCM) per DO 22, s. 2015 12% of G 17,387.36
I. Contractor's Profit (CP) 10% of G 14,489.47
J. Value Added Tax (VAT) 5% of (G+H+I) 8,838.57
K. Total Item Cost (G+H+I+J) 185,610.07
L Total Unit Cost 185,610.07
Construction of Day Care Center Brgy. Bolbok, Tuy, B
Bolbok, Tuy, Batangas
QUANTITY TAKE-OFF

A.1.1 Temporary Facilities

A.1.2 Progress Photographs

SPL-1 Project Billboard

SPL-2 Construction Safety & Health Program

SPL-3 Mobilization/Demobilization

SPL-4 Gravel Bedding

Item Length (m) Width (m) Thickness (m) No. of Footing


Column Footing 1.2 1.2 0.1 9
Footing(Retaining Wall) 10 1.8 0.1 3

Item Length (m) Width (m) Thickness (m) No. of Span


Wall Footing (Gridline 1&3) 7 0.4 0.1 2
Wall Footing (Gridline A&C) 6.5 0.4 0.1 2
Septic tank (Footing) 1.5 0.4 0.1 3
Septic tank 1.5 3 0.1 1
Flooring 7 6.5 0.1 1
Flooring 5.95 1.5 0.1 1
Flooring(out1) 10 1.8 0.1 1
Flooring(out2) 10 1 0.1 2
Wall Footing (Internal) 7.45 0.4 0.1 1

SPL-5 Masonry Works w/ Plastering

Total Area less


Item Width (m) Height (m) area of doors Unit
and windows

CHB #5 (Front) Ground 7 3.9 21.9 sq.m


CHB #5 (Right) Ground 6.5 3.9 23.67 sq.m
CHB #5 (Left) Ground 6.5 3.9 18.63 sq.m
CHB #5 (Rear)Ground 7 3.9 24.9 sq.m
Total Area less
Item Length (m) Width (m) area of doors Unit
and windows

CHB #4 (Ground) 15.2 3.9 56.76 sq.m

Total Area less


Item Width (m) Length (m) area of doors Unit
and windows

CHB #5 (2nd Level) 27 4.05 99.75 sq.m

Total Area less


Item Length (m) Width (m) area of doors Unit
and windows

CHB #4 (2nd Level) 2.7 7.55 19.125 sq.m

Item Length (m) Width (m) Total Area Unit


CHB #5 (Septic Tank) 1.8 10.5 14.5125 sq.m
CHB #4 (Perimeter Wall) 2.075 30 57.8625 sq.m

Item Length (m) Width (m) Total Area Unit


CHB #4 (cath basin) 0.5 0.5 4 sq.m

Item Total Area Unit cement=


Plastering 682.22 sq.m sand=

#5 CHB= 2,943.00 pcs #4 CHB=


cement= 208.00 bags cement=
sand= 17.16 cu.m. sand=
10mmØ vertical bar= 671.00 kgs 10mmØ vertical bar=
10mmØ horizontal bar= 671.00 kgs 10mmØ horizontal bar=
tie wire= 27.00 kgs tie wire=

Materials Quantity Unit


#5 CHB 2943.00 pcs
#4 CHB 1759.00 pcs
cement 517.00 bags
sand 46.45 cu.m.
10mmØ vertical bar 1070.00 kgs
10mmØ horizontal bar 1070.00 kgs
tie wire 43.00 kgs
SPL-6 Plumbing Works

ITEM QTY
Water Closet Inc. Fittings and Acc. (Round) American Std. or Equivalent 3
Lavatory Inc. Fittings and Acc. American Std. or Equivalent 3
PPR 25mm 8
PPR 32mm 8
PPR REDUCER 25x32mm 8
Check Valve 1
Gate Valve 1
Water Meter 1
PPR Elbow 25mm 5
PPR Tee 25mm 8
PPR Coupling 25mm 8
Faucet 3
Solvent 10
PVC P-Trap 100mmØ 2
PVC P-Trap 50mmØ 3
PVC Pipe 150mmØ 6
PVC Pipe 100mmØ 18
PVC Pipe 50mmØ 10
PVC 45deg. Single Branch, Wye 100mm x 50mm 6
PVC Clean-out w/ plug & sealing ring 100mm 2
PVC Elbow 90 deg 100mm 5
PVC Elbow 90 deg 50mm 8
PVC Coupling 100mm 6
Floor Drain 3

SPL-7 Ceiling

Ceiling Area 93.6 sq.m.


Ceiling Joist 502.91 bd.ft.
Ceiling Board 33.00 pcs
Finishing Nail Assorted 11.00 kgs

403 Steel Works

Base Plate
Item Length (m) Width (m) Thickness (m) No. of Plate
0.35 0.2 0.012 9
16mm x 0.3m Anchor Bolts

Total No. of
Item No. of Bolts No. of Column Unit
Bolts
4 9 36 pcs

12mm x 0.15m Anchor Bolts

Total No. of
Item No. of Bolts No. of Column Unit
Bolts
2 9 18 pcs

Truss (Main Members)


Unit Weight
Item Length (m) Weight No. of Truss
(kg/m)
65mm x 65mm x 6mm Angel 35.366 5.91 209.01306 3
Bar

Truss (Web Members)


Unit Weight
Item Length (m) Weight No. of Truss
(kg/m)
50mm x 50mm x 5mm Angel 33.234 3.77 125.29218 3
Bar

Angle Bar Cleats


Unit Weight
Item Length (m) Weight No. of Truss
(kg/m)
75mm x 75mm x 6mm Angel 2.34 6.87 16.0758 3
Bar Cleats

Gusset Plate
Unit Weight
Item Length (m) Width (m) No. of Plate
(kg/sq.m)
6mm thk. Gusset Plate 0.1 0.15 47.1 17

Sagrod
Unit Weight
Item Length (m) Total Weight Unit
(kg/m)
12mm dia. Sagrod w/ nuts & 54 5.33 287.82 kgs.
washers

Stainless Steel Handrails


Item qty Unit
38mm Stainless pipe for ramp 20 pcs
and stairs and walkway
Summary Materials Quantity Unit
Base Plate 59.4216 kgs

16mm x 0.3m Anchor Bolts 36.00 pcs

65mm x 65mm x 6mm Angel 627.04 kgs


Bar

50mm x 50mm x 5mm Angel 375.88 kgs


Bar

6mm thk. Gusset Plate 36.03 kgs


150x65x20x2mmmm C-purlins 603.648 kgs
(roof & fasia)
12mm dia. sagrod w/ nuts & 287.82 kgs
washer

75mm x 75mm x 6mm Angel 48.2274 kgs.


Bar Cleats

38mm Stainless pipe for ramp 20.00 pcs


and stairs and walkway
Welding Rod 23.00 kgs
12mm x 0.15m Anchor Bolts 18.00 pcs

802 Excavation

Item Length (m) Width (m) Depth (m) No. of Footing

Column Footing 1.200 1.200 1.550 9.000


Lot area 10.000 10.000 1.875 1.000

Item Length (m) Width (m) Depth (m) No. of Span

Footing(Retaining wall) 10.000 1.800 2.175 3.000


Wall Footing 38.450 0.400 0.750 1.000
Septic Vault 1.500 3.000 1.800 1.000
Septic Vault (Footing) 1.500 0.400 0.200 3.000

804(a) Backfilling of Excavated Materials


Total Volume of Total Volume Total Volume
Item Of Concrete Unit
Excavation of Backfill
(below NGL)

1 2 (1-2)
Excavated Materials 336.933 218.696 118.237 cu.m

900 Reinforced Concrete

Concrete

Item Length (m) Width (m) Depth (m) No. of Septic


Septic Tank 3 1.8 0.1 1
Septic Tank(Footing) 1.5 0.4 0.2 3
Septic Tank(Cover) 3 1.8 0.1 1

Item Length (m) Width (m) Depth (m) No. of Footing


Column Footing 1.2 1.2 0.25 9
Footing (Retaining Wall) 10 1.8 0.45 3

Item Length (m) Width (m) Depth (m) No. of Span


Wall Footing (Gridline 1&3) 7 0.4 0.2 2
Wall Footing (Gridline A&C) 6.5 0.4 0.2 2
Wall Footing (Internal) 7.45 0.4 0.2 1
Stairs 0.3 1 0.175 17
Landing 1 1 0.175 1

Item Length (m) Width (m) Depth (m) No. of Column


Column 0.2 0.35 8.95 9
Retaining Wall 10 0.45 4.05 3

Item Length (m) Width (m) Thickness (m) Total Volume


Flooring(out1) 10 1.8 0.1 1.8
Flooring (out2) 10 1 0.1 2
Flooring 7 6.5 0.1 4.55
Flooring (out3) 5.95 1.5 0.1 0.8925

Item Length (m) Width (m) Thickness (m) Total Volume


Floor Beam 1 3.4 0.35 0.25 0.8925
Floor Beam 2 3.8 0.35 0.25 1.6625
Floor Beam 3 2.95 0.35 0.25 0.774375
Floor Beam 4 3.55 0.35 0.25 0.931875
Floor Beam 5 2.25 0.35 0.25 0.196875

Item Length (m) Width (m) Thickness (m) Total Volume


Roof Beam 1 7 0.35 0.2 1.47
Roof Beam 2 6.5 0.35 0.2 1.365

Item Length (m) Width (m) Thickness (m) Total Volume


2nd Floor Slab 7 7.5 0.1 5.25

Item Length (m) Width (m) Thickness (m) Total Volume


Sun Breaker 19.1 0.6 0.125 1.4325

Item Length (m) Width (m) Thickness (m) Total Volume


Ramp 3.8 1 0.1 0.5245

Item Length (m) Width (m) Thickness (m) Total Volume


Lintel Beam 19.1 0.25 0.12 0.7175
Lavatory 1.95 0.5 0.15 0.29075

Materials Quantity Unit


Portland Cement 1239.00 bags
Sand 59.00 cu.m
Gravel 118.00 cu.m
12mm thk. X 4' x8' Marine Plywood 70.00 pcs
Coco Lumber Assrtd. 2077.00 bd.ft
Assrtd. CWNail 21.00 kgs

