Inspection and Test Plan for Chea Residence Project (MVAC)

Inspection By
No Item Inspection/Test Activity Point of Inspection/Test Stage/Frequency Responsibility Acceptance Criteria Verifying Document Recording Document
CK MC
Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip

VRF Installation inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
completion of installation per drawing

Refrigerant Pipe Installation inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
completion of installation per drawing

1 VRF System Duct Installation inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
completion of installation per drawing

Refrigerant Pipe Leakage Test In progress and upon Throughout the installation Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test Report N.I.F J.A.W
completion of installation drawing Practice and Code

VRF funtional test Upon completion of installation During testing and commissioning Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test Report N.I.F J.A.W
and Inspection drawing Practice and Code

Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip

Ventilation Fan Installation inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
completion of installation per drawing

Grill/Diffuser Installation inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
completion of installation per drawing
2 Ventilation Fan

Air balancing Test In progress and upon Throughout the installation Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test Report N.I.F J.A.W
completion of installation drawing Practice and Code

Ventilation Fan funtional test Upon completion of installation During testing and commissioning Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test Report N.I.F J.A.W
and Inspection drawing Practice and Code

Note: A- To approve
F- To file record
I- To implement
J- To join inspection
N- To nofity
W- To witness
CK- Comin Khmere
MC- Main Contractor
Inspection and Test Plan for Chea Residence Project (Electrical)
Inspection By
No Item Inspection/Test Activity Point of Inspection/Test Stage/Frequency Responsibility Acceptance Criteria Verifying Document Recording Document
CK MC
Technical Related Material
Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Specification Submittal/ Delivery Slip Inspection Request N.I.F J.A.W

In progress and upon Construction as


Installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W
3 Main Switch Board

Upon completion of installation Specification/ Approved Approved Design/Normal


Main Switch Board funtional test During testing and commissioning Site Manager/QA-QC Engineer Test report N.I.F J.A.W
and Inspection drawing Practice and Code

Technical Related Material


Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Specification Submittal/ Delivery Slip Inspection Request N.I.F J.A.W

In progress and upon Construction as


Installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W
4 Distribution Board

Upon completion of installation Specification/ Approved Approved Design/Normal


Distribution board funtional test and Inspection During testing and commissioning Site Manager/QA-QC Engineer drawing Practice and Code Test report N.I.F J.A.W

Technical Related Material


Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Specification Submittal/ Delivery Slip Inspection Request N.I.F J.A.W

In progress and upon Construction as


Installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W

5 Earthing and Bonding In progress and upon Specification/ Approved Approved Design/Normal Test report
Insulation Resistance Test completion of installation Throughout the installation Site Manager/QA-QC Engineer drawing Practice and Code N.I.F J.A.W

Upon completion of installation During testing and commissioning Specification/ Approved Approved Design/Normal Test report
Earth electrode test and Inspection Site Manager/QA-QC Engineer drawing Practice and Code N.I.F J.A.W

Technical Related Material


Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Specification Submittal/ Delivery Slip Inspection Request N.I.F J.A.W

In progress and upon Construction as


Installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W

6 LV Cable Upon completion of installation During testing and commissioning Specification/ Approved Approved Design/Normal Test report
Continuity Test and Inspection Site Manager/QA-QC Engineer drawing Practice and Code N.I.F J.A.W

Upon completion of installation During testing and commissioning Specification/ Approved Approved Design/Normal Test report
Insulation Resistance Test and Inspection Site Manager/QA-QC Engineer drawing Practice and Code N.I.F J.A.W

Technical Related Material


Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Specification Submittal/ Delivery Slip Inspection Request N.I.F J.A.W
7 Cable Tray and Trunking
In progress and upon Construction as
Installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W

Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip
8 PVC and GI Conduit
Installation inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
completion of installation per drawing
Technical Related Material
Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Specification Submittal/ Delivery Slip Inspection Request N.I.F J.A.W

In progress and upon Construction as


Installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W

9 Switch and Isolator Upon completion of installation During testing and commissioning Specification/ Approved Approved Design/Normal Test report
Insulation Resistance Test Site Manager/QA-QC Engineer N.I.F J.A.W
and Inspection drawing Practice and Code

Switch and Isolator functional In progress and upon Specification/ Approved Approved Design/Normal Test report
During testing and commissioning Site Manager/QA-QC Engineer N.I.F J.A.W
test completion of installation drawing Practice and Code
Inspection and Test Plan for Chea Residence Project (Electrical)
Inspection By
No Item Inspection/Test Activity Point of Inspection/Test Stage/Frequency Responsibility Acceptance Criteria Verifying Document Recording Document
CK MC
Technical Related Material
Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Specification Submittal/ Delivery Slip Inspection Request N.I.F J.A.W

In progress and upon Construction as


Installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W

10 Lighting system Lighting functional and zoning Upon completion of installation Specification/ Approved Approved Design/Normal
test and Inspection During testing and commissioning Site Manager/QA-QC Engineer drawing Practice and Code Test report N.I.F J.A.W

LUX Measurement Upon completion of installation During testing and commissioning Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection drawing Practice and Code

Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip
In progress and upon Construction as
Installation inspection Throughout the installation Site Manager/QA-QC Engineer Related Drawing Inspection Request N.I.F J.A.W
completion of installation per drawing

In progress and upon Specification/ Approved Approved Design/Normal


Continuity Test Throughout the installation Site Manager/QA-QC Engineer Test report N.I.F J.A.W
completion of installation drawing Practice and Code

