RESUMO
H. A. PEDROZO JÚNIOR
7
ABSTRACT
This work aims to study the economic feasibility of the septic tank and sink with the
objective to compare two models of sewer system: Conventional System and Individual
System. First, they presented important and relevant justifications to the subject,
showing concisely the main objectives of this study. From this context, it defined the
methodological typology there was a comparative compatibility between sewage
systems. It selected a real case of sewer network design in a sector of the city of
Goiania, and the same input data was made the design of septic tank and sink to the
region, according to the ABNT, and later comparing every budget. A significant result in
the individual system showed a saving of 13% was found. Then we were asked some
hypothetical changes in the studied scenario, allowing you to set the parameters of
how certain aspects influence the design and budget as sewage systems that undergo
changes as the distance of the project to the existing sewer network and the
percolation rate from soil. This analysis enabled the construction of a comparison chart
between the two systems, where it was inferred that the individual system could reach
to a favorable soil, an economy for the case study of up to 22.9%. Basic sanitation is a
right guaranteed by the Constitution for all. The analysis of this work the emphasis on
what is the best way to deploy a quality wastewater treatment and low cost.
H. A. PEDROZO JÚNIOR
8
LISTA DE FIGURAS
Figura 1 – Saneamento básico por tipo de serviço nas grandes regiões .......... 16
Figura 2 – Mapa dos municípios com rede coletora de esgoto .......................... 17
Figura 3 – Mapa com soluções alternativas à rede de esgoto ............................ 19
Figura 4 – Esquema de esgoto doméstico ............................................................. 23
Figura 5 – Esgoto a céu aberto ................................................................................. 24
Figura 6 – Estação de tratamento de esgoto de São Paulo ................................ 26
Figura 7 – Caixa de Areia da ETE Hélio Seixo de Britto – Goiânia GO ............ 27
Figura 8 – Decantador Primário................................................................................. 28
Figura 9 – Rede coletora de esgoto ......................................................................... 30
Figura 10 – Esquema de um tanque Séptico ......................................................... 32
Figura 11 – Sumidouro no sistema individual ......................................................... 34
Figura 12 – Detalhes e dimensões de um tanque séptico de câmara única .... 41
Figura 13 – Abertura para inspeção em tanque séptico prismático .................... 42
Figura 14 – Divisão dos módulos da rede de esgoto ............................................ 46
Figura 15 – Módulos de lançamento em PV existente ......................................... 47
Figura 16 – Módulo de lançamento em PV existente ............................................ 48
Figura 17 – Módulos de lançamento em PV dimensionado ................................ 49
Figura 18 – Divisão orçamentária de implantação da rede ................................. 50
Figura 19 – Fossa dimensionada em corte ............................................................ 53
Figura 20 – Fossa dimensionada em planta .......................................................... 54
Figura 21 – Sumidouro dimensionado em planta .................................................. 55
Figura 22 – Sumidouro dimensionado em corte .................................................... 56
Figura 23 – Divisão Orçamentária do Sistema Individual .................................... 57
Figura 24 – Itens mais onerosos da Fossa ............................................................. 57
Figura 25 – Itens mais onerosos do Sumidouro .................................................... 58
Figura 26 – Comparação Orçamentária entre Sistema Individual e
Convencional .......................................................................................... 58
Figura 27 – Gráfico comparativo entre sistemas individuais ............................... 63
Figura 28 – Gráfico comparativo entre sistemas convencionais.......................... 65
Figura 29 – Gráfico comparativo entre sistemas ................................................... 66
Figura 30 – Gráfico comparativo para equivalência de custos ........................... 66
H. A. PEDROZO JÚNIOR
9
LISTA DE TABELAS
H. A. PEDROZO JÚNIOR
10
H. A. PEDROZO JÚNIOR
11
SUMÁRIO
1 INTRODUÇÃO .......................................................................................................... 13
2 OBJETIVOS .............................................................................................................. 15
2.1 OBJETIVO GERAL............................................................................................ 15
2.2 OBJETIVOS ESPECÍFICOS ............................................................................ 15
3 JUSTIFICATIVA ....................................................................................................... 16
3.1 BENEFÍCIO SOCIAL ......................................................................................... 20
3.2 BENEFÍCIO ECONÔMICO .............................................................................. 20
3.3 BENEFÍCIO AMBIENTAL ................................................................................. 21
4 REVISÃO BIBLIOGRÁFICA .................................................................................. 23
4.1 ESGOTO ............................................................................................................. 23
4.2 ESTAÇÃO DE TRATAMENTO DE ESGOTO ............................................... 25
4.2.1 Tratamento Preliminar ........................................................................... 26
4.2.2 Tratamento Primário .............................................................................. 27
4.2.3 Tratamento Secundário ......................................................................... 28
4.2.4 Tratamento Terciário ............................................................................. 29
4.3 REDE DE ESGOTO .......................................................................................... 29
4.4 – SISTEMA INDIVIDUAL ................................................................................. 31
4.4.1 Fossa séptica .......................................................................................... 31
4.4.2 Sumidouro ............................................................................................... 32
5 METODOLOGIA ....................................................................................................... 35
5.1 DELINEAMENTO DE PESQUISA ................................................................. 36
5.2 COLETA DE DADOS ....................................................................................... 36
5.3 DIMENSIONAMENTO COMPARATIVO ...................................................... 37
5.3.1 Tanque séptico ....................................................................................... 37
5.3.2 Sumidouro ............................................................................................... 43
5.4 ANÁLISE DE TOMADA DE DECISÃO ......................................................... 44
6 RESULTADOS E DISCUSSÕES ......................................................................... 45
6.1 PROJETO DE REDE CONVENCIONAL ..................................................... 45
6.2 ORÇAMENTO REDE DE ESGOTO .............................................................. 50
6.3 DIMENSIONAMENTO DO SISTEMA INDIVIDUAL .................................... 51
6.3.1 Tanque séptico ........................................................................................ 51
H. A. PEDROZO JÚNIOR
12
H. A. PEDROZO JÚNIOR
13
1. INTRODUÇÃO
H. A. PEDROZO JÚNIOR
14
H. A. PEDROZO JÚNIOR
15
2. OBJETIVOS
H. A. PEDROZO JÚNIOR
16
3. JUSTIFICATIVA
H. A. PEDROZO JÚNIOR
17
H. A. PEDROZO JÚNIOR
18
Tabela 1 – Caracterização global dos sistemas de água e esgotos dos prestadores de serviços
participantes do SNIS.
