DOC. NO.

PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

Uplift Check for Circular Sump

Total depth of water = 5.74 m

Total depth of Soil = 10.54 m

Unit weight of water = 10 kN/m3

Unit weight of soil = 16 kN/m3

Size of circular sump

Outer Dia of sump = 16.9 m

Inner Dia of Sump = 16 m

Overall Dia of Sump = 19.4 m

Outer Projection of base slab = 1.25 m

Thickness of base slab = 0.6 m

Thickness of roof slab = 0.15 m

Thickness of wall = 0.45 m

No. of Column = 6m

Size of Square Column = 0.3 m

Height of Column = 11.14 m

Upward Force

Area of sump = 295.4426 m2 (3.14 x 16.9 x 16.9 / 4)

Uplift force due to water = 16958.41 kN (295.4426 x 5.74 x 10)

Downward force

Weight of Base Slab = 4431.64 kN (3.14 x 16.9 x 16.9 x 0.6 x 25 / 4)


DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

Weight of Roof Slab = 753.6 kN (3.14 x 19.4 x 19.4 x 0.15 x 25 / 4)

Opening in Roof Slab = -136.69 kN

Weight of Wall = 6473.41 kN

Weight of soil = 12013.7 kN

Opening in Wall = -66.15 kN

No soil present in one side = -780.84 kN

Weight of column = 150.39 kN

Weight of beam = 155.25 kN

Total Downward force = 22994.31 kN

Factor of Safety

Factor of safety against uplift force = 1.36

The Structure is stable against uplift


DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title
DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

Uplift Check for Mechanical Sump

Total depth of water = 6.63 m

Total depth of soil = 6.63 m

Unit weight of water = 10 kN/m3

Unit weight of soil = 16 kN/m3

Unit weight of concrete = 25 kN/m3

Size of circular sump

Length of sump = 9.7 m

Width of Sump = 5.7 m

Outer Projection of base slab = 0.75 m

Thickness of base slab = 0.4 m

Thickness of roof slab = 0.15 m

Thickness of wall = 0.4 m

Upward Force

Area of base contact = 75.24 m2

Uplift force due to water = 4988.412 kN

Downward force

Weight of Base Slab = 752.4 kN

Weight of Roof Slab 1 = 34.3 kN

Weight of Roof Slab 2 = 29.43 kN

Weight of outer Wall for Height = 1785.81 kN


DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

Weight of Soil on longer side = 1965.132 kN

Weight of inner wall 1 = 137.94 kN

Weight of inner wall 2 = 155 kN

Total Downward force = 4860.01 kN

Factor of Safety

Factor of safety against uplift force = 0.97

Redesign
DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title
DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

Uplift Check for Circular Sump

Depth of water = 5.74 m At a level of +7.8m

12.8 - 5 - 2.66 + 0.6

Total depth of Soil = 10.54 m

13.2 - 2.66

Unit weight of water = 10 kN/m3

Unit weight of soil = 16 kN/m3

Unit weight of concrete = 25 kN/m3

Size of circular sump

Inner Dia of Sump = 16 m

Outer Dia of sump = 16.9 m


16 + 2 x 0.45

Overall Dia of Sump = 19.4 m


16.9 + 2 x 1.25

Outer Projection of base slab = 1.25 m

Thickness of base slab = 0.6 m

Thickness of roof slab = 0.15 m

Thickness of wall = 0.45 m

No. of Column = 6m

Size of Square Column = 0.3 m

Height of Column = 10.99 m


(13.8 -2.66 - 0.15)

Uplift Force

Area of sump = 295.44 m2

(3.14 x 19.4 x 19.4 / 4)

Uplift force due to water = 16958.26 kN


DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

(295.44 x 5.74 x 10)

Downward force

Weight of Base Slab = 4431.64 kN

(3.14 x 16.9 x 16.9 x 0.6 x 25 / 4)

Weight of Roof Slab = 753.6 kN

(3.14 x 19.4 x 19.4 x 0.15 x 25 / 4)

Opening in Roof Slab = -138.8 kN


-(13.5 x2.7 x 0.15 x 25) + (0.75 x 0.75 x 0.15x25)

Weight of Wall = 6386.25 kN


3.14 x ((16.9^2/4) - (16^2/4))x(11.14-0.15)x25

Weight of soil = 12013.7 kN


(3.14 x (((19.4^2/4)-(16.9^2/4))) x 10.54 x 16)

