Calculation:
Calculate Total Wattage of Fixtures:
Total Wattage of Fixtures= No of Lamps X each Lamp’s Watt.
Total Wattage of Fixtures=2×32=64Watt.
Calculate Lumen per Fixtures:
Lumen per Fixtures = Lumen Efficiency(Lumen per Watt) x each Fixture’s Watt
Lumen per Fixtures= 85 x 64 = 5440Lumen
Calculate No’s of Fixtures:
Required No of Fixtures = Required Lux x Room Area / MFxUFx Lumen per Fixture
Required No of Fixtures =(250x20x10) / (0.63×0.69×5440)
Required No of Fixtures =21 No’s
Calculate Minimum Spacing Between each Fixture:
The ceiling to desk height is 2 meters and Space height Ratio is 1.25 so
Maximum spacing between Fixtures =2×1.25=2.25meter.
Calculate No of Row Fixture’s Row Required along with width of Room:
Number of Row required = width of Room / Max. Spacing= 10/2.25
Number of Row required=4.
Calculate No of Fixture’s required in each Row:
Number of Fixture Required in each Row = Total Fixtures / No of Row = 21/4
Number of Fixture Required in each Row = 5 No’s:
Calculate Axial Spacing between each Fixture:
Axial Spacing between Fixtures = Length of Room / Number of Fixture in each Row
Axial Spacing between Fixtures =20 / 5 = 4 Meter
Calculate Transverse Spacing between each Fixture:
Transverse Spacing between Fixtures = width of Room / Number of Fixture’s row
Transverse Spacing between Fixtures = 10 / 4 = 2.5 Meter.
Conclusion:
No of Row for Lighting Fixture’s= 4 No
No of Lighting Fixtures in each Row= 5 No
Axial Spacing between Fixtures= 4.0 Meter
Transverse Spacing between Fixtures= 2.5 Meter
Required No of Fixtures =21 No’s
Reply
Can u please refer me the book where i can completely know about lighting design both indoor and outdoor, kindly
Dear Sir
I need one clarification from you …..Here i am giving Factory size in mt(35M width *110Mtr Length)and Our required
lux level (300Lux).light requirements for 1*400W metal halide fitting.Our buliding ht is 14.0Mtr.Cealing type made by
Sheet. How many fittings required.Then how to calculate detailed formula required sir.
Reply