H. A. PEDROZO JÚNIOR
19
H. A. PEDROZO JÚNIOR
20
H. A. PEDROZO JÚNIOR
21
H. A. PEDROZO JÚNIOR
22
H. A. PEDROZO JÚNIOR
23
4 REVISÃO BIBLIOGRÁFICA
4.1 ESGOTO
H. A. PEDROZO JÚNIOR
24
H. A. PEDROZO JÚNIOR
25
ETEs são unidades onde o esgoto, após sair das nossas residências e
passar pela rede coletora por meio de um longo sistema de tubos
subterrâneos, é levado para ser tratado, podendo, assim, ser devolvido ao
meio-ambiente e lançado em rios, lagos ou no mar, chamados de corpo d’água
receptor.
As etapas de tratamento do esgoto, segundo Azevedo Netto (1991),
podem ser definidas pelo grau crescente da complexidade do processo de
intervenção, de modo que podem se dividir em Preliminar, Primário,
Secundário e Terciário. Quanto maior o grau de processamento do esgoto na
ETE maior é a remoção de poluentes no efluente. Jordão e Pessôa (2009)
destaca ainda que o processo de tratamento pode ser classificado em físico,
com remoção de substâncias fisicamente; químico, com utilização de produtos
H. A. PEDROZO JÚNIOR
26
H. A. PEDROZO JÚNIOR
27
Britto que recebe o esgoto e através da rosca giratória no fundo retira a areia
mais densa e joga na caixa desarenadora.
H. A. PEDROZO JÚNIOR
28
H. A. PEDROZO JÚNIOR
29
H. A. PEDROZO JÚNIOR
30
H. A. PEDROZO JÚNIOR
31
H. A. PEDROZO JÚNIOR
32
4.4.2 Sumidouro
H. A. PEDROZO JÚNIOR
33
H. A. PEDROZO JÚNIOR
34
H. A. PEDROZO JÚNIOR
35
5 METODOLOGIA
H. A. PEDROZO JÚNIOR
36
sistema e como ele pode ser decisivo na tomada de decisão de qual sistema é
o mais adequado naquela região. Assim, serão analisados cenários diferentes
quanto à distância do empreendimento à rede já existente e quanto ao tipo de
solo.
A distância do empreendimento à rede existente porque isso influenciará
no preço do sistema coletivo devido a uma maior metragem de escavação e de
tubulação. Já o tipo de solo influência na maior dificuldade ou não de
escavação e principalmente no sistema individual no que tange a taxa de
infiltração no solo para o sumidouro.
Para alcançar os objetivos especificados serão realizadas as seguintes
ações:
H. A. PEDROZO JÚNIOR
37
De acordo com Jordão e Pessoa (2009) o tanque séptico tem que ser
projetado para satisfazer as vazões afluentes de esgoto e para proporcionar
uma manutenção econômica, fácil e rápida.
De acordo com a NBR 7229 (1993) as fossa sépticas devem contemplar
as seguintes condições específicas:
Afastamento de 1,50 m de construções, limites de terreno, sumidouros,
valas de infiltração e ramal predial de água;
Afastamento mínimo de 3 m de árvores e de qualquer ponto de rede
pública de abastecimento de água;
Afastamento mínimo de 15 m de poços de abastecimento de água ou de
corpos de água de qualquer natureza.
Todas as distâncias mínimas são computadas a partir da face externa
mais próxima aos elementos considerados.
Segundo o manual Orientações para Instalações Domiciliar do Sistema
de Fossa e Sumidouro da Caesb – Companhia de Saneamento Ambiental do
Distrito Federal, a fossa séptica deve ser instalada de modo a possibilitar fácil
ligação ao futuro coletor público e fácil acesso para remoção periódica do lodo,
com uma tampa de inspeção próxima da entrada.
Os materiais empregados na execução dos tanques sépticos devem
atender as exigências de resistência mecânica e resistência ao ataque químico
H. A. PEDROZO JÚNIOR
38
Onde:
V = Volume útil em litros;
N = Número de pessoas ou unidades de contribuição;
C = Contribuição de despejos, em litro/pessoa x dia ou em litro/unidade x
dia; (ver Tabela 3);
T = Período de detenção em dias (ver Tabela 2);
K = Taxa de acumulação de lodo digerido em dias, equivalente ao tempo
de acumulação de lodo fresco (ver Tabela 4);
Lf = Contribuição do lodo fresco, em litro/pessoa x dia ou em
litro/unidade x dia (ver Tabela 3).
H. A. PEDROZO JÚNIOR
39
Tabela 3 – Contribuição diária de esgoto (C) e de lodo fresco (Lf) por tipo de prédio e de ocupante
Tabela 4 – Taxa de acumulação total de lodo (K), em dias, por intervalo entre limpezas e tempe ratura do
mês mais frio
H. A. PEDROZO JÚNIOR
40
H. A. PEDROZO JÚNIOR
41
H. A. PEDROZO JÚNIOR
42
Onde:
a ≥ 5cm;
b ≥ 5cm;
c = 1/3 h;
h = profundidade útil;
H = altura interna total;
L = comprimento interno total.
A NBR 7229 (1993) orienta abertura para inspeção dos tanques sépticos
com as seguintes relações:
I. Todo tanque deve ter pelo menos uma abertura com a menor
dimensão igual ou superior a 0,60 m;
II. O máximo de abrangência horizontal, admissível para efeiro de
limpeza, é de 1,50 m, a partir do qual nova abertura deve ser
necessária.
H. A. PEDROZO JÚNIOR
43
5.3.2 Sumidouro
Ve = N x C Equação (2)
Onde:
Ve = Volume de contribuição;
N = Número de pessoas;
C = Contribuição de despejos (ver Tabela 3).
Af = Ve / Ci Equação (3)
Onde:
Af = Área de infiltração do sumidouro;
Ve = Volume de contribuição;
Ci = Taxa de aplicação diária (ver tabela 6).
H. A. PEDROZO JÚNIOR
44
Af = ( π x D x h ) Equação (4)
Onde:
Af = Área de infiltração do sumidouro;
D = Diâmetro do sumidouro;
h = Profundidade do sumidouro.
H. A. PEDROZO JÚNIOR
45
6 RESULTADOS E DISCUSSÕES
H. A. PEDROZO JÚNIOR
47
H. A. PEDROZO JÚNIOR
48
Os módulos RM3, RM4, RM5, RM6, RM7, RM8, A, L, BH1, BH2 e SP1
terão lançamento no PV do interceptor do Córrego Ladeira (projetado),
conforme figura 17, localizado na Avenida das Esmeraldas:
- Cota de terreno = 717.00 m;
- Nível de Fundo = 714.00 m;
- Profundidade = 3,00 m.
