Sunteți pe pagina 1din 9

Job Number Sheet

FIRST FLOOR BEAMS DESIGN


Job Title
150X400 FFBM02
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com PRISCILLAR WAMBUI THEURI
Calcs by Checked by Date
E-Mail : mail@prokon.com ST OCT/2015
Continuous Beam: ----------------- ---- --------- (Code of Practice : BS8110 - 1997)
10/29/2015 9:37:19 AM C01

Input Tables
Fcu (MPa) 20
Fy (MPa) 415
Fyv (MPa) 415
% Redistribution 10
Downward/Optimized redistr. D
Cover to centre top steel(mm) 30
Cover to centre bot.steel(mm) 30
Dead Load Factor 1.4
Live Load Factor 1.6
Density of concrete (kN/m3) 24
% Live load permanent 25
Ø (Creep coefficient) 2
Ecs (Free shrinkage strain) 300E-6

Sec Bw D Bf-top Hf-top Bf-bot Hf-bot Y-offset Web Flange


No. (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset

1 400 150

Span Section Sec No Sec No


No Length(m) Left Right

1 3.75 1

Sup Code Column Below Code Column above Code


No. C,F F,P F,P
D(mm) B(mm) H(m) D(mm) B(mm) H(m)

Case Span Wleft Wright a b P a M a


D,L (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m)

D 1 25
L 1 6

Span M left M right


(kNm) (kNm)
Job Number Sheet
FIRST FLOOR BEAMS DESIGN
Job Title
150X400 FFBM02
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com PRISCILLAR WAMBUI THEURI
Calcs by Checked by Date
E-Mail : mail@prokon.com ST OCT/2015

Sections
400

150
SECTION 1

Beam Elevation
1 SPAN 1 2

Live
6.00

Dead+
26.44
Own W

3.750
Job Number Sheet
FIRST FLOOR BEAMS DESIGN
Job Title
150X400 FFBM02
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com PRISCILLAR WAMBUI THEURI
Calcs by Checked by Date
E-Mail : mail@prokon.com ST OCT/2015

Deflection, Shear, Moment and Steel diagrams. Span 1


Elastic Deflections (Alternate spans loaded) Def max = 30.94mm @ 1.88m
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
5.00

10.0

15.0
 
20.0

25.0

30.0

Long-term Deflections (All spans loaded - using required reinforcement) Def max = 43.32mm @ 1.88m
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
10.0

20.0
 

30.0

40.0

SHEAR: X-X V max = -87.41kN @ 3.75m


80.0
60.0
40.0
20.0
 
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
-20.0
-40.0
-60.0
-80.0

MOMENTS: X-X M max = 81.94kNm @ 1.88m


.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
20.0

40.0
 

60.0

80.0

Shear Steel: X-X Asv max = .7239mm²/mm @ .250m


.700
.600
.500
.400
 
.300
.200
.100
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

Bending Steel: X-X As max = 2505 mm2 @ 1.88m


-2000

-1000

 
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

1000

2000
Job Number Sheet
FIRST FLOOR BEAMS DESIGN
Job Title
150X400 FFBM02
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com PRISCILLAR WAMBUI THEURI
Calcs by Checked by Date
E-Mail : mail@prokon.com ST OCT/2015

=====================================================================
C O N T I N U O U S B E A M Ver W2.5.08 - 11 Mar 2011

Title : ----------------- ---- ---------


Data File : D:\MY OTHER DOCUMENTS\PROJECTS 2015\PRISCILLAR WAMBUI THEURI\CALCS\WORD\150X400 FFBM0
Date/Time : 10/29/2015
Code of Practice : BS8110 - 1997
=====================================================================

BENDING MOMENTS & REINFORCEMENT

SPAN 1

Position(m) Min.Moment(kNm) Max.Moment(kNm) As-top(mm2) As-bot(mm2)