Reinforcing Steel Bars

Main Bars

Item Length No. of bars No. of Footing Weight

Footing 1.2 7 9 249.0198


Footing(Retaining Wall) 10 11 3 543.4957
Footing(Retaining Wall) 1.8 20 3 177.8713

Item Length No. of bars No. of Column Weight

Column 8.95 6 9 795.9741


Item Length No. of bars No. of Gridline Weight

Wall Footing (Gridline 1&3) 7 3 2 38.9322

Item Length No. of bars No. of Gridline Weight

Wall Footing (Gridline A&C) 6.5 3 2 36.1513


Lavatory 1.95 6 1 7.5287

Item Length No. of bars No. of Gridline Weight


Wall Footing (Internal) 10.1 3 1 28.0868

Item Length No. of bars No. of Gridline Weight

Floor Beam 1 3.4 6 3 100.7937

Item Length No. of bars No. of Gridline Weight


Floor Beam 2 3.8 6 5 187.7530

Item Length No. of bars No. of Gridline Weight


Floor Beam 3 2.95 6 3 87.4534

Item Length No. of bars No. of Gridline Weight

Floor Beam 4 3.55 6 3 105.2405

Item Length No. of bars No. of Gridline Weight

Floor Beam 5 2.25 6 1 22.2339

Item Length No. of bars No. of Gridline Weight

Roof Beams 1 7 6 3 207.5165

Item Length No. of bars No. of Gridline Weight

Roof Beams 2 6.5 6 3 192.6939

Item Length No. of bars All Canopy Weight


Sun Breaker 19.1 8 1 98.323
Lintel Beam 19.1 4 1 49.162

Item Length No. of bars All Canopy Weight


Stairs 1 1 17 10.939
Stairs 1 3 1 2.781
Stairs 0.8 3 17 26.254

Along Gridline
Item Length No. of bars Weight
1,2 & 3

Flooring 7 1 17 76.5739

Along Gridline
Item Length No. of bars Weight
A,B & C

Flooring 6.5 1 18 75.2870

Along Gridline
Item Length No. of bars Weight
1,2 & 3

2nd Floor Slab 7 1 38 171.1652

Along Gridline
Item Length No. of bars Weight
A,B & C

2nd Floor Slab 7.5 1 35 161.875

Item Length No. of bars Septic Weight


Septic Tank 2 7 28 252.2435
Septic Tank (Cover) 3 10 60 1158.2609

TIES

Item Length No. of bars No. of Column Weight

Column Ties 1.5 47 9 408.2870


Wall Footing1 1.2 36 2 55.5965
Wall Footing2 1.2 33 2 50.9635
Wall Footing3 1.2 38 1 29.3426

Item Length No. of bars No. of Beam Weight


Floor Beam 1 1.5 19 3 55.0174

Item Length No. of bars No. of Beam Weight


Floor Beam 2 1.5 22 5 106.1739

Item Length No. of bars No. of Beam Weight


Floor Beam 3 1.5 16 3 46.330

Item Length No. of bars No. of Beam Weight


Floor Beam 4 1.5 20 3 57.913

Item Length No. of bars No. of Beam Weight


Floor Beam 5 1.5 11 1 10.617

Item Length No. of bars No. of Beam Weight


Roof Beam 1 1.5 43 3 124.5130

Item Length No. of bars No. of Beam Weight


Roof Beam 2 1.5 40 3 115.8261

Item Length No. of bars No. of Beam Weight


Sun Breaker 1.2 64 1 49.4191
Lintel Beam 0.75 64 1 30.8870
Lavatory 1 22 2 28.3130

Materials Quantity Unit


16mm dia. Def. Bars 2803.5482 kgs
12mm dia. Def. Bars 111.2487 kgs
10mm dia. Def. Bars 3400.2618 kgs
tie wire 127.0000 kgs

1005 Windows

DESCRIPTION A (m.)

a. Aluminum Frame Sliding window 1.4


b. Fixed Glass window on aluminum frame 0.5
c. Awning Type window 0.6

1010 Doors

DESCRIPTION A (m.)

a.Solid Panel Board 1.6


b. Hollow Core Flush Door 0.8
c. PVC Door w/ Complete Accessories 0.6
d. Hinge (50mm x 101mm)
e. Door Locks (Schlage or equivalent)

L
f. 2" x 5" Door Jamb 2.1
g. 2" x 5" Door Jamb 2.1

1018 Tile Works

Description Length Width/ Height Area unit


Floor Tiles 3.20 6.50 20.80 sq.m
1.50 3.80 5.70 sq.m
2.80 3.80 10.64 sq.m
3.40 6.50 22.10 sq.m
3.80 1.30 4.94 sq.m
2.30 3.55 8.17 sq.m
2.80 1.95 5.46 sq.m
Stairs ( Unglazed Tiles) 8.08 1.00 8.08 sq.m
Landing ( Unglazed Tiles) 1.18 1.00 1.18 sq.m
87.06
Tile Grout 8.71
say 9.00 packs

cement= area x (0.082 + 0.025)= 9.314885 say


sand= 0.025 x area x 0.5= 1.09 say

Description Length Width/ Height Area unit


CR Floor Tiles 1.75 2.20 3.85 sq.m
CR Floor Tiles 2.05 2.20 4.51 sq.m
CR Floor Tiles 1.50 2.20 3.30 sq.m
CR Wall Tiles 3.50 0.70 2.45 sq.m
8.80 0.70 6.16 sq.m
4.10 0.70 2.87 sq.m
3.00 0.70 2.10 sq.m
4.50 0.70 3.15 sq.m
28.39
Tile Grout 2.84
say 3.00 packs

cement= area x (0.082 + 0.025)= 3.03773 say


sand= 0.025 x area x 0.5= 0.35 say

Materials QTY unit


Tile Grout 12.00 packs
Cement 14.00 bags
Sand 3.00 cu.m
Glazed Tiles 103.79 sq.m
Unglazed Tiles 11.66 sq.m

1032 Painting Works

Total Area = 529.47

Materials AREA no. unit


Paint Latex Gloss 529.47 18.00 gal.
Paint Latex Semi-Gloss 529.47 36.00 gal.
Paint Metal Epoxy 5.00 gal.
Lacquer Thinner 3.00 gal.
Masonry Putty 529.47 18.00 gal.
Concrete Neutralizer 5.00 gal.
Paint Brush 6.00 pcs.
Roller Brush 6.00 pcs.

1014 Pre-Painted Metal Sheets

Roofing
Item Length (m) Width (m) Area Unit
Long Span Rib Type GA 26 7.2 7.2 51.84 sq.m

No. of
Item Length (m) Unit
Flashing
Pre-Painted Gutter GA 24 8 4 l.m

No. of
Item Length (m) Unit
Flashing
Flashing GA 24 9.25 4 l.m Pre-Painted Gutter GA 24

Materials Quantity Unit


Long Span Rib Type GA 26 51.84 sq.m
Pre-Painted Gutter GA 24 4.00 pcs
Flashing GA 24 4.00 pcs
Tex Screw 480.00 pcs
Blind Rivets 120.00 pcs
Roofing Sealant 3.00 pcs

1100 Electrical Works

Materials
1 RSC 25.4mm dia. 2 pc
2 Service Entrance Cap 1 pc
3 Junction Box, 4"x4" G.I. 20 pcs
4 Utility Box, 2"x4" G.I. 20 pcs
5 16mmØ x 2.40m Grounding Rod Copperweld w/ Heavy Duty Cla 2 pcs
6 2.0mm2 THHN Wire, Stranded 400 m
7 3.5mm2 THW Wire, Stranded 250 m
8 5.5mm2 THW Wire, Stranded 20 m
9 8.0mm2 THW Wire, Stranded 40 m
10 Two Gang Universal/Ground Convenience Outlet 8 sets
11 Single Gang Switch 6 sets
12 Two Gang Switch 1 sets
13 Three Gang Switch 1 sets
1 x 40 Flourescent Fixture with Aluminum Reflector and 4 sets
14 accessories (Lamps, Ballast, Starter)
15 18 watts ESL Cool Daylight 7 pcs
16 Ceiling Receptacle, 3 1/2" dia. 7 pcs
17 Panel Box, Flush Type, 4 Branches (MDP) 1 pc
18 Circuit Breaker, 30A, 2P, Bolt Type 1 pcs
19 Circuit Breaker, 20A, 2P, Bolt Type 1 pcs
20 Circuit Breaker, 40A, 2P, Bolt Type 1 pc
21 uPVC Pipe, 12.7mm dia. 45 pcs
22 uPvc Pipe, 19mm dia. 50 pcs
23 uPvc Pipe, 25.4mm dia. 4 pcs
24 uPVC Elbow Short Radius, 12.7mm dia. 8 pcs
25 uPVC Elbow Long Radius, 12.7mm dia. 10 pcs
26 uPVC Elbow Long Radius, 19mm dia. 15 pcs
27 uPVC Elbow Long Radius, 25.4mm dia. 2 pcs
28 RSC Elbow, 25.4mm dia. 2 pcs
29 uPVC Coupling, 12.7mm dia. 20 pcs
30 uPVC Coupling, 19mm dia. 25 pcs
31 uPVC Coupling, 25.4mm dia. 2 pcs
32 RSC Coupling, 25.4mm dia. 2 pcs
33 #8 masonry drill bit 1 pc
34 #8 tox and screw 40 sets
35 1" U-Metal Clamp 20 pcs
36 Electrical Tape 14 rolls
37 Rubber Tape 2 rolls
38 1/2" Mica Tube 10 m
39 #16 Tie Wire 6 kg
40 #8 Nylon Cable Ties, White 6 packs
er Brgy. Bolbok, Tuy, Batangas 1st LD
Tuy, Batangas
TITY TAKE-OFF

3.00 mos.

3.00 mos.

2.00 ea.