H. A. PEDROZO JÚNIOR
49
TRAVESSIA
INTERCEPTOR
R$ 8.200.830,00
(61%)
Fonte: O autor.
H. A. PEDROZO JÚNIOR
51
Custo
Extensão % da Administração
Custo da obra Custo Total Linear
(m) extensão da obra
(R$/m)
Ramais
17.688,00 0,186 R$ 1.426.032,04 R$ 146.544,75 R$ 1.572.576,79 88,91
Domiciliares
Rede
72.500,00 0,764 R$ 8.200.830,00 R$ 600.661,15 R$ 8.801.491,15 121,40
coletora
Coletor
2.096,00 0,022 R$ 706.998,22 R$ 17.365,32 R$ 724.363,54 345,59
Tronco
Sistema
94.934,51 1,000 R$12.579.028,29 R$ 786.530,65 R$13.365.558,94 140,79
Coletivo
Fonte: O autor.
H. A. PEDROZO JÚNIOR
52
Onde:
V = Volume útil;
Ab = área da base da fossa (Comprimento x Largura);
H. A. PEDROZO JÚNIOR
53
h = profundidade útil.
Temos:
1,8 = (Comprimento x Largura) x 1,20
Comprimento x Largura = 1,5 m²
Fonte: O autor.
H. A. PEDROZO JÚNIOR
54
Fonte: O autor.
6.3.2 Sumidouro
Ve = N x C
Ve = 4 x 130
Ve = 520 Litros/dia = 0,52 m³/dia
Af = Ve / Ci
Af = 0,52 / 0,065
Af = 8 m²
H. A. PEDROZO JÚNIOR
55
Ve = 0,52; calculado;
Ci = 0,065; valor de referência à taxa de percolação adotada de 400
min/m;
Af = π x D x h
8 = 3,14 x 1,5 x h
h = 1,7 m
Fonte: O autor.
H. A. PEDROZO JÚNIOR
56
Fonte: O autor.
H. A. PEDROZO JÚNIOR
57
Sistema Individual
Fonte: O autor.
Fossa Séptica
R$ 224,06; ESCAVAÇÃO
R$ 337,64; 18%
27%
CONCRETO
R$ 359,56; ESTRUTURAL
R$ 328,75; 29% ALVENARIA
26%
DEMAIS ITENS
Fonte: O autor.
H. A. PEDROZO JÚNIOR
58
Sumidouro
R$269,07 ;
ESCAVAÇÃO
16% R$1.035,76 ;
60% ALVENARIA
R$413,68 ;
24% DEMAIS ITENS
Fonte: O autor.
R$13.000.000,00
R$12.500.000,00
R$
R$12.000.000,00
11.595.074,46
R$11.500.000,00
R$11.000.000,00
R$10.500.000,00
Custo Total Sistema Individual Custo Total Sistema Coletivo
Fonte: O autor.
H. A. PEDROZO JÚNIOR
59
Onde:
N = Número de pessoas ou unidades de contribuição;
C = Contribuição de despejos (ver tabela 3);
Ve = Volume de contribuição de esgoto;
Ci = Taxa de aplicação diária (ver tabela 6);
Af = Área de infiltração do sumidouro;
D = Diâmetro interno.
H. A. PEDROZO JÚNIOR
61
mínimo, de tal forma que para o dimensionamento dos três foi usado o volume
do tanque séptico, fazendo com que esses três casos tivessem os mesmos
valores.
hc (m) Vuc (m³) Vu,min (m³) h (m) hi (m) Vi (m³) Dt (m) Ht (m) Vt (m³)
0,55 0,98 1,82 1,03 1,87 3,30 1,70 1,97 4,47
0,79 1,39 1,82 1,03 1,87 3,30 1,70 1,97 4,47
0,92 1,63 1,82 1,03 1,87 3,30 1,70 1,97 4,47
1,10 1,95 1,95 1,10 1,94 3,43 1,70 2,04 4,64
1,23 2,17 2,17 1,23 2,07 3,65 1,70 2,17 4,92
1,70 3,00 3,00 1,70 2,54 4,48 1,70 2,64 5,99
2,08 3,68 3,68 2,08 2,92 5,16 1,70 3,02 6,86
2,98 5,27 5,27 2,98 3,82 6,75 1,70 3,92 8,90
3,45 6,09 6,09 3,45 4,29 7,58 1,70 4,39 9,96
4,60 8,13 8,13 4,60 5,44 9,61 1,70 5,54 12,57
Em azul valores de referência do 1º caso dimensionado
Fonte: O autor.
Onde:
hc = altura útil calculada;
Vuc = Volume útil calculado;
Vu,min = Volume útil mínimo (deve ser no mínimo igual ao da fossa);
h = Altura útil (calculado após encontrar o Vu,min);
hi = Altura interna total (leva em conta o lastro de brita e a área acima da
geratriz inferior da tubulação de entrada);
Vi = Volume interno total;
Dt = Diâmetro total (externo);
Ht = Altura total;
Vt = Volume total.
H. A. PEDROZO JÚNIOR
62
H. A. PEDROZO JÚNIOR
63
R$17.000.000,00
R$16.000.000,00
R$15.000.000,00
R$14.000.000,00
R$11.595.074,46
R$13.000.000,00
R$12.000.000,00
R$10.304.569,19
R$11.000.000,00
Taxa de
R$10.000.000,00 Percolação
40 80 120 160 200 400 600 1200 1400 2400 (min/m)
Fonte: O autor.
