Timeline of General Campus Capital Construction Projects

Dates subject to change (3/26/2018) Building
Housing
Parking
Other

Nuevo East (4/18) Design & Innovation (9/19)
NTPLLN & Housing  Franklin Antonio Hall (10/19)
Beginning of & Parking (6/18) Triton Pavilion (4/20)
Construction Voigt Parking (9/18)
Fire Station (6/22)
2018 2019 2020 2021 2022

Tata Hall (9/18) NTPLLN Academic & 
Completion of Voigt 850 Parking (9/19) Triton Pavilion (6/22)
Osler 1,300 Parking (8/18) 1,200 Parking (12/20)
Franklin Antonio Hall (11/21)
Construction Gilman Bridge (2/19)
NTPLLN Housing (8/20)
Nuevo East (4/20) Light Rail opening (10/21)
Pedestrian/Bike Bridge 
Nuevo West (1/20) Design & Innovation (4/21)
& Mesa Housing (2/19)

Summer 2019 Summer 2020
Upcoming Activity
Ridge Walk Improvements Ridge Walk Improvements
Fire Station (done 1/24)
1. NTPLLN
2. Tata Hall
3. Voigt parking & Osler 
parking
4. Franklin Antonio Hall
5. Design & Innovation
6. Rupertus Way
7. Triton Pavilion
8. Gilman bridge
13
9. Light Rail Transit
10. Outpatient pavilion
11. Pedestrian bridge
12. Graduate Housing
13. Ridge Walk Improvements