3.00 mos.

3.00 mos.

18.00 cu.m

Total Volume Unit


1.296 cu.m
5.400 cu.m

Total Volume Unit


0.56 cu.m
0.52 cu.m
0.18 cu.m
0.45 cu.m
4.55 cu.m
0.8925 cu.m
1.8 cu.m
2 cu.m
0.298 cu.m

341.11 sq.m
168.00 bags
14.00 cu.m

1,759.00 pcs
141.00 bags
15.29 cu.m.
399.00 kgs
399.00 kgs
16.00 kgs
1.00 l.s

QTY Unit
3.00 sets
3.00 sets
8.00 pcs
8.00 pcs
8.00 pcs
1.00 pcs
1.00 pcs
1.00 pcs
5.00 pcs
8.00 pcs
8.00 pcs
3.00 pcs
10.00 pcs
2.00 pcs
3.00 pcs
6.00 pcs
18.00 pcs
10.00 pcs
6.00 pcs
2.00 pcs
5.00 pcs
8.00 pcs
6.00 pcs
3.00 pcs

93.6 sq.m

2381.16 kgs.

Total Weight Unit


59.4216 kgs.
Total Weight Unit

627.03918 kgs.

Total Weight Unit

375.87654 kgs.

Total Weight Unit

48.2274 kgs.

No. of Truss Total Weight Unit

3 36.0315 kgs.
345.03 cu.m

Total Volume Unit

20.088 cu.m
187.500 cu.m

Total Volume Unit

117.450 cu.m
11.535 cu.m
8.100 cu.m
0.360 cu.m

118.237 cu.m
118.00 cu.m

Total Volume Unit


0.54 cu.m
0.36 cu.m
0.54 cu.m

Total Volume Unit


3.24 cu.m
24.3 cu.m

Total Volume Unit


1.12 cu.m
1.04 cu.m
0.596 cu.m
0.8925 cu.m
0.175 cu.m

Total Volume Unit


5.6385 cu.m
54.675 cu.m

Unit
cu.m
cu.m
cu.m
cu.m

Unit
cu.m
cu.m
cu.m
cu.m
cu.m

Unit
cu.m
cu.m

Unit
cu.m

Unit
cu.m

Unit
cu.m

Unit
cu.m
cu.m

Unit

kgs. 16mm
kgs. 12mm
kgs. 12mm

Unit

kgs. 16mm
Unit

kgs. 12mm

Unit

kgs. 12mm
kgs. 12mm

Unit
kgs. 12mm

Unit

kgs. 16mm

Unit
kgs. 16mm

Unit
kgs. 16mm

Unit

kgs. 16mm

Unit

kgs. 16mm

Unit

kgs. 16mm

Unit

kgs. 16mm

Unit
kgs. 10mm
kgs. 10mm

Unit
kgs. 10mm
kgs. 12 mm
kgs. 10 mm

Unit

kgs. 10mm

Unit

kgs. 10mm

Unit

kgs. 10mm

Unit

kgs. 10mm

Unit
kgs. 10mm
kgs. 10mm

Unit

kgs. 10mm
kgs. 10mm
kgs. 10mm
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm

Unit
kgs. 10mm
kgs. 10mm
kgs. 10mm

15.72 sq.m

total Area
B (m.) Area (sq.m.) Qty. (sets) Unit
(sq.m.)
1.2 1.68 8 13.44 sq.m.
1.2 0.6 2 1.2 sq.m.
0.6 0.36 3 1.08 sq.m.

12.18 sq.m

total Area
B (m.) Area (sq.m.) Qty. (sets) Unit
(sq.m.)
2.1 3.36 2 6.72 sq.m.
2.1 1.68 1 1.68 sq.m.
2.1 1.26 3 3.78 sets
32 sets
6 sets

W no. Perimeter
1.6 2 11.6 31.71 bd.ft.
0.8 1 5 13.67 bd.ft.
10 bags
2 cu.m

4 bags
1 cu.m

529.47 sq.m
51.84 sq.m

d Gutter GA 24

1.00 l.s
ESTIMATED COST OF PROPOSED WORK
Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Bolbok, Tuy, Batangas
Item % of Direct Cost
Description Unit Quantity
No. Total Total Cost (P) Unit Cost

A.1.1 Temporary Facilities 1.93% mos. 3.00 45,000.00 15,000


A.1.2 Progress Photographs 0.08% mos. 3.00 1,950.00 650
SPL-1 Project Billboard 0.42% ea. 2.00 9,839.16 4,919

SPL-2 Construction Safety & Health Program 0.43% mos. 3.00 9,983.52 3,327

SPL-3 Mobilization/Demobilization 0.82% mos. 3.00 19,007.87 6,335


SPL-4 Gravel Bedding 0.87% cu.m 18.00 20,329.48 1,129
SPL-5 Masonry Works w/ Plastering 15.39% sq.m 341.11 358,387.91 1,050
SPL-6 Plumbing Works 4.71% l.s 1.00 109,650.18 109,650
SPL-7 Ceiling 2.72% sq.m 93.60 63,258.26 675
403 Steel Works 11.22% kgs. 2,381.16 261,219.66 109
802 Excavation 3.36% cu.m 345.03 78,134.00 226
804(a) Backfilling of Excavated Materials 0.14% cu.m 118.24 3,218.86 27
900 Reinforced Concrete 43.02% cu.m. 118.00 1,001,696.38 8,488
1005 Windows 2.13% sq.m 15.72 49,538.52 3,151
1010 Doors 1.93% sq.m 12.18 44,992.32 3,693
1014 Prepainted Metal Sheet 2.11% sq.m. 51.84 49,104.67 947
1018(a) Tile Works (Floor Tiles) 2.22% sq.m 87.06 51,728.45 594
1018(b) Tile Works (CR-Floor & Wall Tiles) 0.79% sq.m 28.39 18,486.18 651
1032 Painting Works 2.62% sq.m 529.47 61,093.85 115
1100 Electrical Works 3.09% l.s 1.00 71,877.37 71,877

Total Direct Cost 100% 2,328,496.62


COST OF PROPOSED WORK
Center Brgy. Bolbok, Tuy, Batangas 1st LD
bok, Tuy, Batangas
Direct Cost Adjusted
Unit Cost (P) Unit Cost (P)

15,000.00 17325.00
650.00 750.75
4,919.58 5682.11

3,327.84 3843.66

6,335.96 6652.75
1,129.42 1446.78
1,050.65 1345.89
109,650.18 140461.88
675.84 865.75
109.70 140.53
226.45 290.09
27.22 34.87
8,488.95 10874.35
3,151.31 4036.82
3,693.95 4731.95
947.24 1213.41
594.20 761.18
651.15 834.12
115.39 147.81
71,877.37 92074.91
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWA
(IMPLEMENTING OFFICE)
(OFFICE ADDRESS)

PROGRAM OF WORK/BUDGET COST


Construction of Day Care Center Brgy. Bolbok,
Project
: Tuy, Batangas 1st LD Area
Location : Bolbok, Tuy, Batangas Classification
Starting Date
Appropriation : Php3,000,000.00 Total Project Du
Source of Fund : Local Infrastructure Program (LIP) No. of Working
No. of Pre-dete
Coordinates : ( 14.019889 , 120.752861 ) Unworkable Da

DESCRIPTION OF WORKS TO BE DONE % OF TOTAL


A.1.1 Temporary Facilities 1.93%
A.1.2 Progress Photographs 0.08%
SPL-1 Project Billboard 0.42%
SPL-2 Construction Safety & Health Program 0.43%
SPL-3 Mobilization/Demobilization 0.82%
SPL-4 Gravel Bedding 0.87%
SPL-5 Masonry Works w/ Plastering 15.39%
SPL-6 Plumbing Works 4.71%
SPL-7 Ceiling 2.72%
403 Steel Works 11.22%
802 Excavation 3.36%
804(a) Backfilling of Excavated Materials 0.14%
900 Reinforced Concrete 43.02%
1005 Windows 2.13%
1010 Doors 1.93%
1014 Prepainted Metal Sheet 2.11%
1018(a) Tile Works (Floor Tiles) 2.22%
1018(b) Tile Works (CR-Floor & Wall Tiles) 0.79%
1032 Painting Works 2.62%
1100 Electrical Works 3.09%
Total 100%

ESTIMATED D
DESCRIPTION
QTY.
A.1.1 Temporary Facilities 3.00
A.1.2 Progress Photographs 3.00
SPL-1 Project Billboard 2.00
SPL-2 Construction Safety & Health Program 3.00
SPL-3 Mobilization/Demobilization 3.00
SPL-4 Gravel Bedding 18.00
SPL-5 Masonry Works w/ Plastering 341.11
SPL-6 Plumbing Works 1.00
SPL-7 Ceiling 93.60
403 Steel Works 2381.16
802 Excavation 345.03
804(a) Backfilling of Excavated Materials 118.24
900 Reinforced Concrete 118.00
1005 Windows 15.72
1010 Doors 12.18
1014 Prepainted Metal Sheet 51.84
1018(a) Tile Works (Floor Tiles) 87.06
1018(b) Tile Works (CR-Floor & Wall Tiles) 28.39
1032 Painting Works 529.47
1100 Electrical Works 1.00

BREAKDOWN OF EXPENDITURE:
1. Labor 384,965.69 A. Sub-Total
2. Materials 1,736,040.95 B. Cost of Enginee
3. Rental of Equipment 207,489.99 C. Taxes(VAT,etc.
4. Provisional Sum - D. RROW Acquisiti
5. OCM and Profit 500,074.80 E. TOTAL ESTIM
6. Value Added Tax 141,428.57
7. EAO, 1% 30,000.00
8. RROW Acquisition -
9. Physical Reserved -
10. TOTAL ESTIMATED COST Php3,000,000.00

Prepared by:

AIELYN M. CATILO
Engineer I

Checked by:

VIVIAN VIENNA B. CASTILLO


Engineer II

Approved:

JULIANA D. VERGARA
District Engineer
IC OF THE PHILIPPINES
PUBLIC WORKS AND HIGHWAYS
LEMENTING OFFICE)
(OFFICE ADDRESS)

OF WORK/BUDGET COST

: 45.50 sq.m
Classification : Multipurpose/Facilities
Starting Date :
Total Project Duration : 90 cd
No. of Working Days :
No. of Pre-determined
Unworkable Days :

EQUIPMENT
POSITION REQUIRED

See Annex A'"

MANPOWER
POSITION REQUIRED

See Annex A'"

ESTIMATED DIRECT COST OF THE PROJECT


UNIT TOTAL
mos. 45,000.00
mos. 1,950.00
ea. 9,839.16
mos. 9,983.52
mos. 19,007.87
cu.m 20,329.48
sq.m 358,387.91
l.s 109,650.18
sq.m 63,258.26
kgs. 261,219.66
cu.m 78,134.00
cu.m 3,218.86
cu.m. 1,001,696.38
sq.m 49,538.52
sq.m 44,992.32
sq.m. 49,104.67
sq.m 51,728.45
sq.m 18,486.18
sq.m 61,093.85
l.s 71,877.37
2,328,496.62

Sub-Total 2,328,496.62
Cost of Engineering 30,000.00
Taxes(VAT,etc.) 641,503.38
RROW Acquisition -
TOTAL ESTIMATED COST 3,000,000.00

Submitted by:

FLORENCIA G. CORDOVA
Chief, Planning and Design Section

Recommending Approval:

BENCIO A. AGUZAR
Officer In-Charge
Office of the Assistant District Engineer

IANA D. VERGARA
istrict Engineer
Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Bolbok, Tuy, Batangas

MANPOWER
TOTAL
POSITION NO. OF PERSONNEL EXPIRIENCE
(years)
Project Engineer 1 5
Accredited Material Engineer I 1 -
Construction Foreman 1 5
Safety Officer 1 -
First Aider 1
Electrician 1 -
Skilled Laborer 7 -
Laborer 10 -

EQUIPMENT
NO. OF UNITS
DESCRIPTION
OWNED/LEASED

Concrete Cuter 1
Bagger Mixer 2
Water Truck 1
Concrete Vibrator 2
Bar Cutter 1
Bar Bender 1
Cargo Truck 1
Backhoe( 0.80 cu.m.) 1
Dump Truck (.10 cu.m.) 2
Oxy-Acetylene 1
Welding Machine 1
e Center Brgy. Bolbok, Tuy, Batangas 1st LD
olbok, Tuy, Batangas

ANNEX A"

MANPOWER
SAME POSITION IN
SIMILAR WORKS
(years)
3
-
3
-

-
-
-

EQUIPMENT
NO. OF UNITS
TOTAL
1
2
1
2
1
1
1
1
2
1
1
APPROVED BUDGET FOR CONTRACT
Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Bolbok, Tuy, Batangas
PROJECT NAME & LOCATION

MARK-UPS
ESTIMATED DIRECT TOTAL MARK-UP
ITEM NO. DESCRIPTION QUANTITY UNIT (PERCENT)
COST
OCM PROFIT % VALUE
1 2 3 4 5 6 7 8 9

A.1.1 Temporary Facilities 3.00 mos. 45,000.00 10 10 4,500.00


A.1.2 Progress Photographs 3.00 mos. 1,950.00 10 10 195.00
SPL-1 Project Billboard 2.00 ea. 9,839.16 10 10 983.92
Construction Safety & Health
SPL-2 3.00 mos. 9,983.52 10 10 998.35
Program
SPL-3 Mobilization/Demobilization 3.00 mos. 19,007.87 -
SPL-4 Gravel Bedding 18.00 cu.m 20,329.48 12 10 22 4,472.48

SPL-5 Masonry Works w/ Plastering 341.11 sq.m 358,387.91 12 10 22 78,845.34

SPL-6 Plumbing Works 1.00 l.s 109,650.18 12 10 22 24,123.04


SPL-7 Ceiling 93.60 sq.m 63,258.26 12 10 22 13,916.82
403 Steel Works 2,381.16 kgs. 261,219.66 12 10 22 57,468.33
802 Excavation 345.03 cu.m 78,134.00 12 10 22 17,189.48
Backfilling of Excavated
804(a) 118.24 cu.m 3,218.86 12 10 22 708.15
Materials
900 Reinforced Concrete 118.00 cu.m. 1,001,696.38 12 10 22 220,373.20
1005 Windows 15.72 sq.m 49,538.52 12 10 22 10,898.47
1010 Doors 12.18 sq.m 44,992.32 12 10 22 9,898.31
1014 Prepainted Metal Sheet 51.84 sq.m. 49,104.67 12 10 22 10,803.03
1018(a) Tile Works (Floor Tiles) 87.06 sq.m 51,728.45 12 10 22 11,380.26
Tile Works (CR-Floor & Wall
1018(b) 28.39 sq.m 18,486.18 12 10 22 4,066.96
Tiles)
1032 Painting Works 529.47 sq.m 61,093.85 12 10 22 13,440.65
1100 Electrical Works 1.00 l.s 71,877.37 12 10 22 15,813.02
TOTAL COST 2,328,496.62

PREPARED/SUBMITTED BY : RECOMMENDING APPROVAL :

GODOFREDO C. DE VILLA BENCIO A. AGUZAR


Chief, Construction Section Officer-in-Charge,
Office of the Assistant District Engineer
VED BUDGET FOR CONTRACT
Center Brgy. Bolbok, Tuy, Batangas 1st LD
bok, Tuy, Batangas
OJECT NAME & LOCATION

INDIRECT
VAT ITEMCOST UNIT COST
COST
5%(5+9) (10)+(9) (11)+(5) (12)/(3)
10 11 12 13

2,475.00 6,975.00 51,975.00 17,325.00


107.25 302.25 2,252.25 750.75
541.15 1,525.07 11,364.23 5,682.11
549.09 1,547.45 11,530.97 3,843.66
950.39 950.39 19,958.26 6,652.75
1,240.10 5,712.58 26,042.06 1,446.78

21,861.66 100,707.00 459,094.91 1,345.89

6,688.66 30,811.70 140,461.88 140,461.88


3,858.75 17,775.57 81,033.83 865.75
15,934.40 73,402.72 334,622.39 140.53
4,766.17 21,955.65 100,089.65 290.09
196.35 904.50 4,123.36 34.87
61,103.48 281,476.68 1,283,173.06 10,874.35
3,021.85 13,920.32 63,458.84 4,036.82
2,744.53 12,642.84 57,635.16 4,731.95
2,995.38 13,798.41 62,903.08 1,213.41
3,155.44 14,535.69 66,264.14 761.18
1,127.66 5,194.62 23,680.80 834.12
3,726.72 17,167.37 78,261.22 147.81
4,384.52 20,197.54 92,074.91 92,074.91
2,970,000.00

APPROVED:

JULIANA D. VERGARA
District Engineer
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: A.1.1 Temporary Facilities
Unit of Measurement: mos.
Output per hour:
Quantity: 3.00
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman -
Laborer -

Sub-Total for A -

N ame and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment
Minor Tools (10% of Labor) -

Sub-Total for B -
C. Total (A+B) -
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost Amount
F. Materials
Bunkhouse / House Rental mos. 3.00 15,000.00 45,000.00
(including light & water
consumption)

Sub-Total for F 45,000.00


G. Direct Unit Cost (E+F) 45,000.00
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G 4,500.00
J. Value Added Tax (VAT) 5% of (G+H+I) 2,475.00
K. Total Item Cost (G+H+I+J) 51,975.00
L Total Unit Cost (K÷Quantity) 17,325.00
DETAILED UNIT PRICE ANALYSIS (DUPA)

Project : Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./Description: A.1.2 Progress Photographs
Unit of Measurement: mos.
Output : 3.00

Designation No. of Person No. of Hours Hourly Rate


A Labor

Sub - Total for A


Name and Capacity No. of Units No. of Hours Hourly Rate
B Equipment

Sub - Total for B


C Total (A+B)
D Output = 3.00 mos.
E Direct Unit Cost (C ÷ D)
Name and Specification Unit Quantity Unit Cost
F Materials
Printing pc. 150.00 10.00
Photo Album ea. 2.00 225.00
Sub - Total for F
G Direct Unit Cost (E + F)
H Overhead, Contengencies & Miscellaneous (OCM) pe 0% of G
I Contractor's Profit (CP) 10% of G
J Value Added Tax (VAT) 5% of (G + H + I)
K Total Item Cost (G + H + I + J)
L Total Unit Cost (K÷Quantity)
ED UNIT PRICE ANALYSIS (DUPA)

Amount

-
Amount

-
-

Amount

1,500.00
450.00
1,950.00
1,950.00
-
195.00
107.25
2,252.25
750.75
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Bolbok, Tuy, Batangas
Item No./ Description: SPL-1 Project Billboard
Unit of Measurement: ea.
Output per hour:
Quantity: 2.00
Designation No. of Person No. of Hours Hourly Rate Amount
A Labor
Construction Foreman 1 4 86.37 345.48
Skilled Laborer 1 4 62.66 250.64
Laborer 1 4 48.26 193.04

Sub-Total for A 789.16

N ame and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment

Sub-Total for B -
C. Total (A+B) 789.16
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost Amount
F. Materials
Tarpaulin (4"x8") sq.ft. 64.00 25.00 1,600.00
½" thick Marine Plywood pcs. 2.00 750.00 1,500.00
Good Lumber bd.ft. 84.00 70.00 5,880.00
CWN Assorted kgs. 1.00 70.00 70.00

Sub-Total for F 9,050.00


G. Direct Unit Cost (E+F) 9,839.16
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G 983.92
J. Value Added Tax (VAT) 5% of (G+H+I) 541.15
K. Total Item Cost (G+H+I+J) 11,364.23
L Total Unit Cost (K÷Quantity) 5,682.11
DETAILED UNIT PRICE ANALYSIS
Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: SPL-2 Construction Safety & Health Program
Unit of Measurement: mos.
Output per hour:
Quantity: 3.00
Designation No. of Person No. of Hours Hourly Rate Amount
A Labor
Safety Personnel 1 16.00 77.72 1,243.52
First Aider 1 16.00 46.25 740.00