H. A. PEDROZO JÚNIOR
64
Extensão Acréscimo
Interceptor Distância Custo/m Interceptor Acréscimo Custo Custo Total Rede
(m) (m)
0,00 -2.507,51 789,23 R$ - -R$ 1.979.002,12 R$ 11.386.563,54
500,00 -2.007,51 789,23 R$ 394.615,00 -R$ 1.584.387,12 R$ 11.781.178,54
1.000,00 -1.507,51 789,23 R$ 789.230,00 -R$ 1.189.772,12 R$ 12.175.793,54
1.500,00 -1.007,51 789,23 R$ 1.183.845,00 -R$ 795.157,12 R$ 12.570.408,54
2.000,00 -507,51 789,23 R$ 1.578.460,00 -R$ 400.542,12 R$ 12.965.023,54
2.507,51 0,00 789,23 R$ 1.979.002,12 R$ - R$ 13.365.565,65
3.000,00 492,49 789,23 R$ 2.367.690,00 R$ 388.687,88 R$ 13.754.253,54
3.500,00 992,49 789,23 R$ 2.762.305,00 R$ 783.302,88 R$ 14.148.868,54
4.000,00 1.492,49 789,23 R$ 3.156.920,00 R$ 1.177.917,88 R$ 14.543.483,54
4.500,00 1.992,49 789,23 R$ 3.551.535,00 R$ 1.572.532,88 R$ 14.938.098,54
5.000,00 2.492,49 789,23 R$ 3.946.150,00 R$ 1.967.147,88 R$ 15.332.713,54
5.500,00 2.992,49 789,23 R$ 4.340.765,00 R$ 2.361.762,88 R$ 15.727.328,54
6.000,00 3.492,49 789,23 R$ 4.735.380,00 R$ 2.756.377,88 R$ 16.121.943,54
6.500,00 3.992,49 789,23 R$ 5.129.995,00 R$ 3.150.992,88 R$ 16.516.558,54
7.000,00 4.492,49 789,23 R$ 5.524.610,00 R$ 3.545.607,88 R$ 16.911.173,54
7.365,99 4.858,48 789,23 R$ 5.813.459,64 R$ 3.834.457,52 R$ 17.200.023,18
Em azul valores de referência do 1º caso dimensionado
Fonte: O autor.
R$16.000.000,00
R$15.000.000,00 R$
13.365.565,65
R$14.000.000,00
R$
R$13.000.000,00 11.386.563,54
R$12.000.000,00
R$11.000.000,00
Extensão
R$10.000.000,00
Interceptor
0,00
500,00
1.000,00
1.500,00
2.000,00
2.507,51
3.000,00
3.500,00
4.000,00
4.500,00
5.000,00
5.500,00
6.000,00
6.500,00
7.000,00
7.365,99
(m)
Fonte: O autor.
H. A. PEDROZO JÚNIOR
66
1.000,00
3.000,00
4.500,00
5.000,00
6.500,00
1.500,00
2.000,00
2.507,51
3.500,00
4.000,00
5.500,00
6.000,00
7.000,00
7.365,99
500,00
0,00
R$18.000.000,00 R$18.000.000,00
R$17.000.000,00 R$17.000.000,00
R$16.000.000,00 R$16.000.000,00
R$15.000.000,00 R$15.000.000,00
R$14.000.000,00 R$14.000.000,00
R$13.000.000,00 R$13.000.000,00
R$12.000.000,00 R$12.000.000,00
R$11.000.000,00 R$11.000.000,00
R$10.000.000,00 R$10.000.000,00
40 80 120 160 200 400 600 120014002400
Custo Total Individual
Taxa de Percolação (min/m)
Custo Total Rede
Fonte: O autor.
7.000,00
2500
6.000,00
2000
4.551,25 5.000,00
1500 4.000,00
3.410,14
3.000,00
1000
1.205,44
2.000,00
264,20
500
1.000,00
400 600 1200 1400 2400
0 0,00
Taxa Percolação
Extensão Interceptor
H. A. PEDROZO JÚNIOR
67
7 CONCLUSÃO
H. A. PEDROZO JÚNIOR
68
H. A. PEDROZO JÚNIOR
69
REFERÊNCIAS
BATALHA, B.H.L. Séries Manuais: fossa séptica. 2ª Ed. São Paulo : CETESB, 1989.
H. A. PEDROZO JÚNIOR
70
H. A. PEDROZO JÚNIOR
71
ORÇAMENTO ANALÍTICO
Obra: FOSSA SÉPTICA E SUMIDOURO
Local: GOIÂNIA - GO
Data: FEVEREIRO / 2016
BDI: 27,74%
P C/ % %
ITEM COD. DESCRIÇÃO DOS SERVIÇOS UNID. QUANT. PREÇO TOTAL
BDI Relativa Absoluta
TOTAL 2.970,31
1 FOSSA SÉPTICA 1.250,01 0,42
ESCAVAÇÃO MANUAL EM VALAS
COM MATERIAL DE 1ª CATEGORIA
1.1 168 - PROFUNDIDADE ATÉ 2,0 M M³ 5,25 33,41 42,68 224,06 0,18 0,08
REATERRO COMPACTADO DE
1.2 227 CAVAS COM COMPACTADOR M³ 0,40 7,76 9,91 3,97 0,00 0,00
APILOAMENTO DE VALAS OU
1.3 215 CAVAS M² 2,76 5,04 6,44 17,77 0,01 0,01
1.4 i720 AÇO CA-25 1/4'' (6,35 MM) KG 10,50 5,73 7,32 76,85 0,06 0,03
CONCRETO ESTRUTURAL FCK =
15,0 MPA (INCLUINDO
1.5 303 LANÇAMENTO ESTRUTURA) M³ 0,80 351,85 449,45 359,56 0,29 0,12
LASTRO DE CONCRETO MAGRO
1.6 334 ESP. = 8 CM M³ 1,00 25,75 32,89 32,89 0,03 0,01
ALVENARIA TIJOLO FURADO 1/2
1.7 385 VEZ CIM/CAL/AREIA 1:3:6 S/AND. M² 6,45 39,90 50,97 328,75 0,26 0,11
