Clause Sub-Clause Heading

1 1.1 a i Definitions
1 1.1 a iv Definitions
1 1.1 a v Definitions
1 1.1 b ii Definitions
1 1.1 b vii Definitions
1 1.1 c i Definitions
1 1.1 c ii Definitions
1 1.1 d ii Definitions
1 1.1 e i Definitions
1 1.1 e ii Definitions
2 2.1 b Engineer's Duties and Authority
2 2.2 Engineer's Representative
2 2.4 Appointment of Assistants
2 2.5 Instruction in Writing
2 2.5 Instruction in Writing
2 2.6 Engineer's to Act Impartially
3 3.1 Assignment of Contract
6 6.1 Custody and Supply of Drawings and Documents
6 6.1 Custody and Supply of Drawings and Documents
6 6.3 Disruption of Progress
6 6.4 Delays and Cost of Delay of Drawings
6 6.5 Failure by Contractor to Submit Drawings
7 7.2 Permanent Works Designed by Contractor
7 7.3 Responsibility Unaffected by Approval
10 10.1 Performance Security
10 10.2 Period of Validity of Performance Security
10 10.2 Period of Validity of Performance Security
12 12.2 Adverse Physical Obstruction or Conditions
13 13.1 Work to be in Accordance with Contract
14 14.2 Revised Programme
15 15.1 Contractor's Superintendence
17 17.1 Setting-out
18 18.1 Boreholes and Exploratory Excavation
19 19.2 Employer's Responsibility
20 20.1 Care of Works
20 20.2 Responsibility to Rectify Loss or Damage
20 20.3 Loss or Damage Due to Employer's Risk
21 21.1 Insurance of Works and Contractor's Equipment
21 21.2 Scope of Cover
21 21.3 Responsibility for Amounts not Recovered
21 21.4 Exclusions
22 22.1 Damage to Persons and Property
22 22.2 Exceptions
22 22.3 Indemnity by Employer
23 23.1 Third Party Insurance(including Employer's Property)
25 25.1 Time to provide insurance policies
25 25.3 Remedy on Contractor's Failure to Insure
26 26.1 Compliance with Statutes, Regulations
27 27.1 Fossils
30 30.3 Transport of Materials or Plant
31 31.2 Facilities for Other Contractors
36 36.4 Cost of Test not Provided for
36 36.5 Engineer's Determination where Tests not Provided for
37 37.3 Dates for Inspection and Testing
37 37.4 Rejection
37 37.5 Independent Inspection
38 38.2 Uncovering and making Openings
40 40.1 Suspension of Work
40 40.2 Engineer's Determination following Suspension
40 40.3 Suspension Lasting more than 84 days
40 40.3 Suspension Lasting more than 84 days
42 42.1 Possession of Site and Access Thereto
42 42.2 Failure to Give Possession
43 43.1 Time for Completion
44 44.2 Contractor to Provide Notification and Detailed Particulars
44 44.2 Contractor to Provide Notification and Detailed Particulars
44 44.3 Interim Determination of Extension
44 44.3 Interim Determination of Extension
47 47.1 Liquidated Damages for Delay
48 48.1 Taking-Over Certificate
48 48.1 Taking-Over Certificate
48 48.1 Taking-Over Certificate
48 48.1 Taking-Over Certificate
48 48.2 Taking Over of Sections or Parts
49 49.1 Defects Liability Period
49 49.2 Completion of Outstanding Work and Remedying Defects
49 49.3 Cost of Remedying Defects
50 50.1 Contractor to Search
51 51.1 Variation
52 52.1 Valuation of Variations
52 52.2 Power of Engineer to Fix Rates
52 52.3 Variations Exceeding 15 per cent
53 53.1 Notice of Claims
53 53.2 Contemporary Records
53 53.3 Substantiation of Claims
53 53.3 Substantiation of Claims
53 53.4 Failure to Comply
53 53.5 Payment of Claims
54 54.2 Employer not Liable for Damage
54 54.5 Conditions of Hire of Contractor's Equipment
54 54.6 Costs for the Purpose of Clause 63
56 56.1 Works to be Measured
56 56.1 Works to be Measured
57 57.2 Breakdown of Lump Sum Items
58 58.2 Use of Provisional Sums
59 59.4 Payments to Nominated Subcontractors
59 59.5 Certification of Payments to Nominated Subcontractors
60 60.1 Monthly Statements
60 60.2 Monthly Payments
60 60.3 Payment of Retention Money
60 60.5 Statement at Completion
60 60.6 Final Statement
60 60.7 Discharge
60 60.8 Final Payment Certificate
60 60.9 Cessation of Employer's Liability
60 60.10 Time for Payment
61 61.1 Approval only by Defects Liability Certificate
62 62.1 Defect Liability Certificate
63 63.1 Default of Contractor
63 63.1 Default of Contractor
63 63.1 Default of Contractor
63 63.4 Assignment of Benefit of Agreement
65 65.1 No Liability for Special Risk
65 65.2 Special Risks
65 65.3 Damage to Works by Special risk
65 65.5 Increased Costs arising from Special Risk
65 65.6 Outbreak of War
65 65.7 Removal of Contractor's Equipment on Termination
65 65.8 Payment if Contract Terminated
66 66.1 Payment in Event of Release from Performance
67 67.1 Engineer's Decision
67 67.1 Engineer's Decision
67 67.2 Amicable Settlement
67 67.3 Arbitration
67 67.4 Failure to Comply with Engineer's Decision
69 69.1 Default of Employer
69 69.1 Default of Employer
69 69.2 Removal of Contractor's Equipment
69 69.3 Payment on Termination
69 69.4 Contractor's Entitlement to Suspend Work
69 69.4 Contractor's Entitlement to Suspend Work
69 69.5 Resumption of Work
70 70.2 Subsequent Legilation
71 71.1 Currency Restrictions
72 72.3 Currencies of Payment for Provisional Sums
Unit of Relation Other
Data Value
Value to other data
Employer
Engineer
Engineer's Representative
Specification
Contract Agreement
Commencement Date
Time for Completion
Taking-Over Certificate
Contract Price
Retention Money
Engineer's Duties and Authority
Engineer's Authority to Delegate
Appointment of Assistants
Confirmation of oral Instruction by the Contractor within 7 days
Engineer's Response time to the confirmation. 7 days
Engineer's to Act Impartially
Assignment of Contract
No. of copies to be supplied by the Contractor 4
No. of copies to be supplied by the Engineer 2

