Sunteți pe pagina 1din 4

Resource planning:

PERSONAL
Own staff MOBILITY
• Coordinator • 4x4 trucks
• Field supervisors • Minibus or similar
Contractor's staff (Coaster)

• 01 Supervisor for transfer of


responsible. personnel.

• 01 Security • Truck for


Supervisor. transportation of

Typical Cuadrilla equipment and tools.

• 01 Group leader
(Operator).
• 08 Operators
(Linemen)
• 01 Winche operator
• 04 Helpers.
Resource planning:
• EQUIPMENT AND TOOLS
• 01 Tension developer. • 01 1.0 TN Winch.
• 01 Insulating pole for • 04 Trico of 3 TN.
developer.
• 20 shackles ¾ of maneuver.
• 02 Pairs of dielectric gloves
• 04 Fiber anchor stairs
class 3 or 4.
glass.
• 02 Grounding pole.
• Wooden blocks 4 "x 40 cm.
• 06 Grounding Sets
• 16 AWG wire (mooring).
temporary for 220 kV lines
• 01 Soga ¾ "x 150 m.
• 02 Service Sogas.
• 02 Soga ½ "x 150 m.
• 01 Tool case.
• 06 Eyebolt 2 "x 1.20 m.
• 12 Pulleys maneuver 1.5 TN.
• 02 Comba of 20 lbs.
• 06 Tirfor of 3 TN.
• 08 Steel Stroke 1.20 m - 1.0
• 01 Aluminum pen. m.
• 06 Driver's clamp. • 02 ½ "rope for feather wind
- 10.
• 03 Guard cable clamp.
• 06 trunks 1.5TN.
• 02 Service pulley.
• 8 steel struts 5/8 "- 3,0 m.
• 02 Service rope section 100
m c/u • Service pulleys.
Resource planning:
PROTECTION EQUIPMENT PROTECTION EQUIPMENT

PERSONAL - EPP COLLECTIVE

• Dielectric helmet. • Fall arrest system (line of


vertical and / or horizontal
• Security shoes dielectric, life).
tipped bakelite.
• First-aid kit help.
• Work uniform.
• Evacuation couch (for the
• Safety glasses. work area).
• Sheepskin gloves • Table water (for minimize the
• Auditive protectors. risk of dehydration).

• Full-body harness and • Signaling according to


procedure of signs of work.
double anchor line.
• Fire extinguisher.
Resource planning:

TEAMS OF
COMMUNICATION FORMATS

• Portable radios. • Light inspection format.

• Cellphones. • Inspection format meticulous

MATERIALS • Inspection format of


insulators
• Insulators, line post, etc.
• Inspection format of
• Hardware.
structures (posts and / or
• Profiles.
towers).
• Material to start Earth.
• Inspection format of poles
• Drivers.
• Inspection format of tools
• Guard cable.
• Report format of the
executed works.

S-ar putea să vă placă și