1.8 JOELHO 90º 100MM UN 1,00 10,68 13,64 13,64 0,01 0,00
1.9 TE 100 MM UN 2,00 13,22 16,89 33,77 0,03 0,01
TUBO PVC SERIE NORMAL -
ESGOTO PREDIAL DN 100 MM -
1.10 1919 NBR 5688 M 0,80 8,59 10,97 8,78 0,01 0,00
FORMAS COMPENSADA,
MADEIRIT, ESP = 12 CM, COM
SARRAFO DE PINHOS DE 3
TERCEIRA, REAPROVEITAMENTO
1.11 DE 2 VEZES M² 2,57 45,68 58,35 149,96 0,12 0,05
H. A. PEDROZO JÚNIOR
72
Orçamento
CLIENTE: SUPERIN. GESTÃO DE OBRAS LOCAL : GOIÂNIA
FINALIDADE: ORÇAMENTO BASE : SANEAGO_2015 -02_1
13.365.558,94
A CONSTRUÇÃO CIVIL 11.493.650,31
A.1 CANTEIRO DE OBRAS - GERAL 137.584,00
A.1.1 CANTEIRO DE OBRAS E OUTROS 137.584,00
A.1.1.1 CANTEIRO DE OBRAS E OUTROS 137.584,00
CANTEIRO DE OBRAS MOBILIZAÇÃO E DESMOBILIZAÇÃO DE EQUIPAMENTO - RECANTO
A.1.1.1.3 UN 1,00 137.584,00 137.584,00
MINAS GERAIS - GOIÂNIA - SES (CÓDIGO: 73-2014)
A.4.1.2.1 MONTAGEM DE TIL LIGAÇÃO PREDIAL 101,6 X 101,6 UN 4.511,00 13,39 60.402,29
A.4.1.3.2 CORTE E DEMOLIÇÃO CALÇADA/PAVIMENTO ASFALTICO COM EQUIPAMENTOS M³ 421,70 27,22 11.478,67
A.5.1.2.1 CAVALETE COM PLACA DE ADVERTÊNCIA 1,0 X 0,40 M (TIPOS I...V) UN 52,00 268,45 13.959,40
A.5.1.2.2 CONE DE SINALIZAÇÃO COM PINTURA REFLETIVA H=0.50 M UN 104,00 31,41 3.266,64
H. A. PEDROZO JÚNIOR
73
A.5.1.3.19 COMPACTAÇÃO MECANIZADA FUNDO DE VALAS PARA REDE DE ESGOTOS M² 51.837,94 0,55 28.510,87
REATERRO MANUAL COM COMPACTAÇÃO MANUAL ATÉ 20 CM ACIMA GERATRIZ
A.5.1.3.20 M³ 21.247,19 8,01 170.189,99
SUPERIOR DO TUBO
REATERRO MECANIZADO DE VALA EMPREGANDO COMPACTADOR DE PLACA
A.5.1.3.21 M³ 58.315,82 9,88 576.160,30
VIBRATÓRIA (OU SOQUETE VIBRATÓRIO), EM CAMADAS DE ATÉ 30 CM
CARGA, TRANSPORTES E DESCARGA DE MATERIAL ESCAVADO(BOTA-
A.5.1.5 143.588,08
FORA)
A.5.1.5.1 ESPALHAMENTO DE MATERIAL EM BOTA FORA M³ 2.175,97 1,58 3.438,03
A.5.1.5.2 CARGA MANUAL ROCHA EM CAMINHÃO BASCULANTE = 6,5 TON. M³ 76,58 27,08 2.073,79
CARGA MECANIZADA (COM A PÁ FRONTAL DA RETROESCAVADEIRA) EM CAMINHÃO
A.5.1.5.3 M³ 1.410,18 3,88 5.471,50
BASCULANTE - MATERIAL DE 2ª CATEGORIA
CARGA MECANIZADA (COM A PÁ FRONTAL DA RETROESCAVADEIRA) EM CAMINHÃO
A.5.1.5.4 M³ 689,21 5,88 4.052,55
BASCULANTE - MATERIAL DE 3ª CATEGORIA
TRANSPORTE E DESCARGA DE MATERIAL DE 1ª OU 2ª CATEGORIA (M³ X KM) - EM
A.5.1.5.5 M³XKM 33.562,28 2,25 75.515,13
CAMINHÃO BASCULANTE CAP. 6 M³ - COM EMPOLAMENTO
TRANSPORTE E DESCARGA DE MATERIAL DE 3ª CATEGORIA (M³ X KM) - EM CAMINHÃO
A.5.1.5.6 M³XKM 18.225,80 2,91 53.037,08
BASCULANTE CAP. 6 M³ - COM EMPOLAMENTO
A.5.1.6 ESCORAMENTO DE VALAS / CAVAS 698.592,19
A.5.1.8.1 CTD E MONTAGEM TUBO/CONEXÃO PVC JE INCLUINDO TESTE HIDROSTÁTICO DN 100 M 65.653,00 1,98 129.992,94
A.5.1.8.2 CTD E MONTAGEM TUBO/CONEXÃO PVC JE INCLUINDO TESTE HIDROSTÁTICO DN 150 M 6.847,00 4,92 33.687,24
A.5.1.9.14 PROTEÇÃO PARA TIL (COM FORNECIMENTO DE ANEL/TAMPÃO) UN 1.440,00 253,24 364.665,60
A.5.1.10.2 CORTE E DEMOLIÇÃO CALÇADA/PAVIMENTO ASFALTICO COM EQUIPAMENTOS M³ 3.762,94 27,22 102.427,23
H. A. PEDROZO JÚNIOR
74
A.5.1.14.3 ESCAVAÇÃO E CARGA DE MATERIAL DE JAZIDA (COM TRATOR E PÁ CARREGADEIRA) M³ 383,83 6,00 2.302,98
A.5.1.15.1 ESCAVAÇÃO E CARGA DE MATERIAL DE JAZIDA (COM TRATOR E PÁ CARREGADEIRA) M³ 1.410,18 6,00 8.461,08
A.6.1.2.1 CAVALETE COM PLACA DE ADVERTÊNCIA 1,0 X 0,40 M (TIPOS I...V) UN 4,00 268,45 1.073,80
A.6.1.2.2 CONE DE SINALIZAÇÃO COM PINTURA REFLETIVA H=0.50 M UN 8,00 31,41 251,28
A.6.1.3.19 COMPACTAÇÃO MECANIZADA FUNDO DE VALAS PARA REDE DE ESGOTOS M² 1.607,52 0,55 884,14
REATERRO MANUAL COM COMPACTAÇÃO MANUAL ATÉ 20 CM ACIMA GERATRIZ
A.6.1.3.20 M³ 792,78 8,01 6.350,17
SUPERIOR DO TUBO