Taking-Over Certificate

Time for providing Performance Security 28 days within LOA


Valid until the contractor has executed and completed the works and remedied any defects
Return of Performance Security 14 days within DLC
Notice given by the Contractor
Instruction to be taken from the Engineer/Engineer's Representative

Care of works for only outstanding works during the DLP

Additional sum to cover any additional cost 15% of replacement cost

t Recovered

g Employer's Property)
84 days within NTC

re Tests not Provided for


Notice by the Engineer of his Intention to Inspection 24 Hours before test

Notice of Appointment 14 days before test


Cost added to contract Price

wing Suspension
Time for Permission by the Engineer to resume work 84 days within Instruction to Suspend und
Default by the Employer if suspension effect the whole of the Works 28 days from Notice Requiring Permissio

Contractor Notification for Extension of time 28 days within Delay event has first arisen
Detailed Particulars to Submit 28 days within Contractor Notification for
Interim Particulars to submit 28 days interval Event has continuing effec
Final Particulars 28 days within the end of the effects resu

Issuance of Taking-Over Certificate 21 days within Contractor notice to issue


Issuance of Taking-Over Certificate 21 days within Completion of specified w
Date of Issuance of Taking-Over Certificate 2-Apr-18
Date of Substantial Completion of the Works as stated in Taking-Over
2-Apr-18
Certificate issued by the Engineer

Expiry of DLP 12 months within Date of Substantial Compl


Period to complete the outstanding work if the Engineer instruct the Contractor
14 days before after
expiration of
Expiry
DLP of DLP

u
u

Notice for intention to claim extra payment 14 days within Instruction given under Su

