Kontrak

No. Pekerjaan Satuan


Volume

1 Concrete Class K250 (fc' 20) for minor concrete drainage structure M3 17.28
2 Reinforcing Steel for minor concrete drainage structures Kg 2,578.21
3 Pipa Berlubang Banyak (Perforated Pipe ) M1 3,306.00
4 Lapis Pondasi Agregat Kelas S M3 8,160.35
5 Beton mutu sedang, fc '25 MPa M3 29.12
6 Beton mutu sedang, fc '20 MPa M3 6,144.53
7 Structure Concrete fc '10 Mpa M3 18.25
8 Baja Tulangan U24 Polos Kg 1,756.08
9 Pasangan Batu M3 2,549.93
10 Sandaran (Railing) M1 12.00
11 Marka Jalan Termoplastik M2 7,266.13
12 Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 271.00
13 Guide Post Buah 191.00
14 Patok Kilometer buah 14.00
15 Rel Pengaman M1 605.00
16 Cat's Eyes buah 8,530.00
Kontrak Volume Yang Dikejakan
Harga Prestasi s/d Periode Yang Lalu Prestasi Periode ini
Satuan Jumlah Volume Jumlah Harga Volume Jumlah Harga
1,219,605.00 21,074,774.40
12,195.00 31,441,270.95
129,674.00 428,702,244.00
15,128.63 123,454,915.82
1,480,425.00 43,109,976.00
1,433,177.94 8,806,209,540.40
981,622.00 17,914,601.50
13,080.00 22,969,526.40
623,262.00 1,589,274,471.66
280,500.00 3,366,000.00
139,167.00 1,011,204,817.88
361,831.00 98,056,201.00
145,586.00 27,806,926.00
430,968.00 6,033,552.00
660,055.00 399,333,275.00
155,250.00 1,324,282,500.00
ejakan
Prestasi s/d Periode ini
Volume Jumlah Harga
HARGA
KODE URAIAN SATUAN VOLUME JUMLAH
SATUAN

ANS.8 Concrete Class K250 (fc' 20) for minor concrete drainage structure M3 Jumlah 955,703

Beton K-250 M3 1.010 799,000 806,990


Kayu Kelas II M3 0.027 2,500,000 67,500
Paku Kg 0.180 16,000 2,880
Bensin Lt 0.444 7,500 3,333
Cor Beton M3 1.000 35,000 35,000
Bekisting M2 1.000 40,000 40,000