REATERRO MECANIZADO DE VALA EMPREGANDO COMPACTADOR DE PLACA
A.6.1.3.21 M³ 6.670,99 9,88 65.909,38
VIBRATÓRIA (OU SOQUETE VIBRATÓRIO), EM CAMADAS DE ATÉ 30 CM
ESCAVAÇÃO MECANIZADA (COM RETROESCAVADEIRA) EM VALAS COM MATERIAL DE 2ª
A.6.1.3.22 M³ 101,49 11,79 1.196,57
CATEGORIA - PROFUNDIDADE DE 2,0 A 4,0M
ESCAVAÇÃO MECANIZADA (COM ESCAVADEIRA HIDRÁULICA) EM VALAS COM MATERIAL
A.6.1.3.23 M³ 527,24 7,52 3.964,84
DE 1ª CATEGORIA - PROFUNDIDADE DE 4,0 A 6,0M
ESCAVAÇÃO MECANIZADA (COM ESCAVADEIRA HIDRÁULICA) EM VALAS COM MATERIAL
A.6.1.3.25 M³ 22,20 9,95 220,89
DE 2ª CATEGORIA - PROFUNDIDADE DE 4,0 A 6,0 M
ESCAVAÇÃO MANUAL EM VALAS COM MATERIAL DE 3ª CATEGORIA, PERFURAÇÃO COM
A.6.1.3.26 M³ 15,51 147,85 2.293,15
PERFURATRIZ MANUAL E USO DE EXPLOSIVO - PROFUNDIDADE ATÉ 2,0 M
ESCAVAÇÃO MANUAL EM VALAS COM MATERIAL DE 3ª CATEGORIA, PERFURAÇÃO COM
A.6.1.3.27 M³ 15,51 177,92 2.759,54
PERFURATRIZ MANUAL E USO DE EXPLOSIVO - PROFUNDIDADE DE 2,0 A 4,0 M
CARGA, TRANSPORTES E DESCARGA DE MATERIAL ESCAVADO(BOTA-
A.6.1.4 9.419,01
FORA)
A.6.1.4.8 ESPALHAMENTO DE MATERIAL EM BOTA FORA M³ 145,36 1,58 229,67
A.6.1.4.9 CARGA MANUAL ROCHA EM CAMINHÃO BASCULANTE = 6,5 TON. M³ 4,24 27,08 114,82
CARGA MECANIZADA (COM A PÁ FRONTAL DA RETROESCAVADEIRA) EM CAMINHÃO
A.6.1.4.10 M³ 102,93 3,88 399,37
BASCULANTE - MATERIAL DE 2ª CATEGORIA
CARGA MECANIZADA (COM A PÁ FRONTAL DA RETROESCAVADEIRA) EM CAMINHÃO
A.6.1.4.11 M³ 38,19 5,88 224,56
BASCULANTE - MATERIAL DE 3ª CATEGORIA
H. A. PEDROZO JÚNIOR
75
A.6.1.10.2 CTD E MONTAGEM TUBO/CONEXÃO PVC JE INCLUINDO TESTE HIDROSTÁTICO DN 150 M 362,00 4,92 1.781,04
A.6.1.10.3 CTD E MONTAGEM TUBO/CONEXÃO PVC JE INCLUINDO TESTE HIDROSTÁTICO DN 200 M 1.555,00 5,25 8.163,75
A.6.1.10.4 CTD E MONTAGEM TUBO/CONEXÃO PVC JE INCLUINDO TESTE HIDROSTÁTICO DN 250 M 179,00 8,61 1.541,19
A.6.1.11.7 PROTEÇÃO PARA TIL (COM FORNECIMENTO DE ANEL/TAMPÃO) UN 27,00 253,24 6.837,48
A.6.1.12.1 CORTE E DEMOLIÇÃO CALÇADA/PAVIMENTO ASFALTICO COM EQUIPAMENTOS M³ 259,36 27,23 7.062,37
LIMPEZA DO CORTE, COLOCAÇÃO E COMPACTAÇÃO CASCALHO, IMPRIMAÇÃO E
A.6.1.12.3 COLOCAÇÃO DE CAPA ASFÁLTICA (CBUQ) - EXCLUSIVE MATERIAL DE EMPRÉSTIMO M² 3.705,17 61,42 227.571,54
PARA BASE
A.6.1.13 MATERIAL DE EMPRÉSTIMO PARA BASE ASFÁLTICA 46.894,50
A.6.1.13.1 ESCAVAÇÃO E CARGA DE MATERIAL DE JAZIDA (COM TRATOR E PÁ CARREGADEIRA) M³ 629,88 6,00 3.779,28
A.6.1.15.1 ESCAVAÇÃO E CARGA DE MATERIAL DE JAZIDA (COM TRATOR E PÁ CARREGADEIRA) M³ 102,93 6,00 617,58
A.6.5.2.2 ESCAVAÇÃO MANUAL CAVAS 1ª. CAT. PROFUNDIDADE ATÉ 3.0 M M³ 1,48 44,95 66,53
H. A. PEDROZO JÚNIOR
76
A.6.5.11.2 CONCRETO ESTRUTURAL FCK=30,0 MPA ( INCLUINDO LANÇAMENTO ESTRUTURAL) M³ 5,25 510,78 2.681,60
A.7.1.2.1 CAVALETE COM PLACA DE ADVERTÊNCIA 1,0 X 0,40 M (TIPOS I...V) UN 2,00 268,45 536,90
A.7.1.2.2 CONE DE SINALIZAÇÃO COM PINTURA REFLETIVA H=0.50 M UN 4,00 31,41 125,64
A.7.1.3.19 COMPACTAÇÃO MECANIZADA FUNDO DE VALAS PARA REDE DE ESGOTOS M² 1.987,30 0,55 1.093,02
REATERRO MANUAL COM COMPACTAÇÃO MANUAL ATÉ 20 CM ACIMA GERATRIZ
A.7.1.3.20 M³ 1.220,06 8,01 9.772,68
SUPERIOR DO TUBO
A.7.1.3.21 REATERRO MECANIZADO COM PASSADAS DO EQUIPAMENTOS DE TRANSPORTE M³ 3.812,21 2,99 11.398,51
A.7.1.6.1 ESCAVAÇÃO E CARGA DE MATERIAL DE JAZIDA (COM TRATOR E PÁ CARREGADEIRA) M³ 1.652,83 6,00 9.916,98
H. A. PEDROZO JÚNIOR
77
A.7.1.7.9 CARGA MANUAL ROCHA EM CAMINHÃO BASCULANTE = 6,5 TON. M³ 4,11 27,08 111,30
A.7.1.10.1 CTD E MONTAGEM TUBO/CONEXÃO PVC JE INCLUINDO TESTE HIDROSTÁTICO DN 250 M 456,00 8,61 3.926,16
A.7.1.10.2 CTD E MONTAGEM TUBO/CONEXÃO PVC JE INCLUINDO TESTE HIDROSTÁTICO DN 350 M 385,00 12,48 4.804,80
