PERSONAL
Own staff MOBILITY
• Coordinator • 4x4 trucks
• Field supervisors • Minibus or similar
Contractor's staff (Coaster)
• 01 Group leader
(Operator).
• 08 Operators
(Linemen)
• 01 Winche operator
• 04 Helpers.
Resource planning:
• EQUIPMENT AND TOOLS
• 01 Tension developer. • 01 1.0 TN Winch.
• 01 Insulating pole for • 04 Trico of 3 TN.
developer.
• 20 shackles ¾ of maneuver.
• 02 Pairs of dielectric gloves
• 04 Fiber anchor stairs
class 3 or 4.
glass.
• 02 Grounding pole.
• Wooden blocks 4 "x 40 cm.
• 06 Grounding Sets
• 16 AWG wire (mooring).
temporary for 220 kV lines
• 01 Soga ¾ "x 150 m.
• 02 Service Sogas.
• 02 Soga ½ "x 150 m.
• 01 Tool case.
• 06 Eyebolt 2 "x 1.20 m.
• 12 Pulleys maneuver 1.5 TN.
• 02 Comba of 20 lbs.
• 06 Tirfor of 3 TN.
• 08 Steel Stroke 1.20 m - 1.0
• 01 Aluminum pen. m.
• 06 Driver's clamp. • 02 ½ "rope for feather wind
- 10.
• 03 Guard cable clamp.
• 06 trunks 1.5TN.
• 02 Service pulley.
• 8 steel struts 5/8 "- 3,0 m.
• 02 Service rope section 100
m c/u • Service pulleys.
Resource planning:
PROTECTION EQUIPMENT PROTECTION EQUIPMENT
TEAMS OF
COMMUNICATION FORMATS