Sub-Total for A 1,983.52

N ame and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment

Sub-Total for B -
C. Total (A+B) 1,983.52
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost Amount
F. Materials
Medicine kit including medicine kit 1.00 4,000.00 4,000.00
Gloves pair 4.00 300.00 1,200.00
Boots pair 4.00 350.00 1,400.00
Hard Hat pair 4.00 350.00 1,400.00

Sub-Total for F 8,000.00


G. Direct Item Cost (E+F) 9,983.52
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G 998.35
J. Value Added Tax (VAT) 5% of (G+H+I) 549.09
K. Total Item Cost (G+H+I+J) 11,530.97
L Total Unit Cost 3,843.66
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: SPL-3 Mobilization/Demobilization
Unit of Measurement: mos.
Output per hour:
Quantity: 3.00
Designation No. of Person No. of Hours Hourly Rate
A Labor

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials

Mobilization/Demobilization

Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
TAILED UNIT PRICE ANALYSIS

Amount

Amount

Amount

19,007.87

19,007.87
19,007.87

950.39
19,958.26
6,652.75
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: SPL-4 Gravel Bedding
Unit of Measurement: cu.m
Output per hour:
Quantity: 18.00
Designation No. of Person No. of Hours Hourly Rate Amount
A Labor
Construction Foreman 1 25 86.37 2,159.25
Laborer 2 25 48.26 2,413.00
Sub-Total for A 4,572.25

N ame and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment
Minor Tools (10% of Labor) 457.23

Sub-Total for B 457.23


C. Total (A+B) 5,029.48
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost Amount
F. Materials
Gravel cu.m. 18.00 850.00 15,300.00

Sub-Total for F 15,300.00


G. Direct Unit Cost (E+F) 20,329.48
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G 2,439.54
I. Contractor's Profit (CP) 10% of G 2,032.95
J. Value Added Tax (VAT) 5% of (G+H+I) 1,240.10
K. Total Item Cost (G+H+I+J) 26,042.06
L Total Unit Cost (K÷Quantity) 1,446.78
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st

Location: Bolbok, Tuy, Batangas


Item No./ Description: SPL-5 Masonry Works w/ Plastering
Unit of Measurement: sq.m
Output per hour:
Quantity: 341.11
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman 1 90 86.37
Skilled Laborer 4 90 62.66
Laborer 8 90 48.26
Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Bar Cutter 1 20 219.75
Bar Bender 1 20 351.50
Minor Tools (10% of Labor)

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
#5 CHB pcs 2,943.00 10.00
#4 CHB pcs 1,759.00 9.00
cement bags 517.00 230.00
sand cu.m. 46.45 680.00
10mmØ vertical bar kgs 1,070.00 36.00
10mmØ horizontal bar kgs 1,070.00 36.00
tie wire kgs 43.00 60.00

Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st

Location: Bolbok, Tuy, Batangas


Item No./ Description: SPL-5 Masonry Works w/ Plastering
Unit of Measurement: sq.m
Output per hour:
Quantity: 341.11
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
AILED UNIT PRICE ANALYSIS

Amount

7,773.30
22,557.60
34,747.20
65,078.10

Amount

4,395.00
7,030.00
6,507.81

17,932.81
83,010.91

Amount

29,430.00
15,831.00
118,910.00
31,586.00
38,520.00
38,520.00
2,580.00

275,377.00
358,387.91
43,006.55
AILED UNIT PRICE ANALYSIS

35,838.79
21,861.66
459,094.91
1,345.89
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Multi-Purpose Building (Covered Court), Gil. Puyat National High School, Balaytigue, Nasugbu, Batangas
Nasugbu, Batangas
Item No./ Description: 104 Embankment (from borrow)
Unit of Measurement: cu.m.
Output per hour: 50.00
Quantity: 577.50
Designation No. of Person No. of Hours Hourly Rate Amount
A Labor
Construction Foreman 1 40 86.37 3,454.80
Laborer 3 40 62.66 7,519.20
Sub-Total for A 10,974.00

N ame and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment
Dump Truck
Plate Compactor
Water Truck
Minor Tools (10% of Labor) 1,097.40

Sub-Total for B 1,097.40


C. Total (A+B) 12,071.40
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost Amount
F. Materials

Common Barrow cu.m. 577.50 450.00 259,875.00

Sub-Total for F 259,875.00


G. Direct Unit Cost (E+F) 271,946.40
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 72, 2012 12% of G 32,633.57
I. Contractor's Profit (CP) 10% of G 27,194.64
J. Value Added Tax (VAT) 5% of (G+H+I) 16,588.73
K. Total Item Cost (G+H+I+J) 348,363.34
L Total Unit Cost (K÷Quantity) 603.23
DETAILED UNIT PRICE ANALYSIS
Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location Bolbok, Tuy, Batangas
Item No./ Description: SPL-6 Plumbing Works
Unit of Measurement: l.s
Output per hour:
Quantity: 1.00
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman 1 60 86.37
Skilled Laborer 2 60 62.66
Laborer 4 60 48.26

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools 10% of labor
Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
Water Closet Inc. Fittings and Acc. (Round) American Std. or sets 3.00 12,000.00
Equivalent

Lavatory Inc. Fittings and Acc. American Std. or Equivalent sets 3.00 4700.00
PPR 25mm pcs 8.00 390.00
PPR 32mm sets 8.00 578.00
PPR REDUCER 25x32mm pcs 8.00 25.00
Check Valve pcs 1.00 400.00
Gate Valve pcs 1.00 550.00
Water Meter pcs 1.00 1200.00
PPR Elbow 25mm pcs 5.00 18.00
PPR Tee 25mm pcs 8.00 19.00
PPR Coupling 25mm pcs 8.00 14.00
Faucet pcs 3.00 140.00
Solvent pcs 10.00 150.00
PVC P-Trap 100mmØ pcs 2.00 194.00
PVC P-Trap 50mmØ pcs 3.00 108.00
PVC Pipe 150mmØ pcs 6.00 650.00
PVC Pipe 100mmØ pcs 18.00 590.00
PVC Pipe 50mmØ pcs 10.00 270.00
PVC 45deg. Single Branch, Wye 100mm x 50mm pcs 6.00 133.00
PVC Clean-out w/ plug & sealing ring 100mm pcs 2.00 36.00
PVC Elbow 90 deg 100mm pcs 5.00 52.00
PVC Elbow 90 deg 50mm pcs 8.00 26.00
PVC Coupling 100mm pcs 6.00 60.00
Floor Drain pcs 3.00 280.00
Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
AILED UNIT PRICE ANALYSIS

Amount

5,182.20
7,519.20
11,582.40

24,283.80

Amount

2,428.38
2,428.38
26,712.18

Amount

36,000.00

14,100.00
3,120.00
4,624.00
200.00
400.00
550.00
1,200.00
90.00
152.00
112.00
420.00
1,500.00
388.00
324.00
3,900.00
10,620.00
2,700.00
798.00
72.00
260.00
208.00
360.00
840.00
82,938.00
109,650.18
13,158.02
10,965.02
6,688.66
140,461.88
140,461.88
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Bolbok, Tuy, Batangas
Item No./ Description: SPL-7 Ceiling
Unit of Measurement: sq.m
Output per hour:
Quantity: 93.60
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman 1 40 82.84
Skilled Laborer 2 40 60.05
Laborer 3 40 46.25

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools (10% of Labor)

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
2"x2" Good Lumber bd.ft. 502.91 70.00
4'x8'x1/4"thk Marine Plywood pcs 33.00 350.00
Finishing Nail Assorted kgs 11.00 70.00
Common Nail Assorted kgs. 10.00 70.00
Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5*% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
Amount

3,313.60
4,804.00
5,550.00

13,667.60

Amount

1,366.76

1,366.76
15,034.36

Amount

35,203.90
11,550.00
770.00
700.00
48,223.90
63,258.26
7,590.99
6,325.83
3,858.75
81,033.83
865.75
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st

Location: Bolbok, Tuy, Batangas


Item No./ Description: 403 Steel Works
Unit of Measurement: kgs.
Output per hour:
Quantity: 2,381.16
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman 1 95.00 86.37
Skilled Laborer 3 95.00 62.66
Laborer 6 95.00 48.26

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Oxy-Acetylene 1 60.00 312.50
Welding Machine 1 60.00 106.25

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
Base Plate kgs 59.42 50.00
16mm x 0.3m Anchor Bolts pcs 36.00 100.00
65mm x 65mm x 6mm Angel Bar kgs 627.04 50.00
50mm x 50mm x 5mm Angel Bar kgs 375.88 50.00
6mm thk. Gusset Plate kgs 36.03 50.00
150x65x20x2mmmm C-purlins (roof & fasia) kgs 603.65 50.00
12mm dia. sagrod w/ nuts & washer kgs 287.82 50.00
75mm x 75mm x 6mm Angel Bar Cleats kgs. 48.23 50.00
38mm Stainless pipe for ramp and stairs and walkway pcs 20.00 3,500.00
Welding Rod kgs 23.00 120.00
12mm x 0.15m Anchor Bolts pcs 18.00 70.00
Scafolding(rental) lot 1.00 3000.00

Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st

Location: Bolbok, Tuy, Batangas


Item No./ Description: 403 Steel Works
Unit of Measurement: kgs.
Output per hour:
Quantity: 2,381.16
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
ILED UNIT PRICE ANALYSIS

Amount

8,205.15
17,858.10
27,508.20

53,571.45

Amount

18,750.00
6,375.00

25,125.00
78,696.45

Amount

2,971.08
3,600.00
31,351.96
18,793.83
1,801.58
30,182.40
14,391.00
2,411.37
70,000.00
2,760.00
1,260.00
3,000.00