Opening in Wall = -66.15 kN


-(1.4 x 1.4 x 0.45 x 25 x 3) -66.15

No soil present in one side = -784.3 kN


-(5.5 x1.25 x 7.13 x 16)

Weight of column = 148.365 kN


(6 x 0.3 x 0.3 x 10.99 x 25)

Weight of beam = 155.25 kN


(60 x 0.23 x 0.45 x 25)

Total Downward force = 22899.56 kN

(4431.64 + 753.6 -138.8 + 6386.25 + 12013.7 -66.15 -784.3 + 148.365 + 155.25)

Factor of Safety

Factor of safety against uplift force = 1.35


(22899.56 / 16958.26)

The Structure is stable against uplift


DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
Project : Construction of Decentralized Sewage DOCUMENT NO. REV
Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing
0
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works,
O&M for a period of 5 years complete, in Nellore DESIGNED CHECKED APPROVED SHEET
Municipal Corporation.
Title : Design Calculation for 55 MLD Transformer Yard at
VJ VJ MGK
Allipuram

TABLE OF CONTENTS

I Design Basis

II Load Details & Calculations

III Staad Inputs

IV Design of Structural Elements


L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving
sumps cum pumping stations, Providing Sewer Network
stem in entire city including construction of Conventional 0
Manholes & Precast Manholes, House Sewer Connections
and Allied Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at


Allipuram
VJ VJ MGK 1

I.DESIGN BASIS
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving
sumps cum pumping stations, Providing Sewer Network
stem in entire city including construction of Conventional 0
Manholes & Precast Manholes, House Sewer Connections
and Allied Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at


Allipuram
VJ VJ MGK 2

1.1 General

This document covers the design of Transformer Yard located in 55 MLD STP at
Allipuram.
It consist of following structural components
a) Foundation & column of Two-Pole Structure
b) Foundation design of Transformer

All the components are designed using Limit State Method & Working Stress Method if required.

1.2 References

a) IS 456-2000 Code of Plain cement and Reinforced Concrete


b) IS 875-1987 (Part:1-4) Code of Practice for Design Loads (other than Earthquake )for
buildings and Structures
c) IS:1893 (Part I) - Code of Practice for Earthquake Resistant Design of Structures
d) IS 802-1995(Part 1) Use of Strucutral Steel in Overhead Transmission Line Towers

1.3 Material Properties

a) Grade of Concrete M 20,


b) Grade of Steel Fe 500,
c) Safe Bearing Capacity of the Soil Considered 150kN/m2

1.4 Cover Details

a) Footing 50mm
b) Pedestal & Column 40mm

1.5 Units of Measurement and Software Used

Units of Measurement in all Design calculations shall is in SI System and Staad Pro V8i
is used for analysis purpose.

1.6 Reference Document/Drawings


L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving
sumps cum pumping stations, Providing Sewer Network
stem in entire city including construction of Conventional 0
Manholes & Precast Manholes, House Sewer Connections
and Allied Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at


Allipuram
VJ VJ MGK 3

II LOAD DETAILS & CALCULATIONS


II LOAD DETAILS & CALCULATIONS
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving
sumps cum pumping stations, Providing Sewer Network
stem in entire city including construction of Conventional 0
Manholes & Precast Manholes, House Sewer Connections
and Allied Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at


Allipuram
VJ VJ MGK 4

2.1 Dead Loads

Apart from the self Weight of the Structural elements ,electrical component weights
are considered as Dead Load.

Weight of the Isolator = 45 kg(9 Nos)


Weight of the Isolator Set(3Nos together) = 0.15 k N
Weight of Lightning arrestor = 5 kg
= 0.05 k N

2.2 Live Load

All additional weights are considered as Dead Load and hence no live load is applied .

2.3 Wind Load

Basic Wind Speed = 50 m/s


As per Fig.1 of IS 802 , the area falls under Wind Zone = 5
Reliabiltity Level = 1
Terrain Catergory = 2
Metrological ref., wind Speed = 36.36 m/s
Design Wind Pressure = 72.73 m/s
Design Wind Pressure (As per Table 4 of IS 802), = 3174 N/m2

Wind Load on Isolator


Drag Coefficient = 1.2 m/s
(From IS 802 Clause 9.2)
Span of the Conductor = 0.508 Electrical Input
Diameter of the Conductor = 160 Electrical Input
Gust Response Factor = 1.92
(From IS 802 Table.6)
Wind Load on Isolator = 0.297 k N

