SA_Tuna Project

Moorings Turnaround at Port Lincoln

Recovery

Monday 15th May 2006


Departed from Port Lincoln on the vessel Discovery Bay at approx 8:00 am. Wind 10-
15kts from NE with sloppy seas.

Arrived at Mooring 5 at approx 09:30 am, mooring would not release initially several
attempts were required. Mooring on board at 10:15 am.
There was significant fouling on the instruments and release mechanism.

Mooring 4 was found to be approx 1.3 kms from the nominated position. The mooring
position for the last 3 months was 34 38.137S 136 05.890E.

The sensors were covered in slime.

Data Recovery

Mooring1

#3028_M1_18052006_R.cap Recovery capture file

#3028_M1_18052006.asc Data file

Mooring 2

#3365_M2_150506R.cap Recovery capture file.

#3365_M2_15052006.asc Data File

Mooring 4

SBE 19+ #4537

#4537_M4_150506R.cap Recovery capture file.

#4537_M4_150506.hex Raw data file

#4537_M4_150506.cnv Converted file

ADCP #2388
Stopped logging 16:15 16/5/06
Data file :- DPL03000.000 (5.882Mb)

Mooring 5

SBE 19+ #4533

#4533_M5_150506R.cap Recovery capture file

#4533_M5_150506.hex Raw Data File

#4533_M5_150506.cnv Converted Data File

ASP-1041 Nortek
Stopped logging 09:30 16/5/2006. Raw Data file = ASP-1041_M5_16052006.prf.
External Battery = 12.3 volts..

Maintenance Work

The poison plugs were replaced on the SBE37’s for moorings 1&2.

Moorings were dismantled and initially cleaned with a water blaster.


Seabirds were dismantled, tubing and sensors cleaned and re-assembled.
Sacrificial anodes were replaced and all surfaces re coated with antifouling paint.

Mooring 4 SBE#4537 had damaged cables replaced. Batteries were replaced light and
fluorometer sensors were checked.
Release #30448 was tested.

Mooring 5 SBE#4533, found faulty Fluorometer cable connector. This was unable to be
repaired and the sensor was removed.
Release #30446 was tested.

Fluorometer Calibration
15:35 17/5/06 (06:05 UTC)

Instrument setup
Ncycles=2
Sampleinterval=30
Mooredtxrealtime=y
Outputformat=0 (raw hex)

Two sets of samples were set up for this calibration.


Mooring 4 sensor separate sample
Mooring 5&6 sensors together in separate sample.

1st sample 15:35 (06:05 UTC)


2nd sample 15:37 (06:07 UTC)
3rd sample 15:39 (06:09 UTC)

Cal Files

FLNTUS-97_Cal_17052006.hex

FLNTUS-96_Cal_17052006.hex

FLNTUS-403_Cal_17-052006.hex

Deployment

Mooring1
Mooring1 was recovered, serviced and deployed from the Discovery Bay.
Mooring deployed approx 17:40 18/5/2006.

#3028_M1_18052006_Dep.cap Deployment file

Mooring 2

The seabird SM37 was given back to SARDI for re-deployment on the eastern side of the
gulf.

Mooring 4

SBE 19+ #4537

#4537_M4_170506_Dep.cap Deployment File

ADCP Deployment start time 22:59:00 15/5/2006 UTC

Mooring 5

SBE 19+ #4533

#4533_M5_170506_Dep.cap Deployment File

ASP-1041 Deployment start time 00:25:31 UTC 16/5/06


Deployment file = DPL04

Mooring 6

SBE 19+ #4536

#4536_170506_DEP.cap Deployment file