182,523.21
261,219.66
31,346.36
26,121.97
ILED UNIT PRICE ANALYSIS

15,934.40
334,622.39
140.53
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: 804(a) Backfilling of Excavated Materials
Unit of Measurement: cu.m
Quantity: 118.24
Designation No. of Person No. of Hours Hourly Rate
A. Labor
Spreading and Compaction:
Construction Foreman 1 16.00 86.37
Laborer 2 16.00 48.26

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost
Amount

1,381.92
1,544.32

2,926.24

Amount

292.62

292.62
3,218.86

Amount
-
3,218.86
386.26
321.89
196.35
4,123.36
34.87
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Bolbok, Tuy, Batangas
Item No./ Description: 802 Excavation
Unit of Measurement: cu.m
Output per hour:
Quantity: 345.03
Designation No. of Person No. of Hours Hourly Rate Amount
A Labor
Construction Foreman 1 40 86.37 3,454.80
Laborer 8 40 48.26 15,443.20

Sub-Total for A 18,898.00

N ame and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment
Minor Tools (10% of Labor) 1,889.80
Backhoe (0.80cu.m.) 1 12 2074.85 24,898.20
Dump Truck (10 cu.m.) 2 12 1352.00 32,448.00

Sub-Total for B 59,236.00


C. Total (A+B) 78,134.00
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost Amount
F. Materials

Sub-Total for F -
G. Direct Unit Cost (E+F) 78,134.00
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G 9,376.08
I. Contractor's Profit (CP) 10% of G 7,813.40
J. Value Added Tax (VAT) 5% of (G+H+I) 4,766.17
K. Total Item Cost (G+H+I+J) 100,089.65
L Total Unit Cost (K÷Quantity) 290.09
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD

Location: Bolbok, Tuy, Batangas


Item No./ Description: 900 Reinforced Concrete
Unit of Measurement: cu.m.
Output per hour:
Quantity: 118.00
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman 1 145 86.37
Skilled Laborer 5 145 62.66
Laborer 8 145 48.26

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Bagger Mixer 1 30 172.00
Water Truck 1 30 1,065.00
Concrete Vibrator 1 30 148.88
Bar Cutter 1 16 219.75
Bar Bender 1 16 351.50
Cargo Truck (10T, 270 Hp) 1 13 1,102.00
Minor Tools

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
Portland Cement bags 1,239.00 230.00
Sand cu.m 59.00 680.00
Gravel cu.m 118.00 850.00
12mm thk. X 4' x8' Marine Plywood pcs 70.00 700.00
Coco Lumber Assrtd. bd.ft 2,077.00 25.00
Assrtd. CWNail kgs 21.00 70.00
16mm dia. Def. Bars kgs 2,558.79 36.00
12mm dia. Def. Bars kgs 813.89 36.00
10mm dia. Def. Bars kgs 4,289.33 36.00
tie wire kgs 127.00 60.00

Sub-Total for F
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD

Location: Bolbok, Tuy, Batangas


Item No./ Description: 900 Reinforced Concrete
Unit of Measurement: cu.m.
Output per hour:
Quantity: 118.00
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
LED UNIT PRICE ANALYSIS

Amount

12,523.65
45,428.50
55,981.60

113,933.75

Amount

5,160.00
31,950.00
4,466.40
3,516.00
5,624.00
14,326.00
11,482.61

76,525.01
190,458.76

Amount

284,970.00
40,120.00
100,300.00
49,000.00
51,925.00
1,470.00
92,116.58
29,300.08
154,415.96
7,620.00

811,237.62
LED UNIT PRICE ANALYSIS

1,001,696.38
120,203.57
100,169.64
61,103.48
1,283,173.06
10,874.35
DETAILED UNIT PRICE ANALYSIS
Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: 1005 Windows
Unit of Measurement: sq.m
Quantity: 15.72
Designation No. of Person No. of Hours Hourly Rate
A Labor
a. Construction Foreman 1 35.00 82.84
b. Skilled Laborer 1 35.00 60.05
c. Laborer 2 35.00 46.25

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
a. Aluminum Frame Sliding window sq.m. 13.44 2,800.00
b. Fixed Glass window on aluminum frame sq.m. 1.20 750.00
c. Awning Type window sq.m. 1.08 1,800.00
Sub-Total for F
G. Direct Item Cost (C+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
Amount

2,899.40
2,101.75
3,237.50

8,238.65

Amount

823.87

823.87
9,062.52

Amount

37,632.00
900.00
1,944.00
40,476.00
49,538.52
5,944.62
4,953.85
3,021.85
63,458.84
4,036.82
DETAILED UNIT PRICE ANALYSIS
Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: 1010 Doors
Unit of Measurement: sq.m
Quantity: 12.18
Designation No. of Person No. of Hours Hourly Rate
A Labor
a. Construction Foreman 1 35.00 82.84
b. Skilled Laborer 1 35.00 60.05
c. Laborer 2 35.00 46.25

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
a.Solid Panel Board sq.m. 6.72 2,450.00
b. Hollow Core Flush Door sq.m. 1.68 690.00
c. PVC Door w/ Complete Accessories sets 3.78 2,500.00
d. Hinge (50mm x 101mm) sets 32.00 65.00
e. Door Locks (Schlage or equivalent) sets 6.00 600.00
f. 2" x 5" Door Jamb bd.ft. 31.71 70.00
g. 2" x 5" Door Jamb bd.ft. 13.67 70.00
Sub-Total for F
G. Direct Item Cost (C+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost
Amount

2,899.40
2,101.75
3,237.50

8,238.65

Amount

823.87

823.87
9,062.52

Amount

16,464.00
1,159.20
9,450.00
2,080.00
3,600.00
2,219.70
956.90
35,929.80
44,992.32
5,399.08
4,499.23
2,744.53
57,635.16
4,731.95
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: 1014 Prepainted Metal Sheet
Unit of Measurement: sq.m.
Quantity: 51.84
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman 1 24 86.37
Skilled Laborer 2 24 62.66
Laborer 4 24 48.26

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools (10% of Labor)
Delivery Charge

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
Long Span Rib Type GA 26 sq.m 51.84 370.00
Pre-Painted Gutter GA 24 pcs 4.00 168.00
Flashing GA 24 pcs 4.00 168.00
Tex Screw pcs 480.00 2.00
Blind Rivets pcs 120.00 1.50
Roofing Sealant pcs 3.00 385.00
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: 1014 Prepainted Metal Sheet
Unit of Measurement: sq.m.
Quantity: 51.84
Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 72, 2012 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
AILED UNIT PRICE ANALYSIS

Care Center Brgy. Bolbok, Tuy, Batangas 1st LD

Amount

2,072.88
3,007.68
4,632.96

9,713.52

Amount

971.35
15,600.00

16,571.35
26,284.87

Amount

19,180.80
672.00
672.00
960.00
180.00
1,155.00
AILED UNIT PRICE ANALYSIS

Care Center Brgy. Bolbok, Tuy, Batangas 1st LD

22,819.80
49,104.67
5,892.56
4,910.47
2,995.38
62,903.08
1,213.41
DETAILED UNIT PRICE ANALYSIS
Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location Bolbok, Tuy, Batangas
Item No./ Description: 1018(a) Tile Works (Floor Tiles)
Unit of Measurement: sq.m
Quantity: 87.06
Designation No. of Person No. of Hours Hourly Rate
A Labor
a. Construction Foreman 1 50.00 82.84
b. Skilled Laborer 2 50.00 60.05
c. Laborer 2 50.00 46.25

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools

Sub-Total for B
C. Total (A+B)
D.
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
Glazed Tiles sq.m 77.81 350.00
Tile Grout packs 9.00 150.00
Cement bags 10.00 230.00
Sand cu.m 2.00 680.00
Stairs ( Unglazed Tiles) sq.m 8.08 350.00
Landing ( Unglazed Tiles) sq.m 1.18 350.00
Sub-Total for F
G. Direct Item Cost (C+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
DETAILED UNIT PRICE ANALYSIS
Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: 1018(b) Tile Works (CR-Floor & Wall Tiles)
Unit of Measurement: sq.m
Quantity: 28.39
Designation No. of Person No. of Hours Hourly Rate
A Labor
a. Construction Foreman 1 20.00 82.84
b. Skilled Laborer 2 20.00 60.05
c. Laborer 2 20.00 46.25

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools

Sub-Total for B
C. Total (A+B)
D.
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
Unglazed Tiles sq.m 11.66 350.00
Tile Grout packs 3.00 150.00
Cement bags 4.00 230.00
Sand cu.m 1.00 680.00
Glazed Tiles sq.m 16.73 350.00
Sub-Total for F
G. Direct Item Cost (C+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22 S 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
ILED UNIT PRICE ANALYSIS

Amount

4,142.00
6,005.00
4,625.00

14,772.00

Amount

1,477.20

1,477.20
16,249.20

Amount

27,231.75
1,350.00
2,300.00
1,360.00
2,826.25
411.25
35,479.25
51,728.45
6,207.41
5,172.85
3,155.44
66,264.14
761.18
ILED UNIT PRICE ANALYSIS

Amount

1,656.80
2,402.00
1,850.00

5,908.80

Amount

590.88

590.88
6,499.68

Amount

4,081.00
450.00
920.00
680.00
5,855.50
11,986.50
18,486.18
2,218.34
1,848.62
1,127.66
23,680.80
834.12
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: 1032 Painting Works
Unit of Measurement: sq.m
Quantity: 529.47
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman 1 50.00 86.37
Skilled Laborer 2 50.00 62.66
Laborer 3 50.00 48.26

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
Paint Latex Gloss gal. 18.00 514.00
Paint Latex Semi-Gloss gal. 36.00 514.00
Paint Metal Epoxy gal. 5.00 650.00
Lacquer Thinner gal. 3.00 300.00
Masonry Putty gal. 18.00 319.00
Concrete Neutralizer gal. 5.00 528.00
Paint Brush pcs. 6.00 90.00
Roller Brush pcs. 6.00 110.00

Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L. Total Unit Cost (K/Quantity)
AILED UNIT PRICE ANALYSIS

Amount

4,318.50
6,266.00
7,239.00

17,823.50

Amount

1,782.35

1,782.35
19,605.85

Amount

9,252.00
18,504.00
3,250.00
900.00
5,742.00
2,640.00
540.00
660.00

41,488.00
61,093.85
7,331.26
6,109.39
3,726.72
78,261.22
147.81
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: 1100 Electrical Works
Unit of Measurement: l.s
Quantity: 1.00
Designation No. of Person No. of Hours Hourly Rate
A. Labor
a. Construction Foreman 1 70.00 86.37
b. Electrician 1 70.00 62.66
c. Laborer 3 70.00 48.26

Sub-Total for A
N ame and Capacity No. of Units No. of Hours Hourly Rate
B. Equipment
Minor Tools

Sub-Total for B
C. Total (A+B)
D. Output=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials
RSC 25.4mm dia. pc 2.00 726.00
Service Entrance Cap pc 1.00 191.00
Junction Box, 4"x4" G.I. pcs 20.00 31.00
Utility Box, 2"x4" G.I. pcs 20.00 30.00
16mmØ x 2.40m Grounding Rod Copperweld w/ Heavy Duty pcs 2.00 1,500.00
Clamp
2.0mm2 THHN Wire, Stranded m 400.00 20.00
3.5mm2 THW Wire, Stranded m 250.00 23.00
5.5mm2 THW Wire, Stranded m 20.00 36.00
8.0mm2 THW Wire, Stranded m 40.00 80.00
Two Gang Universal/Ground Convenience Outlet sets 8.00 250.00
Single Gang Switch sets 6.00 92.00
Two Gang Switch sets 1.00 126.00
Three Gang Switch sets 1.00 200.00
1 x 40 Flourescent Fixture with Aluminum Reflector and sets 4.00 1,500.00
accessories (Lamps, Ballast, Starter)
18 watts ESL Cool Daylight pcs 7.00 170.00
Ceiling Receptacle, 3 1/2" dia. pcs 7.00 30.00
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD
Location: Bolbok, Tuy, Batangas
Item No./ Description: 1100 Electrical Works
Unit of Measurement: l.s
Quantity: 1.00
Panel Box, Flush Type, 4 Branches (MDP) pc 1.00 1500
Circuit Breaker, 30A, 2P, Bolt Type pcs 1.00 300
Circuit Breaker, 20A, 2P, Bolt Type pcs 1.00 300
Circuit Breaker, 40A, 2P, Bolt Type pc 1.00 650.00
uPVC Pipe, 12.7mm dia. pcs 45.00 69.00
uPvc Pipe, 19mm dia. pcs 50.00 92.00
uPvc Pipe, 25.4mm dia. pcs 4.00 120.00
uPVC Elbow Short Radius, 12.7mm dia. pcs 8.00 18.00
Name and Specification Unit Quantity Unit Cost
F. Materials
uPVC Elbow Long Radius, 12.7mm dia. pcs 10.00 18.00
uPVC Elbow Long Radius, 19mm dia. pcs 15.00 18.00
uPVC Elbow Long Radius, 25.4mm dia. pcs 2.00 18.00
RSC Elbow, 25.4mm dia. pcs 2.00 200.00
uPVC Coupling, 12.7mm dia. pcs 20.00 5.00
uPVC Coupling, 19mm dia. pcs 25.00 8.00
uPVC Coupling, 25.4mm dia. pcs 2.00 34.00
RSC Coupling, 25.4mm dia. pcs 2.00 100.00
#8 masonry drill bit pc 1.00 100.00
#8 tox and screw sets 40.00 1.00
1" U-Metal Clamp pcs 20.00 15.00
Electrical Tape rolls 14.00 50.00
Rubber Tape rolls 2.00 150.00
1/2" Mica Tube m 10.00 45.00
#16 Tie Wire kg 6.00 70.00
#8 Nylon Cable Ties, White packs 6.00 100.00

Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contingencies & Miscellaneous (OCM) per DO 22, 2015 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 5% of (G+H+I)
K. Total Item Cost (G+H+I+J)
K. Total Unit Cost (K/Quantity)
ILED UNIT PRICE ANALYSIS

onstruction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD

Amount

6,045.90
4,386.20
10,134.60

20,566.70
Amount

2,056.67

2,056.67
22,623.37
1.00
22,623.37
Amount

1,452.00
191.00
620.00
600.00

3,000.00

8,000.00
5,750.00
720.00
3,200.00
2,000.00
552.00
126.00
200.00

6,000.00

1,190.00
210.00
ILED UNIT PRICE ANALYSIS

onstruction of Day Care Center Brgy. Bolbok, Tuy, Batangas 1st LD

1,500.00
300.00
300.00
650.00
3,105.00
4,600.00
480.00
144.00
Amount

180.00
270.00
36.00
400.00
100.00
200.00
68.00
200.00
100.00
40.00
300.00
700.00
300.00
450.00
420.00
600.00
-
-

49,254.00
71,877.37
8,625.28
7,187.74
4,384.52
92,074.91
92,074.91
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas I District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Batangas City
PROGRAM OF WORK / BUDGET COST

Project: Construction & Rehabilitation of of MPB Structure (Covered Net Length: (a) Area 15mx28.10m
Court) 421.5 Sq.m
Location: Brgy. Halang, Taal, Batangas Classification: Covered Court
Starting Date:
Estimated Project Cost: 5,000,000.00 Total Project Duration: 90cd
Source of Fund: GAA 2014 Locally- Funded Projects No. of Working Days:
No. of Pre-determined
Limits: unworkable days:

EQUIPMENT
DESCRIPTION OF WORKS TO BE DONE % OF TOTAL
DESCRIPTION REQUIRED

A.1.1 Temporary Facilities Err:509


A.1.2 Progress Photographs Err:509
SPL-1 Project Billboard Err:509
SPL-2 Construction Safety & Health Program Err:509
SPL-3 Mobilization/Demobilization Err:509
SPL-4 Gravel Bedding Err:509
Err:509 Err:509 Err:509
804(a) Backfilling of Excavated Materials Err:509
900 Reinforced Concrete Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
TOTAL Err:509

Construction & Rehabilitation of of MPB Structure (Covered Court)


Brgy. Halang, Taal, Batangas

ESTIMATED COST OF PROJECT


DESCRIPTION QUANTITY UNIT TOTAL

A.1.1 Temporary Facilities 3.00 mos. 45,000.00


A.1.2 Progress Photographs 3.00 mos. 1,950.00
SPL-1 Project Billboard 2.00 ea. 9,839.16
SPL-2 Construction Safety & Health Program 3.00 mos. 9,983.52
SPL-3 Mobilization/Demobilization 3.00 mos. 19,007.87
SPL-4 Gravel Bedding 18.00 cu.m 20,329.48
Err:509 Err:509 Err:509 Err:509 Err:509
804(a) Backfilling of Excavated Materials 118.24 cu.m 3,218.86
900 Reinforced Concrete 118.00 cu.m. 1,001,696.38
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL Err:509
BREAKDOWN OF EXPENDITURES:

1. Labor Err:509 A. Sub-total Err:509


2. Materials Err:509 B. Cost of Engineering, 0%
3. Rental of Equipment Err:509 C. Taxes (VAT, etc.) Err:509
4. Provisional Sum D. ROW Acquisition
5. Direct Cost Err:509 E. Total Estimated Cost Err:509
6. OCM, Profit, QC Err:509
7. Engineering Overhead
8. VAT Err:509
9. ROW Acquisition
10. TOTAL Err:509

Prepared by: Recommending Approval:

VIVIAN VIENNA B. CASTILLO BENCIO A. AGUZAR


Engineer II OIC, Assistant District Engineer

Submitted by: Approved:

FLORENCIA G. CORDOVA JULIANA D. VERGARA


Chief, Planning and Design Section Officer-in-Charge
Republic of the Philippines
Department of Public Works and Highways
Region IV-A
Batangas I District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Batangas City
PROGRAM OF WORK / BUDGET COST

Project: Construction & Rehabilitation of of MPB Structure (Covered Net Length: (a) Area 15mx28.10m
Court) 421.5 Sq.m
Location: Brgy. Halang, Taal, Batangas Classification: Covered Court
Starting Date:
Estimated Project Cost: 5,000,000.00 Total Project Duration: 90cd
Source of Fund: GAA 2014 Locally- Funded Projects No. of Working Days:
No. of Pre-determined
Limits: unworkable days:

EQUIPMENT
DESCRIPTION OF WORKS TO BE DONE % OF TOTAL
DESCRIPTION REQUIRED

A.1.1 Temporary Facilities Err:509


A.1.2 Progress Photographs Err:509
SPL-1 Project Billboard Err:509
SPL-2 Construction Safety & Health Program Err:509
SPL-3 Mobilization/Demobilization Err:509
SPL-4 Gravel Bedding Err:509
Err:509 Err:509 Err:509
804(a) Backfilling of Excavated Materials Err:509
900 Reinforced Concrete Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
TOTAL Err:509
Construction & Rehabilitation of of MPB Structure (Covered Court)
Brgy. Halang, Taal, Batangas

ESTIMATED COST OF PROJECT


DESCRIPTION QUANTITY UNIT TOTAL

A.1.1 Temporary Facilities 3.00 mos. 45,000.00


A.1.2 Progress Photographs 3.00 mos. 1,950.00
SPL-1 Project Billboard 2.00 ea. 9,839.16
SPL-2 Construction Safety & Health Program 3.00 mos. 9,983.52
SPL-3 Mobilization/Demobilization 3.00 mos. 19,007.87
SPL-4 Gravel Bedding 18.00 cu.m 20,329.48
Err:509 Err:509 Err:509 Err:509 Err:509
804(a) Backfilling of Excavated Materials 118.24 cu.m 3,218.86
900 Reinforced Concrete 118.00 cu.m. 1,001,696.38
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL Err:509
BREAKDOWN OF EXPENDITURES:

1. Labor #REF! A. Sub-total Err:509


2. Materials #REF! B. Cost of Engineering, 0%
3. Rental of Equipment #REF! C. Taxes (VAT, etc.) #REF!
4. Provisional Sum D. ROW Acquisition
5. Direct Cost #REF! E. Total Estimated Cost Err:509
6. OCM, Profit, QC #REF!
7. Engineering Overhead
8. VAT #REF!
9. ROW Acquisition
10. TOTAL #REF!

