Sunteți pe pagina 1din 1

THE WEST BENGAL POWER DEVELOPMENT CORPORATION

SAGARDIGHI THERMAL POWER PROJECT


CCR ELECTRICAL CONTROL ENGINEER LOG

SHIFT A B C DATE
EMS CMS UNIT & PLANT AUXILIARY
STG 1 TOTAL
GEN AUX UNIT
UNIT INITIA GEN STG 1
FINAL FINAL (MWH) UAT INITIAL FINAL (MWH AUX
L (MWH) AUX
) (MWH)
(MWH)

1A

#1
1B

2A

#2

2B

PARA UNIT 1 UNIT 2 OIL WDG OIL WDG


METER FREQ UAT TAP
P Q P Q TEMP TEMP TEMP TEMP
MAX
VALUE
1A GT1

TIME 1B GT2

MIN
VALUE
2A ESP STATUS

TIME 2B U#1 U#2

DEVIATION FIELD
Unit1 Unit2 AG/SG BLOCK #
CAUSE OFF
FIELD
GEN TERMINAL VOLTAGE
Alarm
< 98%
Hopper
ARMATURE CURRENT
Level

EXCITATION CURRENT DG STATUS


> 102%
GEN HOT GAS TEMP DG1 DG2

GEN COLD GAS TEMP U#1 U#2 MAIN


AHU
STAND
STATOR BAR TEMP (In
Service)
BY
AVR MODE
STATOR CORE TEMP Normal  High 
TEMP (A/M)
AIR 1 2 3 4 5 6 7 8 9 10 11 12 1A 1B 1C 2A 2B 2C
WASHERY
( A / NA /
R)

____________
CE SIGNATURE

S-ar putea să vă placă și