Wind Load on Lightning Arrestor


Drag Coefficient = 1.2 m/s
(From IS 802 Clause 9.2)
Span of the Conductor = 0.405 Electrical Input
Diameter of the Conductor = 173 Electrical Input
Gust Response Factor = 1.92
(From IS 802 Table.6)
Wind Load on Isolator = 0.256 k N
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving
sumps cum pumping stations, Providing Sewer Network
stem in entire city including construction of Conventional 0
Manholes & Precast Manholes, House Sewer Connections
and Allied Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at


Allipuram
VJ VJ MGK 4

Wind Load on Frame

Vertical member = RSJ 175X90


Depth = 175
Width = 90
Force Co-efiicient = 1.9
(Solidity ratio has been as considered as 0.1)
Force on Structure = 1.0552 kN/m

2.4 Seismic Force

The seismic load on the structure is calculated as per IS 1893-2002,the structure is located in
Zone III of seismic map of India.
Zone factor = 0.16
Response Reduction Factor = 1.5
Importance Factor = 1
Damping ratio = 5%
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving
sumps cum pumping stations, Providing Sewer Network
stem in entire city including construction of Conventional 0
Manholes & Precast Manholes, House Sewer Connections
and Allied Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at


Allipuram
VJ VJ MGK 4
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants
with any proven Technology including receiving sumps cum
pumping stations, Providing Sewer Network stem in entire city
0
including construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, O&M for a
period of 5 years complete, in Nellore Municipal Corporation.
DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at Allipuram VJ VJ MGK 5

III STAAD DETAILS


III STAAD DETAILS
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants
with any proven Technology including receiving sumps cum
pumping stations, Providing Sewer Network stem in entire city
0
including construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, O&M for a
period of 5 years complete, in Nellore Municipal Corporation.
DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at Allipuram VJ VJ MGK 5


L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants
with any proven Technology including receiving sumps cum
pumping stations, Providing Sewer Network stem in entire city
0
including construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, O&M for a
period of 5 years complete, in Nellore Municipal Corporation.
DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at Allipuram VJ VJ MGK 6


L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants
with any proven Technology including receiving sumps cum
pumping stations, Providing Sewer Network stem in entire city
0
including construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, O&M for a
period of 5 years complete, in Nellore Municipal Corporation.
DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at Allipuram VJ VJ MGK 6

STAAD INPUT DETAILS


L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants
with any proven Technology including receiving sumps cum
pumping stations, Providing Sewer Network stem in entire city
0
including construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, O&M for a
period of 5 years complete, in Nellore Municipal Corporation.
DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at Allipuram VJ VJ MGK 6


L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants
with any proven Technology including receiving sumps cum
pumping stations, Providing Sewer Network stem in entire city
0
including construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, O&M for a
period of 5 years complete, in Nellore Municipal Corporation.
DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at Allipuram VJ VJ MGK 7

Load Details

DEFINE 1893 LOAD


ZONE 0.16 RF 1 I 1.5 SS 1 ST 1 DM 0.05 DT 1.5
SELFWEIGHT 1
MEMBER WEIGHT
9 CON 0.15 0.625
9 CON 0.15 1.525
9 CON 0.15 2.15
10 CON 0.057 0.625
10 CON 0.057 1.525
10 CON 0.057 2.15
LOAD 1 LOADTYPE Seismic TITLE SL X
1893 LOAD X 1
PERFORM ANALYSIS
CHANGE
LOAD 2 LOADTYPE Seismic TITLE SL -X
1893 LOAD X -1
PERFORM ANALYSIS
CHANGE
LOAD 3 LOADTYPE Seismic TITLE SL Z
1893 LOAD Z 1
PERFORM ANALYSIS
CHANGE
LOAD 4 LOADTYPE Seismic TITLE SL -Z
1893 LOAD X -1
PERFORM ANALYSIS
CHANGE
LOAD 5 LOADTYPE Dead TITLE DL
SELFWEIGHT Y -1
MEMBER LOAD
9 CON GY -0.15 0.625
9 CON GY -0.15 1.525
9 CON GY -0.15 2.425
10 CON GY -0.057 2.425
10 CON GY -0.057 1.525
10 CON GY -0.057 0.625
LOAD 6 LOADTYPE Wind TITLE WL X
MEMBER LOAD
3 4 7 8 UNI GX 1.06
9 CON GX 0.293 0.625
9 CON GX 0.293 1.525
9 CON GX 0.293 2.425
10 CON GX 0.253 0.625
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants
with any proven Technology including receiving sumps cum
pumping stations, Providing Sewer Network stem in entire city
0
including construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, O&M for a
period of 5 years complete, in Nellore Municipal Corporation.
DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at Allipuram VJ VJ MGK 7