A.7.1.10.3 CTD E MONTAGEM TUBO/CONEXÃO PVC JE INCLUSIVE TESTE HIDROSTÁTICO DN 400 M 1.497,00 30,52 45.688,44
A.7.1.12.5 CORTE E DEMOLIÇÃO CALÇADA/PAVIMENTO ASFALTICO COM EQUIPAMENTOS M³ 1,06 27,23 28,86
A.7.5.2.2 ESCAVAÇÃO MANUAL CAVAS 1ª. CAT. PROFUNDIDADE ATÉ 3.0 M M³ 9,21 44,95 413,99
H. A. PEDROZO JÚNIOR
78
BRAÇADEIRA TIPO ´´D´´, CHAPA DE 1/4´´, L=10CM, COM 4 CHUMBADORES TIPO ´´J´´ DE
A.7.5.7.2 1/4´´, H= 35CM PARA TUBO DN 250 TRAVESSIA I - INTERCEPTOR LADEIRA (CONFORME UN 16,00 73,08 1.169,28
PROJETO - PROC. 4593/2012)
A.7.5.9 FUNDAÇÕES/ESTRUTURA 910.183,96
A.7.5.9.2 CONCRETO ESTRUTURAL FCK=30,0 MPA ( INCLUINDO LANÇAMENTO ESTRUTURAL) M³ 1.515,00 510,78 773.831,70
FORMAS COMPENSADA, MADEIRIT,ESP=12MM, COM SARRAFO DE PINHOS DE 3
A.7.5.9.3 M2 856,74 116,70 99.981,56
TERCEIRA, REAPROVEITAMENTO DE 2 VEZES
A.7.6.2.2 ESCAVAÇÃO MANUAL CAVAS 1ª. CAT. PROFUNDIDADE ATÉ 3.0 M M³ 3,11 44,95 139,79
A.7.6.9.2 CONCRETO ESTRUTURAL FCK=30,0 MPA ( INCLUINDO LANÇAMENTO ESTRUTURAL) M³ 7,50 510,78 3.830,85
B.4.1.5.2 PVC INFRA/ESG - TIL LIGAÇÃO PREDIAL ESGOTO COLETOR BBB JE - DN 100 UN 4.511,00 30,54 137.765,94
B.4.1.5.3 PVC INFRA/ESG - PESCOÇO - TUBO ESGOTO COLETOR - DN 100 M 178,00 10,15 1.806,70
B.4.1.5.4 PVC INFRA/ESG - TAMPÃO COMPLETO P/TIL - DN 100 UN 356,00 13,15 4.681,40
B.4.1.5.5 PVC INFRA/SES - TUBO ESGOTO SÉRIE REFORÇADA - DN100 M 17.688,00 10,01 177.056,88
B.5.1.11.2 PVC INFRA/SR - CURVA 11°15 ESGOTO SÉRIE REFORÇADA - DN 100 UN 118,00 11,36 1.340,48
B.5.1.11.3 PVC INFRA/SR - CURVA 22°30 ESGOTO SÉRIE REFORÇADA - DN 100 UN 266,00 9,49 2.524,34
B.5.1.11.4 PVC INFRA/SR - CURVA 45° ESGOTO SÉRIE REFORÇADA - DN 100 UN 268,00 9,49 2.543,32
B.5.1.11.5 PVC INFRA/ESG - CURVA 45° ESGOTO COLETOR BB - DN 150 UN 39,00 43,69 1.703,91
B.5.1.11.6 PVC INFRA/ESG - LUVA CORRER ESGOTO COLETOR JE - DN 250 UN 1,00 51,47 51,47
B.5.1.11.7 PVC INFRA/ESG - LUVA CORRER ESGOTO COLETOR JE - DN 200 UN 127,00 25,46 3.233,42
H. A. PEDROZO JÚNIOR
79
B.5.1.11.8 PVC INFRA/ESG - LUVA CORRER ESGOTO COLETOR JE - DN 150 UN 81,00 9,35 757,35
B.5.1.11.10 PVC INFRA/SR - LUVA SIMPLES ESGOTO SÉRIE REFORÇADA - DN 100 UN 1.570,00 5,08 7.975,60
B.5.1.11.11 PVC INFRA/ESG - REDUÇÃO EXCÊNTRICA ESGOTO COLETOR PB JE - DN 150 X 100 UN 123,00 10,13 1.245,99
B.5.1.11.12 PVC INFRA/ESG - REDUÇÃO EXCÊNTRICA ESGOTO COLETOR PB JE - DN 200 X 150 UN 4,00 33,44 133,76
B.5.1.11.13 PVC INFRA/ESG - REDUÇÃO EXCÊNTRICA ESGOTO COLETOR PB JE - DN 300 X 200 UN 5,00 107,84 539,20
B.5.1.11.14 PVC INFRA/ESG - TAMPÃO COMPLETO P/TIL - DN 250 UN 1,00 56,85 56,85
B.5.1.11.15 PVC INFRA/ESG - TAMPÃO COMPLETO P/TIL - DN 100 UN 1.214,00 13,15 15.964,10
B.5.1.11.16 PVC INFRA/ESG - TAMPÃO COMPLETO P/TIL - DN 200 UN 169,00 26,35 4.453,15
B.5.1.11.17 PVC INFRA/ESG - TE ESGOTO COLETOR BBB JE - DN 100 UN 368,00 15,73 5.788,64
B.5.1.11.19 PVC INFRA/ESG - TE REDUÇÃO ESGOTO COLETOR BBB JE - DN 250 X 200 UN 2,00 75,21 150,42
B.5.1.11.22 PVC INFRA/SES - TUBO ESGOTO SÉRIE REFORÇADA - DN100 M 65.653,00 10,01 657.186,53
B.5.1.11.23 PVC INFRA/SES - TUBO ESGOTO COLETOR JE - DN 150 M 6.847,00 21,35 146.183,45
B.5.1.11.25 PVC INFRA/ESG - TIL RADIAL - DN 300 X DL 250 UN 1,00 1.131,48 1.131,48
B.5.1.11.26 PVC INFRA/ESG - TIL RADIAL - DN 150 X DL 200 UN 169,00 496,83 83.964,27
B.5.1.11.28 PVC INFRA/ESG - TIL TUBO DE QUEDA REDE BBB JE - DN 100 X 100 UN 56,00 91,48 5.122,88
B.5.1.11.29 PVC INFRA/SR - LUVA DE CORRER ESGOTO SÉRIE REFORÇADA - DN 100 UN 2.384,00 3,54 8.439,36
B.5.1.11.30 PVC INFRA/ESG - TE REDUÇÃO ESGOTO COLETOR BBB JE - DN 200 X 150 UN 15,00 77,70 1.165,50