0.000 0.00 0.00 0.00 0.00


0.250 11.57 20.39 80.59 610.21
0.500 21.48 37.88 635.54 1148.45
0.750 29.75 52.44 1098.00 1596.98
1.000 36.36 64.10 1467.97 1955.80
1.250 41.31 72.84 1745.44 2224.92
1.500 44.62 78.66 1930.43 2404.33
1.750 46.27 81.58 2022.92 2494.04
1.875 46.48 81.94 2034.48 2505.25
2.125 45.65 80.49 1988.24 2460.40
2.375 43.17 76.12 1849.50 2325.84
2.625 39.04 68.83 1618.27 2101.57
2.875 33.26 58.63 1294.55 1787.60
3.125 25.82 45.52 878.33 1383.92
3.375 16.73 29.50 369.63 890.54
3.625 5.99 10.56 0.00 276.13
3.750 0.00 0.00 0.00 0.00

---------------------------------------------------------------------

SHEAR FORCES & REINFORCEMENT

SPAN 1

Position(m) Minimum Maximum Shear Asv/Sv Asv/Sv(nom)


Shear(kN) Shear(kN) Capacity(kN) (mm2/mm) (mm2/mm)

0.000 49.58 87.41 171.73 0.00 0.44


0.250 42.97 75.75 44.40 0.72 0.44
0.500 36.36 64.10 54.82 0.21 0.44
0.750 29.75 52.44 59.12 0.00 0.44
1.000 23.14 40.79 59.12 0.00 0.44
1.250 16.52 29.13 59.12 0.00 0.44
1.500 9.91 17.48 59.12 0.00 0.44
1.750 3.30 5.83 59.12 0.00 0.44
1.875 -0.00 -0.00 59.12 0.00 0.44
2.125 -11.65 -6.61 59.12 0.00 0.44
2.375 -23.31 -13.22 59.12 0.00 0.44
2.625 -34.96 -19.83 59.12 0.00 0.44
2.875 -46.62 -26.44 59.12 0.00 0.44
3.125 -58.27 -33.05 58.34 0.00 0.44
3.375 -69.92 -39.66 50.37 0.45 0.44
3.625 -81.58 -46.27 65.45 0.37 0.44
3.750 -87.41 -49.58 171.73 0.00 0.44

---------------------------------------------------------------------
Job Number Sheet
FIRST FLOOR BEAMS DESIGN
Job Title
150X400 FFBM02
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com PRISCILLAR WAMBUI THEURI
Calcs by Checked by Date
E-Mail : mail@prokon.com ST OCT/2015

COLUMN REACTIONS

Support Dead Load(kN) Live Load(kN) Dead + Live(kN) Ultimate(kN)

1 49.58 11.25 60.83 87.41


2 49.58 11.25 60.83 87.41

---------------------------------------------------------------------

COLUMN MOMENTS (Ultimate limit state)

Columns below

Support Bending Moment(kNm) Shear Force (kN)


No. Min. Max. Min. Max.

1 0.00 0.00 0.00 0.00


2 0.00 0.00 0.00 0.00

Columns above

Support Bending Moment(kNm) Shear Force (kN)


No. Min. Max. Min. Max.

1 0.00 0.00 0.00 0.00


2 0.00 0.00 0.00 0.00

---------------------------------------------------------------------

ELASTIC DEFLECTIONS (Alternate spans loaded - positive downward)

Modulus of elasticity: Ec = 20 + fcu/5 = 24.0 Gpa

SPAN 1

Position(m) Min.Deflection(mm) Max.Deflection(mm)

0.000 -0.00 -0.00


0.250 5.27 6.46
0.500 10.21 12.52
0.750 14.68 18.02
1.000 18.55 22.76
1.250 21.67 26.58
1.500 23.88 29.30
1.750 25.06 30.75
1.875 25.22 30.94
1.875 25.22 30.94
2.125 24.61 30.20
2.375 22.90 28.09
2.625 20.21 24.80
2.875 16.71 20.50
3.125 12.52 15.36
3.375 7.79 9.56
3.625 2.67 3.28
3.750 0.00 0.01

---------------------------------------------------------------------

LONGTERM DEFLECTIONS (All spans loaded - positive downward)

Symbols: DS : Shrinkage deflection.