10 CON GX 0.253 1.525


10 CON GX 0.253 2.425
LOAD 7 LOADTYPE Wind TITLE WL -X
MEMBER LOAD
3 4 7 8 UNI GX -1.06
9 CON GX -0.293 0.625
9 CON GX -0.293 1.525
9 CON GX -0.293 2.425
10 CON GX -0.253 0.625
10 CON GX -0.253 1.525
10 CON GX -0.253 2.425
LOAD 8 LOADTYPE Wind TITLE WL Z
MEMBER LOAD
7 8 UNI GZ 1.06
9 CON GZ 0.293 0.625
9 CON GZ 0.293 1.525
9 CON GZ 0.293 2.425
10 CON GZ 0.253 0.625
10 CON GZ 0.253 1.525
10 CON GZ 0.253 2.425
LOAD 9 LOADTYPE Wind TITLE WL-Z
MEMBER LOAD
3 4 UNI GZ -1.06
9 CON GZ -0.293 0.625
9 CON GZ -0.293 1.525
9 CON GZ -0.293 2.425
10 CON GZ -0.253 0.625
10 CON GZ -0.253 1.525
10 CON GZ -0.253 2.425
LOAD COMB 101 DL+SL X
5 1.0 1 1.0
LOAD COMB 102 DL+SL -X
5 1.0 2 1.0
LOAD COMB 103 DL+SL Z
5 1.0 3 1.0
LOAD COMB 104 DL+SL -Z
5 1.0 4 1.0
LOAD COMB 105 DL+WL X
5 1.0 6 1.0
LOAD COMB 106 DL+WL -X
5 1.0 7 1.0
LOAD COMB 107 DL+WL Z
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants
with any proven Technology including receiving sumps cum
pumping stations, Providing Sewer Network stem in entire city
0
including construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, O&M for a
period of 5 years complete, in Nellore Municipal Corporation.
DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at Allipuram VJ VJ MGK 7

5 1.0 8 1.0
LOAD COMB 108 DL+WL -Z
5 1.0 9 1.0
LOAD COMB 201 DL+SL X
5 1.5 1 1.5
LOAD COMB 202 DL+SL -X
5 1.5 2 1.5
LOAD COMB 203 DL+SL Z
5 1.5 3 1.5
LOAD COMB 204 DL+SL -Z
5 1.5 4 1.5
LOAD COMB 205 DL+WL X
5 1.5 6 1.5
LOAD COMB 206 DL+WL -X
5 1.5 7 1.5
LOAD COMB 207 DL+WL Z
5 1.5 8 1.5
LOAD COMB 208 DL+WL -Z
5 1.5 9 1.5
Public Health and Municipa
L&T Construction
Engineering Department
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any Document No
proven Technology including receiving sumps cum pumping stations, providing

Sewer Network stem in entire city including construction of conv, manholes

Conventional Manholes & Precast Manholes, House Sewer Connections DESND CHKD APPRD
Allied Works, O&M for a period of 5 years complete, in Nellore Municipal
VJ VJ MGK
Title : Design Calculation for 55 MLD Transformer Yard at Allipuram

DESIGN OF ISOLATED FOOTING FOR NODE 11&12 FOOTING MARK F1


Design Parameters :

Grade of concrete = M 30 N/mm2 l=


Grade of reinforceme = Fe 500 N/mm 2
400
H = 1500
Clear cover to main reinf. = 50 mm
Safe bearing capacity = 100 kN/m2 300
Density of concrete = 25 kN/m 3

Dimensional details :
Length of column along x-axis, l 400 mm
Length of column along z-axis, b = 400 mm
Length of footing along z-axis, B 1800 mm 700 l= 400
Length of footing along x-axis, L 1800 mm
Thk. of footing at face of column, 300 mm z

Thk. of footing at ends 300 mm


Depth of foundation(below G.L) , 1500 mm
Surcharge = 0 kN/m2
Unit weight of soil = 17 kN/m3 x
L
Footing Parameters : 1800

Proposed dia of reinf.along Z-axis 10 mm


Proposed dia of reinf.along X-axis 10 mm
Eff. depth at face of column in X ,d X = 235 mm
Eff. depth at face of column in Z ,d Z = 245 mm

B= 1800
Selfweight of substructure:

