Documente Academic
Documente Profesional
Documente Cultură
6345 2400
3550 2400
J J
INTEGRAL PERIMETER
CONCRETE
5925
HOB (CH) HEIGHT: 150
6825
WIDE: 125
500
1465
3285 2240
1165
200 PC
2300 200 3550 2400 150
FALL
1:80
Col.
MECH.
H1 PC H1
820
FALL PENETRATION
820
150
150
65
900
900
1:80
PC
H 200
SSL
H
280
155
PC
MECH. 200
65.500 PENETRATION 1220
2862 2862
SHOWN
3478
ELEC INDICATIVE
5050
3413
LIFTS ONLY
4100
4100
OVERFLOW
2 FALL (O.F.)
500x150 SSL 1:80
PENETRATION 65.440
1800
OVERFLOW SSL
CONC.
O
(O.F.) PC
O
65.440
250
165
RW
PLINTH
RW
200
50
FOR
S-
8400
G1 G1
S-
MECH.
820 400
1400 2400 EQIPMENT
HOB NOTES:
1000
3478
SSL 65.600
LEVEL 07 SLAB
3413
EDGE BELOW
STAIR 2
2650
2250
PC CH-100: 100h x 100w
200
A-321 CONC.
CONCRETE HOB
1450
CH-150: 100h x 150w
4300
4300
4010
PLINTH
FOR HOB CONCRETE HOB
MECH. SSL
1600 2400 EQIPMENT PLINTHS SHOWN
SSL 65.600 INDICATIVE ONLY.
65.650
200
SSL FINAL SIZES AND 820 500
125
LOCATIONS TO BE
65.500
G HOB
COORDINATED
WITH MECHANICAL
G
TYP. Col. Col.
BELOW SUBCONTRACTOR BELOW
SSL 65.650
5013
4262 4262 4553 4553 945
4285
4434 3766 664
13
SSL 65.440
O
O
(O.F.) 65.500 65.440
W
RW
66
FALL
R
OVERFLOW
8400
8400
S-
S-
0 1:80
1 22 SIPHONIC (O.F.)
SSL RAINWATER
TOWER CL
3030 65.500 OUTLET (S-RWO)
30 CRANE 600 1934
1157 1035 2400 1135 2920 3874 633 3664 3227 1307 3666 2508 2037 LOCATION
35
62
5013
MECH.
66
Col.
1400
3655 CL
PENETRATION CONSTRUCTION JOINT (TBC)
4115
30
4595
19
0 0
4030 359 31
0
2500
92° 92°
1957
1809
℄ 1245
1685
1556
2 90° C
1368
1068
H
-1 Col.
150
00 ALIMAK
445
BELOW
87
F F
1095
414
LOCATION
885
785
CH-100
7
452
650
650
650
650
800
800
137
72
650
Col. ELEC 2190
488
CH-100
230
300
℄
2075 CH-100 CH-100 CH-100 SSL
625
850
Col. Col.
1085
250 250
E E
-1
65.500
1495
400
1465
H
1735
C
CL
4137
800 Col.
INTEGRAL CONCRETE PC
3245
SSL
75
3400
250 250 1000x150 HOB (CH-100) HEIGHT: 100 200
1665
CH-100
Col.
1200
356
PC
200
250
D1
825
4130
6150
2344 1573
LEVEL 07 SLAB
EDGE BELOW
MECH. OVERFLOW SSL SSL OVERFLOW
PC PENETRATION O SSL 65.440
O
150 (O.F.) 65.500 65.440 (O.F.)
RW
7600
7600
RW
250
7925
1280
S-
PC 200
2320
1054
LV.10 530
2550
CH-100
200
STAIR 3
2250
2650
700x150 A-322 PC HOB
CH-150
5000
5000
1290
4137
3715
2 PENETRATION
4819
150
MECHANICAL
110 50 1000 OPENING CH-100
EXTENT OF
1280
2035
150 AT LEVEL 10 ONLY PRECAST BELOW
C1 BUILDING C
1725
PC INTEGRAL CONCRETE
1875
2190
1775
PC
100
200 HOB (CH-100) HEIGHT: 100
1470 4515 2205 750 200
WIDE: 100
625
610
50
POSITION
175
C TYP. Col.
900
LEVELS
CH-100
LEVEL 08
8 & 10
BELOW
125
570 PC SSL
150
600 600
1795
SSL 65.650
1860
65.500
LV.10 PC PC
STAIR 1 ROOF
3560
150 250
BUILDING B
POSITION
CH-100
9
LEVEL
600
4263
PC PC FALL
1500
3345
LV.10 SSL CONCRETE
HOB (CH) HEIGHT: 150
65.500
MECHANICAL
OPENING
970 2400 1100 LEVEL 08/09/10 WIDE: 125
8400
7985
250
O SSL 65.440 O
(O.F.) 65.500 65.440
INTEGRAL CONCRETE NOTE: LEVEL 10 RW W HOB
HOB PC 200 REFER TO SSL 67.890 PC NOTE: LEVEL 10 S- S-
R
SSL 65.650
6000
4840
PENETRATIONS SHOWN INTEGRAL CONCRETE HOB 2000 (O.F.)
4065
4263
INDICATIVE ONLY: TO BE (CH-100) HEIGHT 100: WIDE: 100
COORDINATED ONSITE
200 511 337 337 337 388 4262 4262 3945 3945
234
980 CH-100
600
150
200 Col.
80
Col.
10
150
190
435
BELOW 300
2350
150
FALL
2500
2
1:80
3
1615
1615
2350
209
1400 3350
211
5600
1595 2400 723 1875 1360 4134 716 1990 1360
97 5700 2500 1500 2050 OVERFLOW 2150
150
- SIPHONIC SYSTEM BY D&C SUB-CONTRACTOR
(O.F.) -APPROVED TRAFFICABLE WATERPROOF MEMBRANE
TO ROOF SLAB
SETOUT DIMENSIONS IDENTICAL FOR BALCONIES B/W GRIDS 2 & 6
-PARAPET OVERFLOWS TO BE CO-ORDINATED
WITH FACADE DETAILS/REFER ELEVATIONS
A A PROJECT STATUS:
FOR CONSTRUCTION
T : 03 9867 2888
F : 03 9867 2999
E : admin@doigarchitecture.com.au
PROJECT:
2 WESTS ROAD N
MARIBYRNONG