Sunteți pe pagina 1din 3

JV Shop Drawing VS WP Major Submission:

ALYSJ / DD2 WP MAJOR SUBMISSION DISCREPANCY REMARKS


Roof Level

DRN SHEET 2 - EMR & FIRE


DEPARTMENT RD-3 AND RWP TO BE ADDED
CONNECTION ADDITIONAL RD-3 DROP AND CONFIRMED BY WP.
TO AG.

RD-3 TO BE ADDED AND


DRN SHEET 3 - PROVISION OF RD-3. CONFIRMED BY WP.

DRN SHEET 4 - ADDITIONAL RD-3 FOR RD-3 AND RWP TO BE ADDED


MEP RISER ROOF DROP TO VRV (0.190) AND CONFIRMED BY WP.
AND PROVISION OF RD-3 IN VRV AREA.

DRN ENTRANCE 2 - WP PIPE SIZE FROM TO UPDATE WP UTILITY


DD2 DIFFERS FORM UTILITY DRWING. DRAWING.

HOW ABOUT THE ROOF LEVEL


FRS SHEET 1 - ADDITIONAL SHEET FOR AT GRID 4 TO 6? JV PROVIDED
ROOF LEVEL. EXTINGUISHER AS SHOWN

At Grade Level

DRN SHEET 2 - ADDITIONAL RWP TO UPDATE WP UTILITY


FROM EMR ROOF CONNECTED TO DRAWING AND SHOP
SWMH - 10. DRAWING.

DRN SHEET 2 - MANHOLE VENT PIPES TO UPDATE WP UTILITY


RE-ROUTED AND CLUBED FOR DRAWING AND SHOP
COORDINATION PURPOSES. (SHEET 2) DRAWING AS PER JV CSD.

DRN SHEET 3 - MANHOLE VENT PIPES


RE-ROUTED AND CLUBED FOR TO UPDATE WP UTILITY
COORDINATION PURPOSES. (SHEET 3 / DRAWING AND SHOP
DRAWING AS PER JV CSD.
ENTRANCE 01)
NOT POSSBLE. ALL SERVICES
DRN SHEET 3 - DRAINAGE STRATEGY HAD BEEN COORDINATED
AND INSTALLED ON SITE.
FOR UPS CORRIDOR TO RUN BELOW AT CORE CUTT IS ALSO
PLATFORM HIGH LEVEL. IMPOSIBBLE ATHE CURRENT
STAGE.

NOT POSSBLE. ALL SERVICES


DRN ENTRANCE SHEET 1 - ADDITIONAL HAD BEEN COORDINATED
CONDENSATE PIPE DROP TO BELOW AND INSTALLED ON SITE.
LEVEL (CONCOURSE & SUBWAY). Ø50 CORE CUTT IS ALSO
CD PUMPED REMOVED. IMPOSIBBLE ATHE CURRENT
STAGE.

FRS AG SHEET 1 & 4 - UPRIGHT


SPRINKLER TO BE REMOVE AT TO BE CONFIRMED BY WP.
PRESSURIZE LIFT LOBBIES. NO OTHER
SERVICES IN THE LOBBY.

Concourse Level

FD LOCATIONS ARE
DRN FOR ALL SHEETS - FLOOR DRAIN COORDINATED WITH THE
TYPE AND LOCATION CHANGED AS PER ARCHITECTURAL TEAM. TO
AS-BUILT LOCATION AND DISCUSSIONS
WITH ARCHITECTURAL AND FOLLOW JV WALL AND
COORDINATION. SCREED EMBEDDED
DRAWINGS.

DRAINAGE FOR ALL MECHANICAL EXISTING PIPE DROPING


ROOMS - FCU CONDENSATE DROP TO DIRECTLY TO THE PLENUM,
FD WITH FUNNEL AND SCREED AND TO BE CAP OFF. TO
EMBEDDED PIPE RE-ROUTED DUE TO FOLLOW JV WALL AND
SCREED EMBEDDED
COORDINATION. DRAWINGS.

PIPE SIZE AND ROUTING WAS


CONDENSATE FOR ALL SHEETS - CHANGE AND AGREED BY WP
CONDENSATE PUMPED PIPE SIZES IS FOR 3 CD PUMPED
DIFFERENT. CONNECTION. 1-CD-Ø25, 2-
CD-Ø32, AND 3-CD-Ø50.

CD SHEET 1 & 4 - SCADA 1 & 2, FCU &


PEU DIFFERS FROM OUR SHOP
DRAWING. (2 PEU & 2 FCU TO 2 PEU 1 TO BE CONFIRMED BY WP
CRAC FOR SCADA 2 AND 1 PEU & 1
FCU FOR SCDA 1)

CD SHEET 2 - CD FROM CORRIDOR TO


DROP THROUGH STAFF MALE D/A
TOILET AND CONNETED TO EWH
DRAIN PIPE Ø28.

NO ARCHITECTURE RCP, PENDANT DD2 TO BE UPDATED.


SPRINKLERS WHERE REMOVED.
FRS SHEET 2 - ADDITIONAL TEST AND
DRAIN TO NEAREST FD FOR RETAIL JV SHOP DRAWING UPDATED.
AREA 1 & 2.

FRS SHEET 2 - ADDITIONAL SPRINKLER


FOR STATION CONTROL ROOM DUE TO JV SHOP DRAWING UPDATED.
DOUBLE SLAB.

FRS ALL SHEET - HT TAG FOR HIGH JV SHOP DRAWING TO BE


TEMPERATURE SPRINKLER HEAD UPDATED.
ADDED.

FRS SHEET 2 - PENDANT SPRINKLER JV REMOVED PENDANT


PROVIDED IN DD2. CEILING REMOVED SPRINKLER. GSS TO BE
BY ARCHITECTURE AND GSS ROOM
CHANGE TO FIRE SPRINKLER REMOVED AND PROVIDE
PROTECTION. SPRINKLER.

TRENCH DRAIN WITH FD-5


DRN SHEET 2 - CATCH PIT AND SUMP FOR ALTERNATIVE DRAINAGE
PIT REMOVAL AS PER FCR-00078. STRATEGY.

DRN SHEET 3 - GARBAGE & CLEANER'S TO FOLLOW AS PER AS-BUILT


ROOM WASTEPIPE LOCATION. LOCATION.

FRS CL SHEET 1 - UPRIGHT SPRINKLER


TO BE REMOVE AT PRESSURIZE LIFT
LOBBIES. NO OTHER SERVICES IN THE TO BE CONFIRMED BY WP.
LOBBY. SHEET 4 - NO SPRINKLER
PROVIDED AT LIFT LOBBY.

PLATFORM LEVEL

WS SHEET 1 - PIPE LAYOUT FOR DC/TPS JV PIPE ROUTE AT


ROOM ROUTE AT UNDER PLATFORM. UNDERPLATFORM.