Weight of footing = 1800 x 1800 x (300 + 300) x 1/2 x 25 / 10^9 = 24.30 kN


Public Health and Municipa
L&T Construction
Engineering Department
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any Document No
proven Technology including receiving sumps cum pumping stations, providing

Sewer Network stem in entire city including construction of conv, manholes

Conventional Manholes & Precast Manholes, House Sewer Connections DESND CHKD APPRD
Allied Works, O&M for a period of 5 years complete, in Nellore Municipal
VJ VJ MGK
Title : Design Calculation for 55 MLD Transformer Yard at Allipuram

Weight of overburden soil = (1.8 x 1.8 - 0.4 x 0.4) x (1.2 - 0.3) x 17 = 47.13 kN
Surcharge = 0.00 kN
Total load = 71.43 kN

Computation of gross pressure & check against gross safe bearing capacity :

Load Total P
L/C P (kN) Mx (kN.m) Mz (kN.m) P1 (kN/m2) P6 (kN/m2) P11 (kN/m2) P16 (kN/m2)
Factor (kN)

1 1.5 9.216 0 0 80.65 24.9 24.9 24.9 24.9

101 1.5 9.216 0 11.84 80.65 12.71 37.08 37.08 12.71

102 1.5 9.216 0 -11.84 80.65 37.08 12.71 12.71 37.08

103 1.5 9.216 -11.995 0 80.65 12.56 12.56 37.24 37.24

104 1.5 9.216 0 -11.84 80.65 37.08 12.71 12.71 37.08

105 1.5 9.216 0 41.99 80.65 18.31 68.1 68.1 18.31

106 1.5 9.216 0 -41.99 80.65 68.1 18.31 18.31 68.1

107 1.5 9.216 -31.334 0 80.65 7.35 7.35 57.13 57.13

108 1.5 9.216 31.282 0 80.65 57.08 57.08 7.3 7.3


z
p16 p15 p14 p13 p12 p11

p17 p10 All pressures are

p24
p18 p23
B p9 x
1800
p19 p21 p22 p8

p20 p7

p1 p2 p3 p4 p5 p6
Public Health and Municipa
L&T Construction
Engineering Department
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any Document No
proven Technology including receiving sumps cum pumping stations, providing

Sewer Network stem in entire city including construction of conv, manholes

Conventional Manholes & Precast Manholes, House Sewer Connections DESND CHKD APPRD
Allied Works, O&M for a period of 5 years complete, in Nellore Municipal
VJ VJ MGK
Title : Design Calculation for 55 MLD Transformer Yard at Allipuram

L = 1800

L/C p2 = p3 = p4 = p5= p7 = p8 = p9 = p10 =


1 25 25 25 25 25 25 25 25
101 19 22 28 31 37 37 37 37
102 31 28 22 19 13 13 13 13
103 13 13 13 13 19 22 28 31
104 31 28 22 19 13 13 13 13
105 31 38 49 55 68 68 68 68
106 55 49 38 31 18 18 18 18
107 7 7 7 7 20 27 38 44
108 57 57 57 57 44 38 27 20

L/C p14 = p15= p17 = p18 = p19 = p20 = p21 = p22 =


1 25 25 25 25 25 25 25 25
101 22 19 13 13 13 13 22 28
102 28 31 37 37 37 37 28 22
103 37 37 31 28 22 19 22 22
104 28 31 37 37 37 37 28 22
105 38 31 18 18 18 18 38 49
106 49 55 68 68 68 68 49 38
107 57 57 44 38 27 20 26 26
108 7 7 20 27 38 44 38 38

Downward pressure due to substructure load = 71.43 / (1.8 x 1.8) = 22.05 kN/m2

Bottom Reinforcement in Z-Direction


+ve Z-Direction -ve Z-Direction

Pr at col Mu,z at col Pr at col Mu,z at col


L/C Pr at edge Pr at edge
face face (kN.m) face face (kN.m)

1 25.00 25.00 1.95 25.00 25.00 1.95


101 28.00 28.00 3.93 28.00 28.00 3.93
102 28.00 28.00 3.93 28.00 28.00 3.93
Public Health and Municipa
L&T Construction
Engineering Department
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any Document No
proven Technology including receiving sumps cum pumping stations, providing

Sewer Network stem in entire city including construction of conv, manholes

Conventional Manholes & Precast Manholes, House Sewer Connections DESND CHKD APPRD
Allied Works, O&M for a period of 5 years complete, in Nellore Municipal
VJ VJ MGK
Title : Design Calculation for 55 MLD Transformer Yard at Allipuram