Intention to Claim 28 days within After the event giving rise

Detailed Particulars to Submit 28 days within Contractor Notice to claim


Final Particulars 28 days within the end of the effects resu

or's Equipment

Time to examine records prepared by the Engineer 14 days within When called upon by the E
Time for the Contractor's Notice to Disagree the records and drawings. 14 days within Examination of the record
Time to submit breakdown of lump sum items 28 days within LOA

ominated Subcontractors

Time to Deliver IPC to the Employer 28 days within Receiving of monthly state

84 days not later than


TOC
Time for Submission of Draft Final Statement 56 days not later than
DLC

Certification time 28 days within after receipt of Final State

Payment By Employer of IPC 28 days within IPC Delivered to the Emplo


ity Certificate
Time to issue DLC 28 days within DLP
Unable To proceed with the Works 28 days within after Receiving notice purs
Failed to comply an instruction 28 days within after Receiving instruction
Termination of Contractor's Employment 14 days after Giving Notice to the Contr

ment on Termination

om Performance
Engineer's Decision 84 days not later than
After the day on which he
Notice of intention to commence arbitration 70 days on or beforeExpiry of 84 days or after t
Arbitration may be commenced 56 days on or after after the notice of intentio
Under the Rules of Conciliation and Arbitration of the International Chamber of Commerce
er's Decision
Contractor Entitlement to terminate his employment 28 days after Expiry of the time stated in
Termination take effect 14 days after giving notice of terminatio
Removal of Contractor's Equipment 14 days upon expirygiving
of notice of terminatio

Time for Contractor's Notice to Suspend Work 28 days after Expiry of the time stated in
Time to Suspend work 28 days after giving notice to suspend w

Changes to any National or State Legislation causes additional or reduced28cost


days
to the Contractor
prior to the latest date for subm
Government impose currency restriction 28 days prior to the latest date for subm
visional Sums
Reference to Head of
Information Sub head
Superseded by Supplement by Record
coc II
coc II
2.2
51
9.1
41
44
48
LOA
60.2 a
coc II
2.3
2.2
2.4
2.4
67
1.5
7
7
Notice By the Contractor
6.3,44
6.4
48
7.2
12-May-03 Date and time

Date and time


Notice By the Contractor
2
14.1
2
52
51
31
49
20.4,49,50
20.4,52
20
21.1,21.4,49,50
20
21.1
22.2
22.1
22.2
22,24
8-Jul-03
25.1
22.3
44
30.1
31.1,52
36.5
36.4,44

37.3
2.4
38.1 Additional cost
20.4,40.2
40.1,44
Instruction to Suspend under Sub-Clause 40.1
40.1,51,69.1,69.2,69.3
Notice Requiring Permission by the Contractor
40.1,51,69.1,69.2,69.3
14
42.1,44
48,44
Delay event has first arisen
Contractor Notification for Extension of time or as agreed by the Engineer
Event has continuing effect 44.2(b)
the end of the effects resulting from the event
43,48
Contractor notice to issue TOC
Completion of specified work to the satisfaction of the Engineer

48.1
48.1
#NAME? 48
#NAME?
49.2,52
49 Additional cost
52
51,60
Instruction given under Sub-Clause 51.1 60,51,52.1
52.1,52.2,70
After the event giving rise to the claim has first arisen.
53.1
Contractor Notice to claim or as agreed by the Engineer 53.1
the end of the effects resulting from the event
53.2,53.3,67.3
60
20,65
63
54.5,63
When called upon by the Engineer in writing 60
Examination of the records by the contractor with the Engineer
12-May-03 60.1
52,59.4
52,58.2
60
15.1,70
Receiving of monthly statement 47,60.1
48,49,50
25-Jun-18 60.2
#NAME? 62.1,67
60.8,10.1
after receipt of Final Statement and written Discharge47
60.5
IPC Delivered to the Employer 47,60.8,69
62
#NAME? 49,50,60.3
after Receiving notice pursuant to clause 3.1,41.1,46.1,37.4,39.1,4.1
46.1
after Receiving instruction pursuant to clause
3.1,41.1,46.1,37.4,39.1,4.1
39.1
Giving Notice to the Contractor
63.1
65.2,39
20.4
52
39
67
65.6
65.3,65.5,65.7
65,67
After the day on which he received the Reference made 67.4under this clause
Expiry of 84 days or after the day of recipt of the Engineer's
67.4 Decision
after the notice of intention to commence arbitration 67.1
67.1,67.2
67.1,67.2,67.3
Expiry of the time stated in 60.10 60.10
giving notice of termination by the Contractor
60.10
giving notice of termination by the Contractor
69.1,54.1
65,65.8
Expiry of the time stated in 60.10 69.1,60.10,44
giving notice to suspend work. 69.1,60.10,44
69.4,60.10,69.1
to the latest date for submission of tenders 70.1
to the latest date for submission of tenders 70.1
72.1,72.2,58,59