Job Number Sheet
FIRST FLOOR BEAMS DESIGN
Job Title
150X400 FFBM02
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com PRISCILLAR WAMBUI THEURI
Calcs by Checked by Date
E-Mail : mail@prokon.com ST OCT/2015
DL : Long-term deflection under permanent load.
DI : Instantaneous deflection under short-term load.
DT : Total long-term deflection.

SPAN 1

Position(m) DS(mm) DL(mm) DI(mm) DT(mm)

0.000 -0.00 0.00 0.00 -0.00


0.250 0.56 8.63 1.09 10.28
0.500 1.02 16.43 2.07 19.52
0.750 1.37 23.04 2.92 27.33
1.000 1.63 28.38 3.60 33.61
1.250 1.81 32.41 4.12 38.35
1.500 1.93 35.11 4.47 41.52
1.750 1.99 36.47 4.65 43.11
1.875 2.00 36.64 4.67 43.32
1.875 2.00 36.64 4.67 43.32
2.125 1.97 35.97 4.59 42.53
2.375 1.88 33.96 4.33 40.17
2.625 1.73 30.60 3.89 36.23
2.875 1.52 25.93 3.29 30.73
3.125 1.22 19.96 2.53 23.70
3.375 0.82 12.75 1.61 15.18
3.625 0.30 4.45 0.56 5.31
3.750 0.00 0.00 0.00 0.00

---------------------------------------------------------------------
QUANTITIES

Section Area(m²)
1 0.060

Total weight of beam = 5.40 kN


=====================================================================
A
Job Number Sheet
FIRST FLOOR BEAMS DESIGN
Job Title
150X400 FFBM02
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com PRISCILLAR WAMBUI THEURI
Calcs by Checked by Date
E-Mail : mail@prokon.com ST OCT/2015
Reinforcing Tables

Span M left
(kNm)
Maximum bar length (m)
TOP: Minimum bar diameter (mm)
Maximum bar diameter (mm)
BOTTOM: Minimum bar diameter (mm)
Maximum bar diameter (mm)
STIRRUP: Minimum diameter (mm)
Maximum diameter (mm)
Stirrup shape code
First bar mark - top
First bar mark - mid.[optional]
First bar mark - bot.[optional]
Cover to stirrups - top (mm)
Cover to stirrups - bot (mm)
Cover to stirrups - sides (mm)
Minimum stirrups as % of nominal
Loose method of detailing (Y/N)
Exploded elevation (Y/N) Y
Bending schedule scale 1: Auto
Number bars from left to right (Y/N) Y
Middle bar diameter (mm) Auto
Target Padds

Bars Mark SC Span Offset Length Hook Layer


Combination of Dead and Wind loads
Dead load factor
Dead load factor
Wind load factor
Adverse Beneficial
1.40 1.00 1.40
Combination of Dead, Live and Wind loads
Dead load factor
Live load factor
Wind load factor
1.20 1.20 1.20

Stirrup Section Bar Type + Shape Top Top Bottom


Number Number Diameter Mark Code Offset Flange Flange

Stirrup Length
Number Spacing Span Offset (m)

Section positions
Label Span Offset(m)
Job Number Sheet
FIRST FLOOR BEAMS DESIGN
Job Title
150X400 FFBM02
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com PRISCILLAR WAMBUI THEURI
Calcs by Checked by Date
E-Mail : mail@prokon.com ST OCT/2015

1 150X400 FFBM02.PAD
2 200
1 2
1 250
2 200
1 250
3 150
4 150
Height (normal text) mm 2.0
Height (title text) mm 2.5
Height (sec. bar mark) mm 1.8
Job Number Sheet
FIRST FLOOR BEAMS DESIGN
Job Title
150X400 FFBM02
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com PRISCILLAR WAMBUI THEURI
Calcs by Checked by Date
E-Mail : mail@prokon.com ST OCT/2015

Main and Shear Reinforcing diagrams. Span 1


SPAN 1 - 3.750

MAIN REINFORCEMENT As max = 2505 mm2 @ 1.88m


-2000

-1000

 
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
1000

2000

SPAN 1 - 3.750

SHEAR REINFORCEMENT Asv max = .7239mm²/mm @ .250m


.700
.600
.500
.400
 
.300
.200
.100
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

S-ar putea să vă placă și