103 22.00 13.00 -4.005 28.00 37.00 7.905


104 28.00 28.00 3.93 28.00 28.00 3.93
105 49.00 49.00 17.82 49.00 49.00 17.82
106 49.00 49.00 17.82 49.00 49.00 17.82
107 26.00 7.00 -5.76 38.00 57.00 18.93
108 38.00 57.00 18.93 26.00 7.00 -5.76

Design Eff width Ast,min


L/C Ast,z (mm2) Ast req Spacing req Bar dia Spacing pro
Mu (mm) (mm2)
1 1.95 575 18 648 648 218.17 10 200
101 3.93 575 37 648 648 218.17 10 200
102 3.93 575 37 648 648 218.17 10 200
103 7.905 575 75 648 648 218.17 10 200
104 3.93 575 37 648 648 218.17 10 200
105 17.82 575 171 648 648 218.17 10 200
106 17.82 575 171 648 648 218.17 10 200
107 18.93 575 182 648 648 218.17 10 200
108 18.93 575 182 648 648 218.17 10 200

Bottom Reinforcement in X-Direction

+ve X-Direction -ve X-Direction

Pr at col Mu,x at col Pr at col Mu,z at col


L/C Pr at edge Pr at edge
face face (kN.m) face face (kN.m)

1 25 25 1.95 25.00 25.00 1.95


101 28 37 7.905 22.00 13.00 -4.005
102 22 13 -4.005 28.00 37.00 7.905
103 28 28 3.93 28.00 28.00 3.93
104 22 13 -4.005 28.00 37.00 7.905
105 49 68 26.205 38.00 18.00 1.725
106 38 18 1.725 49.00 68.00 26.205
107 38 38 10.545 38.00 38.00 10.545
Public Health and Municipa
L&T Construction
Engineering Department
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any Document No
proven Technology including receiving sumps cum pumping stations, providing

Sewer Network stem in entire city including construction of conv, manholes

Conventional Manholes & Precast Manholes, House Sewer Connections DESND CHKD APPRD
Allied Works, O&M for a period of 5 years complete, in Nellore Municipal
VJ VJ MGK
Title : Design Calculation for 55 MLD Transformer Yard at Allipuram

108 38 38 10.545 38.00 38.00 10.545

Design Eff width Ast,min


L/C Ast,x (mm2) Ast req Spacing req Bar dia Spacing pro
Mu (mm) (mm2)
1 1.95 575 19 648 648 218.17 10 200
101 7.905 575 78 648 648 218.17 10 200
102 7.905 575 78 648 648 218.17 10 200
103 3.93 575 39 648 648 218.17 10 200
104 7.905 575 78 648 648 218.17 10 200
105 26.205 575 265 648 648 218.17 10 200
106 26.205 575 265 648 648 218.17 10 200
107 10.545 575 105 648 648 218.17 10 200
108 10.545 575 105 648 648 218.17 10 200

Top Reinforcement

Mu,z at
Ast,z Ast,z,min Spacing Mu,x at col Ast,x Ast,x,min
col face Bar dia Bar dia
(mm2) (mm2) req (mm) face (kN.m) (mm2) (mm2)
(kN.m)
0 0 324 8 279 0 0 324 8

Check for One Way Shear

Max Vu d at sec tv (N/mm2) tc (N/mm2)


L/C Vu,z (kN) Vu,x (kN) Check
(kN) (mm)
1 3.64 3.64 3.64 300 0.007 0.3 OK
Public Health and Municipa
L&T Construction
Engineering Department
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any Document No
proven Technology including receiving sumps cum pumping stations, providing

Sewer Network stem in entire city including construction of conv, manholes

Conventional Manholes & Precast Manholes, House Sewer Connections DESND CHKD APPRD
Allied Works, O&M for a period of 5 years complete, in Nellore Municipal
VJ VJ MGK
Title : Design Calculation for 55 MLD Transformer Yard at Allipuram

101 3.64 15.05 15.05 300 0.028 0.3 OK


102 3.64 15.05 15.05 300 0.028 0.3 OK
103 15.15 3.64 15.15 300 0.028 0.3 OK
104 3.64 15.05 15.05 300 0.028 0.3 OK
105 26.43 49.59 49.59 300 0.092 0.3 OK
106 26.43 49.59 49.59 300 0.092 0.3 OK
107 35.8 12.64 35.8 300 0.066 0.3 OK
108 35.77 12.61 35.77 300 0.066 0.3 OK

