Documente Academic
Documente Profesional
Documente Cultură
1. SAFETY.
-. Apply safety Iron Rule (use PPE).
-. Do not working without check the Panel condition first (such as voltage source at panel) and put on
safety tag at panel door (ILS).
-. Always do finger point before and after working.
2. TBM.
-. Place infront of Main Electrical Room SteelMaking Plant, time: 07:45 AM.
-. Tools preparation check (if not ready, prohibited to work).
-. Work permit published and distribute to workers (for High risk Job).
○ Quality requirements
4. After working.
-. Safety check arround area.
-. Cleaning arround area.
6. Material
-. Greeting, mesin las , gerinda dll
-.
7. Request worker
○ Core tasks
1. SAFETY.
-. Do not working without check the Panel condition first (such as voltage source at panel) and put on
safety tag at panel door (ILS).
-. Always do finger point before and after working.
2. TBM.
-. Place infront of Main Electrical Room SteelMaking Plant, time: 07:45 AM.
-. Work permit published and distribute to workers (for High risk Job).
○ Quality requirements
4. After working.
_oa_dis
Note : SAFETY FIRST
○ Core tasks
PIC Ary Wahyudi 081293564353
Vicky Immanuel
1. SAFETY.
-. Apply safety Iron Rule (use PPE).
-. Do not working without check the Panel condition first (such as voltage source at panel) and put on
safety tag at panel door (ILS).
-. Always do finger point before and after working.
2. TBM.
-. Place infront of Main Electrical Room SteelMaking Plant, time: 07:45 AM.
-. Tools preparation check (if not ready, prohibited to work), tool set.
-. Work permit published and distribute to workers (for High risk Job).
○ Quality requirements
4. After working.
-. Safety check arround area.
-. Cleaning arround area.
1. SAFETY.
-. Apply safety Iron Rule (use PPE).
-. Do not working without check the Panel condition first (such as voltage source at panel) and put on
safety tag at panel door (ILS).
-. Always do finger point before and after working.
2. TBM.
-. Place infront of Main Electrical Room SteelMaking Plant, time: 07:45 AM.
-. Tools preparation check (if not ready, prohibited to work), tool set.
-. Work permit published and distribute to workers (for High risk Job).
6. MATERIAL
- PANEL.
- PIPE CONDUIT AND FLEXIBLE 32mm
- U BALL.
- ANGLE.
○ Quality requirements
7. After working.
-. Safety check arround area.
-. Cleaning arround area.
o Safety Action and Condition (Emergency Call: Safety Master each plant)
1. Apply Safety Iron Rule (Use PPE, Body harness, etc)
2. Do not working without check the Panel condition first
(Such as Voltage source at panel) and Put on safety tag at panel door (ILS)
3. Always do Finger Point before and after working
Contact Person
PTKP : Saut Daniel 081221007834
M. Riswan Maulana 082122498499
ICT : Tri Nova 087871711697
o Safety Action and Condition (Emergency Call: Safety Master each plant)
1. Apply Safety Iron Rule (Use PPE, Body harness, etc)
2. Do not working without check the Panel condition first
(Such as Voltage source at panel) and Put on safety tag at panel door (ILS)
3. Always do Finger Point before and after working
○ Core tasks
3.After Working
3.1 Safety check arround area
3.2 Cleaning arround area
○ Quality requirements
Makesure all of condition motor already good
SAFETY FIRST!!!
_oa_dis