Prepared by: Recommending Approval:

VIVIAN VIENNA B. CASTILLO BENCIO A. AGUZAR


Engineer II OIC, Assistant District Engineer

Submitted by: Approved:

FLORENCIA G. CORDOVA JULIANA D. VERGARA


Chief, Planning and Design Section Officer-in-Charge
ESTIMATED COST OF PROPOSED WORK
Construction & Rehabilitation of of MPB Structure (Covered Court)
Brgy. Halang, Taal, Batangas
Item % of Direct Cost Adjusted
Description Unit Quantity
No. Total Total Cost (P) Unit Cost (P) Unit Cost (P)

SPL-6 Plumbing Works #REF! l.s 1.00 109,650.18 109,650.18 140,461.88


802 Excavation #REF! cu.m 56.00 78,134.00 1,395.25 290.09
900 Reinforced Concrete #REF! cu.m. 118.00 1,001,696.38 8,488.95 10,874.35
1014 Prepainted Metal Sheet #REF! sq.m. 51.84 49,104.67 947.24 1,213.41
SPL 1 CHB Canal w/ Steel Grating Cover #REF! sq.m. 90.72 207,138.44 2,283.27 3,119.86
SPL 2 Steel Works (Roof Framing) #REF! sq.m. 735.00 #REF! #REF! 1,645.14
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SPL-3 Mobilization/Demobilization #REF! mos. 3.00 19,007.87 19,007.87 6,652.75
SPL-2 Construction Safety & Health Program #REF! mos. 3.00 9,983.52 9,983.52 3,843.66
SPL-1 Project Billboard #REF! ea. 2.00 9,839.16 4,919.58 5,682.11
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

TOTAL DIRECT COST #REF! #REF!


APPROVED BUDGET FOR CONTRACT
Construction & Rehabilitation of of MPB Structure (Covered Court)
Brgy. Halang, Taal, Batangas
PROJECT NAME & LOCATION

MARK-UPS
ITEM ESTIMATED TOTAL MARK-UP VAT
DESCRIPTION QUANTITY UNIT (PERCENT)
NO. DIRECT COST
OCM PROFIT % VALUE 12%(5+9)
1 2 3 4 5 6 7 8 9 10

A.1.1 Temporary Facilities 3.00 mos. 45,000.00 12 10 22 9,900.00 6,588.00


A.1.2 Progress Photographs 3.00 mos. 1,950.00 12 10 22 429.00 285.48
SPL-1 Project Billboard 2.00 ea. 9,839.16 12 10 22 2,164.62 1,440.45
SPL-2 Construction Safety & Health Program 3.00 mos. 9,983.52 12 10 22 2,196.37 1,461.59
SPL-3 Mobilization/Demobilization 3.00 mos. 19,007.87 12 10 22 4,181.73 2,782.75
SPL-4 Gravel Bedding 18.00 cu.m #REF! 12 10 22 #REF! #REF!
Err:509 Err:509 Err:509 Err:509 Err:509 12 10 22 Err:509 Err:509
804(a) Backfilling of Excavated Materials 118.24 cu.m 3,218.86 0 0 0 - 386.26
900 Reinforced Concrete 118.00 cu.m. 1,001,696.38 0 10 10 100,169.64 132,223.92
Err:509 Err:509 Err:509 Err:509 Err:509 0 10 10 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 12 10 22 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 12 10 22 Err:509 Err:509

TOTAL COST

PREPARED/SUBMITTED BY : RECOMMENDING APPROVAL :

GODOFREDO C. DE VILLA BENCIO A. AGUZAR


Chief, Construction Section OIC,Assistant District Engineer
Court)

INDIRECT
ITEMCOST UNIT COST
COST
(10)+(9) (11)+(5) (12)/(3)
11 12 13

16,488.00 61,488.00 20,496.00


714.48 2,664.48 888.16
3,605.07 13,444.23 6,722.11
3,657.96 13,641.48 4,547.16
6,964.48 25,972.35 8,657.45
#REF! #REF! #REF!
Err:509 Err:509 Err:509
386.26 3,605.13 3,605.13
232,393.56 1,234,089.94 1,234,089.94
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

#REF!

APPROVED:

JULIANA D. VERGARA
Officer-In-Charge
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction & Rehabilitation of of MPB Structure (Covered Court)


Brgy. Halang, Taal, Batangas
Item No./ Description: SPL 1 CHB Canal w/ Steel Grating Cover
Unit of Measurement: sq.m.
Output per hour:
Quantity: 90.72
Designation No. of Person No. of Hours Hourly Rate Amount
A Labor
Construction Foreman 1 70 74.04 5,182.80
Skilled Laborer 4 70 53.70 15,036.00
Laborer 6 70 41.45 17,409.00

Sub-Total for A 37,627.80

N ame and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment
Minor Tools (5% of Labor) 1,881.39
Welding Machine 1 106.15 45 4,776.75
Oxy-Acetylene 1 350 45 15,750.00

Sub-Total for B 22,408.14


C. Total (A+B) 60,035.94
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost Amount
F. Materials

CHB #4 pc. 1,180.00 10.00 11,800.00


Portland Cement bag 76.00 230.00 17,480.00
Sand cu.m. 7.00 680.00 4,760.00
10mm dia def. bar kg. 255.00 47.00 11,985.00
G.I. Tie wire #16 kg. 5.00 80.00 400.00
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction & Rehabilitation of of MPB Structure (Covered Court)


Brgy. Halang, Taal, Batangas
Item No./ Description: SPL 1 CHB Canal w/ Steel Grating Cover
Unit of Measurement: sq.m.
Output per hour:
Quantity: 90.72
Gravel cu.m. 1.00 850.00 850.00
37.5mm x37.50mmx5mm Angle bar kg. 318.42 50.00 15,921.00
37.50mm x 12.5mm thk. X 6.m Flat bar kg. 1614.03 50.00 80,701.50
Welding rod kg. 20.00 80.00 1,600.00
Epoxy Primer gal. 2 650.00 1,300.00
Paint Thinner gal. 0.5 250.00 125.00
Paint Brush pc. 4 45.00 180.00

Sub-Total for F 147,102.50


G. Direct Unit Cost (E+F) 207,138.44
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 72, 2012 12% of G 24,856.61
I. Contractor's Profit (CP) 10% of G 20,713.84
J. Value Added Tax (VAT) 12% of (G+H+I) 30,325.07
K. Total Item Cost (G+H+I+J) 283,033.96
L Total Unit Cost (K÷Quantity) 3,119.86
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction & Rehabilitation of of MPB Structure (Covered Court)


Brgy. Halang, Taal, Batangas
Item No./ Description: SPL 2 Steel Works (Roof Framing)
Unit of Measurement: sq.m.
Output per hour:
Quantity: 735.00
Designation No. of Person No. of Hours Hourly Rate
A Labor
Construction Foreman 1 250 74.04
Skilled Laborer 4 250 53.70
Laborer 6 250 41.45

Sub-Total for A

N ame and Capacity No. of Units No. of Hours Hourly Rate


B. Equipment
Minor Tools (5% of Labor)
Oxy-Acetylene 1 130 312.5
Welding Machine 2 60 106.25
Boom Crane 2 32 1500

Sub-Total for B
C. Total (A+B)
D. Output per hour=
E. Direct Unit Cost (C÷D)
Name and Specification Unit Quantity Unit Cost
F. Materials

50mm dia. G.I. Pipe pc. 156 1542.00


25mm dia. G.I. Pipe pc. 120 642.00
6mm thk.x87.50mmx87.50mm Angle Bar kg. 99.04 50.00
DETAILED UNIT PRICE ANALYSIS

Project Name: Construction & Rehabilitation of of MPB Structure (Covered Court)


Brgy. Halang, Taal, Batangas
Item No./ Description: SPL 2 Steel Works (Roof Framing)
Unit of Measurement: sq.m.
Output per hour:
Quantity: 735.00
Flat Bar, 75mm widex600mm long x 6mm thk. kg. 42.44 50.00
10mm thick steel plate pc. 1 10,000.00
Welding Rod box 10 1800.00
C-Purlins, 50mmx150mmx1.5mmthk. kg. 1744.2 50
6mm thk. X1.2 x 2.4 Steel Plate pc. 12 6,791.00
16mm dia. Round bar (Cross Bracing) kg. 539.79 47.00
Steel Clamp pcs. 12 500.00
1.05mm x 12 mm dia Sag rod w/ nuts & washer pcs. 85 150.00
Std. Turn Buckle 16mm dia pcs. 50 200.00
Epoxy Primer gal 25 650.00
Paint thinner gal 10 250.00
Paint brush, 2" pcs. 4 55.00

Sub-Total for F
G. Direct Unit Cost (E+F)
H. Overhead, Contengencies & Miscellaneous (OCM) per DO 72, 2012 12% of G
I. Contractor's Profit (CP) 10% of G
J. Value Added Tax (VAT) 12% of (G+H+I)
K. Total Item Cost (G+H+I+J)
L Total Unit Cost (K÷Quantity)
Amount

18,510.00
53,700.00
62,175.00

134,385.00

Amount

6,719.25
40,625.00
12,750.00
96,000.00

156,094.25
290,479.25

Amount

240,552.00
77,040.00
4,952.00
2,122.00
10,000.00
18,000.00
87,210.00
81,492.00
25,370.13
6,000.00
12,750.00
10,000.00
16,250.00
2,500.00
220.00

594,458.13
884,937.38
106,192.49
88,493.74
129,554.83
1,209,178.44
1,645.14

S-ar putea să vă placă și