Check for Punching Shear

Punching area, Ap = 3.24 - 0.4 = 2.84 m2


Avg depth at d/2 from face = 240 mm
Area resisting punching shear, Aps = 0.61 m2

tc, all
L/C Vup (kN) tcp (N/mm2) Check
(N/mm2)
1 12.135 0.02 1.369 OK
101 12.12 0.02 1.369 OK
102 12.12 0.02 1.369 OK
103 12.135 0.02 1.369 OK
104 12.12 0.02 1.369 OK
105 90.12 0.148 1.369 OK
106 90.12 0.148 1.369 OK
107 43.41 0.071 1.369 OK
108 43.2 0.071 1.369 OK
Public Health and Municipal

Engineering Department

Rev

SHEET

1200

D=
300

700

700

b =
400

700
Public Health and Municipal

Engineering Department

Rev

SHEET

Check
Gross SBC
for
(kN/m2)
SBC
125.50 OK

125.50 OK

125.50 OK

125.50 OK

125.50 OK

125.50 OK

125.50 OK

125.50 OK

125.50 OK

All pressures are in kN/m2


Public Health and Municipal

Engineering Department

Rev

SHEET

p12= p13 =
25 25
31 28
19 22
37 37
19 22
55 49
31 38
57 57
7 7

p23 = p24 =
25 25
28 22
22 28
28 28
22 28
49 38
38 49
38 38
26 26
Public Health and Municipal

Engineering Department

Rev

SHEET

Ast
Check
provided
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK
Public Health and Municipal

Engineering Department

Rev

SHEET

Ast
Check
provided
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK
706.86 OK

Spacing
Check
req (mm)

279 OK
Spacing pro Ast pro
250 361.91
Public Health and Municipal

Engineering Department

Rev

SHEET

6
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving sumps
cum pumping stations, Providing Sewer Network stem in
entire city including construction of Conventional Manholes & 0
Precast Manholes, House Sewer Connections and Allied
Works, O&M for a period of 5 years complete, in Nellore
Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD RSPH at Allipuram VJ VJ MGK


Design of Columns

The design of column member has been taken directly from Staad Pro.The output is presented
below

Column Summary

Support Size Ast req., Min% Ast Ast Pro Dia used Ties Spacing

11 0.4*0.4 686 0.80% 1256 20 8 200


12 0.4*0.4 686 0.80% 1256 20 8 200
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving
sumps cum pumping stations, Providing Sewer Network
stem in entire city including construction of Conventional 0
Manholes & Precast Manholes, House Sewer Connections
and Allied Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at


VJ VJ MGK
Allipuram

Design of Foundation for Transformer

Length of the foundation block required = 2.2 m


Breadth of Foundation block required = 1.3 m
Depth above Natural Ground Level = 1m
Depth below Natural Ground Level = 1m
Overall depth of Foundation block = 2m
Charateristic compressive strength of the concrete = 25 N/mm2
Grade of Steel = 500 N/mm2
Density of Concrete = 25 k N/m2
Unit Weight of the soil = 17 k N/m3
Net SBC = 100 k N /m2
Gross SBC = 125.5 k N /m2
Load Calculation
Self Weight of the block = 143 k N
Weight acting on the block = 64.5 k N
Total Load = 207.5 k N
Factore Load = 311.25 k N
Check for Base Pressure = 108.83 k N

108.83 < 125.5

Hence Safe
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving
sumps cum pumping stations, Providing Sewer Network
stem in entire city including construction of Conventional 0
Manholes & Precast Manholes, House Sewer Connections
and Allied Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at


VJ VJ MGK
Allipuram
L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department

Project : Construction of Decentralized Sewage Treatment DOCUMENT NO. REV


Plants with any proven Technology including receiving
sumps cum pumping stations, Providing Sewer Network
stem in entire city including construction of Conventional 0
Manholes & Precast Manholes, House Sewer Connections
and Allied Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation. DESD., CHKD., APPRD., SHEET

Title : Design Calculation for 55 MLD Transformer Yard at


VJ VJ MGK
Allipuram

Design for Skin Reinforcement

Minimum reinforcement required as per Clause 26.5.3 of IS456 for Pedestal

Minimum Ast Required (0.15%) 0.15*2200*1300 = 4290 mm2

As per clause 26.5.3 of IS 456 -2000 spacing of longitudinal bar along the pheriphery of the col.,
shall not exceed 300 mm c/c