B.5.1.11.31 PVC INFRA/ESG - PESCOÇO - TUBO ESGOTO COLETOR - DN 200 M 85,70 33,59 2.878,66
B.5.1.11.32 PVC INFRA/ESG - CURVA 22°30 ESGOTO COLETOR PB - DN 150 UN 39,00 45,90 1.790,10
B.5.1.11.33 PVC INFRA/ESG - PESCOÇO - TUBO ESGOTO COLETOR - DN 100 M 1.034,48 10,15 10.499,97
B.5.1.11.34 PVC INFRA/ESG - PESCOÇO - TUBO ESGOTO COLETOR - DN 150 M 3,60 21,36 76,90
B.6.1.9.1 PVC INFRA/ESG - CURVA 22°30 ESGOTO COLETOR PB - DN 150 UN 2,00 45,90 91,80
B.6.1.9.2 PVC INFRA/ESG - CURVA 22°30 ESGOTO COLETOR PB - DN 200 UN 1,00 38,10 38,10
B.6.1.9.3 PVC INFRA/ESG - CURVA 45° ESGOTO COLETOR PB - DN 150 UN 2,00 38,09 76,18
B.6.1.9.4 PVC INFRA/ESG - CURVA 45° ESGOTO COLETOR PB - DN 200 UN 1,00 47,32 47,32
B.6.1.9.5 PVC INFRA/ESG - LUVA CORRER ESGOTO COLETOR JE - DN 250 UN 21,00 51,47 1.080,87
B.6.1.9.6 PVC INFRA/ESG - LUVA CORRER ESGOTO COLETOR JE - DN 200 UN 7,00 25,46 178,22
B.6.1.9.7 PVC INFRA/ESG - LUVA CORRER ESGOTO COLETOR JE - DN 150 UN 2,00 9,35 18,70
B.6.1.9.8 PVC INFRA/ESG - REDUÇÃO EXCÊNTRICA ESGOTO COLETOR PB JE - DN 200 X 150 UN 1,00 33,44 33,44
B.6.1.9.9 PVC INFRA/ESG - REDUÇÃO EXCÊNTRICA ESGOTO COLETOR PB JE - DN 250 X 200 UN 1,00 36,35 36,35
B.6.1.9.10 PVC INFRA/ESG - REDUÇÃO EXCÊNTRICA ESGOTO COLETOR PB JE - DN 300 X 200 UN 50,00 107,84 5.392,00
B.6.1.9.11 PVC INFRA/ESG - REDUÇÃO EXCÊNTRICA ESGOTO COLETOR PB JE - DN 300 X 250 UN 6,00 112,08 672,48
B.6.1.9.12 PVC INFRA/ESG - TAMPÃO COMPLETO P/TIL - DN 250 UN 21,00 56,85 1.193,85
B.6.1.9.13 PVC INFRA/ESG - TAMPÃO COMPLETO P/TIL - DN 200 UN 6,00 26,35 158,10
B.6.1.9.14 PVC INFRA/ESG - TIL RADIAL - DN 300 X DL 250 UN 21,00 1.131,48 23.761,08
B.6.1.9.15 PVC INFRA/ESG - TIL RADIAL - DN 150 X DL 200 UN 6,00 496,83 2.980,98
B.6.1.9.16 PVC INFRA/SES - TUBO ESGOTO COLETOR JE - DN 150 M 362,00 21,35 7.728,70
B.6.1.9.17 PVC INFRA/SES - TUBO ESGOTO COLETOR JE - DN 200 M 1.555,00 33,59 52.232,45
B.6.1.9.18 PVC INFRA/SES - TUBO ESGOTO COLETOR JE - DN 250 M 179,00 57,36 10.267,44
B.6.1.9.20 FOFO/ESGOTO_C - LUVA COM BOLSAS JE2GS - DN 200 UN 1,00 309,22 309,22
B.6.1.9.22 PVC INFRA/ESG - TIL TUBO DE QUEDA REDE BBB JE - DN 250 X 150 UN 1,00 339,26 339,26
B.6.1.9.24 FOFO/ESGOTO_C - TUBO PONTA E BOLSA INTEGRAL NBR 15420 - DN 200 - L = 6000 UN 21,00 2.204,82 46.301,22
B.6.1.9.25 PVC INFRA/ESG - PESCOÇO - TUBO ESGOTO COLETOR - DN 200 M 2,01 33,59 67,52
B.6.1.9.26 PVC INFRA/ESG - PESCOÇO - TUBO ESGOTO COLETOR - DN 250 M 30,90 57,36 1.772,42
B.6.1.9.27 FOFO/ESGOTO_C - TUBO K-7 COM PONTAS - DN 200 - L = 3800 UN 2,00 2.175,69 4.351,38
B.6.1.9.28 FOFO/ESGOTO_C - TUBO K-7 COM PONTAS - DN 200 - L = 4400 UN 1,00 2.519,22 2.519,22
H. A. PEDROZO JÚNIOR
80
B.6.1.9.29 FOFO/ESGOTO_C - TUBO K-7 COM PONTAS - DN 200 - L = 3600 UN 1,00 2.061,18 2.061,18
B.7.1.14.1 PVC INFRA/SES - TUBO ESGOTO COLETOR JE - DN 250 M 456,00 57,36 26.156,16
B.7.1.14.2 PVC INFRA/SES - TUBO ESGOTO COLETOR JE - DN 300 M 385,00 89,40 34.419,00
B.7.1.14.3 PVC INFRA/SES - TUBO ESGOTO COLETOR JE - DN 400 M 1.497,00 145,20 217.364,40
B.7.1.14.4 FOFO/ESGOTO_T - TUBO K-7 PONTA E BOLSA - JTE - PN 10 - DN 250 M 110,00 514,67 56.613,70
B.7.1.14.5 FOFO/ESGOTO_C - TUBO K-9 COM FLANGE E PONTA - PN 10 - DN 400 - L = 5800 UN 1,00 3.557,50 3.557,50
B.7.1.14.6 FOFO/ESGOTO_C - TUBO K-9 COM FALNGES - JTE - PN 10 - DN 400 - L = 5800 UN 1,00 4.175,61 4.175,61
B.7.1.14.7 FOFO/ESGOTO_C - TUBO K-9 COM FLANGE E BOLSA - JTE - DN 400 - L = 5800 UN 1,00 3.607,63 3.607,63
B.7.1.14.8 FOFO/ESGOTO_T - TUBO K-7 PONTA E BOLSA - JTE - DN 400 M 42,11 789,15 33.231,11
Fonte: Saneago.