Hence
Provide 16mm diameter bar@200 mmc/c

Provide 10 mm diameter ties @200 mmc/c


DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

Uplift Check for Circular Sump

Depth of water = 6.34 m

13.8-5.4-2.66 + 0.6

Total depth of Soil = 10.54 m

13.2 - 2.66

Unit weight of water = 10 kN/m3

Unit weight of soil = 18 kN/m3

Unit weight of concrete = 25 kN/m3

Size of circular sump

Inner Dia of Sump = 16 m

Outer Dia of sump = 16.9 m


16 + 2 x 0.45

Overall Dia of Sump = 19.4 m


16.9 + 2 x 1.25

Outer Projection of base slab = 1.25 m

Thickness of base slab = 0.6 m

Thickness of roof slab = 0.15 m

Thickness of wall = 0.45 m

No. of Column = 6m

Size of Square Column = 0.45 m

Height of Column = 10.99 m


(13.8 -2.66 - 0.15)

Uplift Force

Area of sump = 295.44 m2

(3.14 x 19.4 x 19.4 / 4)

Uplift force due to water = 18730.9 kN


DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

(295.44 x 6.34 x 10)

Downward force

Weight of Base Slab = 4431.64 kN

(3.14 x 16.9 x 16.9 x 0.6 x 25 / 4)

Weight of Roof Slab = 753.6 kN

(3.14 x 19.4 x 19.4 x 0.15 x 25 / 4)

Opening in Roof Slab = -138.8 kN


-(13.5 x2.7 x 0.15 x 25) + (0.75 x 0.75 x 0.15x25)

Weight of Wall = 6386.25 kN


3.14 x ((16.9^2/4) - (16^2/4))x(11.14-0.15)x25

Weight of soil = 13515.42 kN


(3.14 x (((19.4^2/4)-(16.9^2/4))) x 10.54 x 18)

Opening in Wall = -66.15 kN


-(1.4 x 1.4 x 0.45 x 25 x 3)

No soil present in one side = -882.3375 kN


-(5.5 x1.25 x 7.13 x 18)

Weight of column = 333.82125 kN


(6 x 0.45 x 0.45 x 10.99 x 25)

Weight of beam = 103.5 kN


(60 x 0.23 x (0.45 -0.15)x 25)

Total Downward force = 24436.94 kN

(4431.64 + 753.6 -138.8 + 6386.25 + 13515.42 -66.15 -882.3375 + 333.82125 + 103.5)

Factor of Safety

Factor of safety against uplift force = 1.3


(24436.94 / 18730.9)

The Structure is stable against uplift


DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title
DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

Uplift Check for Mechanical Screen

Total depth of water = 6.73 m

(12.8 - 6.57 + 0.5)

Total depth of soil = 6.63 m

(13.2 - 6.57)

Unit weight of water = 10 kN/m3

Unit weight of soil = 18 kN/m3

Unit weight of concrete = 25 kN/m3

Size of circular sump

Length of sump = 10.4 m


(9.9 + 0.5)

Width of Sump = 5.9 m

Outer Projection of base slab = 1.5 m

Thickness of base slab = 0.5 m

Thickness of roof slab = 0.15 m

Thickness of wall = 0.5 m


(4.9 + 0.5 + 0.5)

Uplift Force

Area of base contact = 105.91 m2


(10.4 + 1.5) x (5.9 + (2 x 1.5))

Uplift force due to water = 7127.743 kN


(105.91 x 6.73 x 10)

Downward force

Weight of Base Slab = 1323.875 kN


(10.4 + 1.5)*(5.9 + (2 x 1.5)) x (0.5 x 25)
DOC. NO.
PROJECT

Rev. No Page
STRUCTURE

DESN CHKD
Title

Weight of Roof Slab 1 = 34.3 kN


(4.9 x 1.4 x 0.2 x 25)

Weight of Roof Slab 2 = 29.43 kN


(2.18 x 3.6) x 0.15 x 25

Weight of outer Wall for Height = 2322.64 kN


((10.4 + 10.4 + 4.9)*0.5 x 7.23 x 25)

Weight of Soil on longer side = 4600.557 kN


(10.4 + 10.4 + 4.9) x 1.5 x (13.2 - 6.57) x 18

Weight of inner wall 1 = 137.94 kN


(4.9 x 0.2 x 5.63) x 25

Weight of inner wall 2 = 155 kN


(2 x 6.2 x 0.2 x 2.5) x 25

Total Downward force = 8603.74 kN


(1323.875 + 34.3 + 29.43 + 2322.64 + 4600.557 + 137.94 + 155)

Factor of Safety

Factor of safety against uplift force = 1.21


(8603.74 / 7127.743)

The Structure is stable against uplift