11 Power Socket Outlet In progress and upon Specification/ Approved Approved Design/Normal Test report
Insulation Resistance Test Throughout the installation Site Manager/QA-QC Engineer N.I.F J.A.W
completion of installation drawing Practice and Code

Polarity and Earthing Test In progress and upon During testing and commissioning Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
completion of installation drawing Practice and Code

In progress and upon Specification/ Approved Approved Design/Normal Test report


RCD Test completion of installation During testing and commissioning Site Manager/QA-QC Engineer drawing Practice and Code N.I.F J.A.W

Technical Related Material


Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Specification Submittal/ Delivery Slip Inspection Request N.I.F J.A.W

Installation inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
12 Data Socket Outlet completion of installation per drawing

Continuity Test In progress and upon Throughout the installation Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
completion of installation drawing Practice and Code

Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip

Installation inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
13 Telephone Socket Outlet completion of installation per drawing

Continuity Test In progress and upon Throughout the installation Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
completion of installation drawing Practice and Code

Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip
In progress and upon Construction as
Installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W

14 Lightning protection system Upon completion of installation Specification/ Approved Approved Design/Normal
Earth electrode test and Inspection During testing and commissioning Site Manager/QA-QC Engineer drawing Practice and Code Test report N.I.F J.A.W

Upon completion of installation During testing and commissioning Specification/ Approved Approved Design/Normal Test report
Lightning Arresters Test and Inspection Site Manager/QA-QC Engineer drawing Practice and Code N.I.F J.A.W

Note: A- To approve
F- To file record
Inspection and Test Plan for Chea Residence Project (Electrical)
Inspection By
No Item Inspection/Test Activity Point of Inspection/Test Stage/Frequency Responsibility Acceptance Criteria Verifying Document Recording Document
CK MC
I- To implement
J- To join inspection
N- To nofity
W- To witness
CK- Comin Khmere
MC- Main Contractor
Inspection and Test Plan for Chea Residence Project (Plumbing)
Inspection By
No Item Inspection/Test Activity Point of Inspection/Test Stage/Frequency Responsibility Acceptance Criteria Verifying Document Recording Document
CK MC
Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip
Cold water pipe installation In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
inspection completion of installation per drawing
Underground water tank In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
installlation inspection completion of installation per drawing
Booster Pump and Control Panel In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
Installation Inspection completion of installation per drawing

Water pipe leakage Test Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
1 Cold water system and Inspection commissioning drawing Practice and Code

Insulation test for cold water pump Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection commissioning drawing Practice and Code

Sanitary Wares Functional Test Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection commissioning drawing Practice and Code

Electrical Booster Pumset


Functional Testing and Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection commissioning drawing Practice and Code
Commissioning

Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip
Hot water pipe installation In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
inspection completion of installation per drawing

Water Heater Installation Inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
completion of installation per drawing
2 Hot water equipment

Water pipe leakage Test Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection commissioning drawing Practice and Code

Water heater Functional Test Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection commissioning drawing Practice and Code

Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip
Underground pipe installation In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
inspection completion of installation per drawing

Septic tank installlation inspection In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
completion of installation per drawing
Immersion Pump and Control In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
Panel Installation Inspection completion of installation per drawing
3 Water drainage system
Underground pipe leakage Test Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection commissioning drawing Practice and Code

Insulation test for immersion pump Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection commissioning drawing Practice and Code

Immersion Pumset Functional Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
Testing and Commissioning and Inspection commissioning drawing Practice and Code

Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Technical Related Material Inspection Request N.I.F J.A.W
Specification Submittal/ Delivery Slip

4 Swimming Pool system


Inspection and Test Plan for Chea Residence Project (Plumbing)
Inspection By
No Item Inspection/Test Activity Point of Inspection/Test Stage/Frequency Responsibility Acceptance Criteria Verifying Document Recording Document
CK MC
Underground pipe installation In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
inspection completion of installation per drawing
Balancing Tank installlation In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
inspection completion of installation per drawing
Pump and Control Panel In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
Installation Inspection completion of installation per drawing
4 Swimming Pool system
Underground pipe leakage Test Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection commissioning drawing Practice and Code

Insulation test for Pump Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection commissioning drawing Practice and Code

Swimming Pool Pumset Functional Upon completion of installation During testing and Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
Testing and Commissioning and Inspection commissioning drawing Practice and Code

Note: A- To approve
F- To file record
I- To implement
J- To join inspection
N- To nofity
W- To witness
CK- Comin Khmere
MC- Main Contractor
Inspection and Test Plan for Chea Residence Project (Fire Fighting)
Inspection By
No Item Inspection/Test Activity Point of Inspection/Test Stage/Frequency Responsibility Acceptance Criteria Verifying Document Recording Document
CK MC
Technical Related Material
Material receiving inspection Upon delivery at site Check the batch of delivery Site Manager/QA-QC Engineer Specification Submittal/ Delivery Slip Inspection Request N.I.F J.A.W

Fire fighting pipe installation In progress and upon Construction as


inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W

Fire Pump and control panel In progress and upon Throughout the installation Site Manager/QA-QC Engineer Construction as Related Drawing Inspection Request N.I.F J.A.W
Installation Inspection completion of installation per drawing
In progress and upon Construction as
Fire cabinet installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W

In progress and upon Construction as


Fire hydrant installation inspection completion of installation Throughout the installation Site Manager/QA-QC Engineer per drawing Related Drawing Inspection Request N.I.F J.A.W
1 Fire fighting system

Fire fighting pipe leakage test Upon completion of installation Throughout the installation Site Manager/QA-QC Engineer Specification/ Approved Approved Design/Normal Test report N.I.F J.A.W
and Inspection drawing Practice and Code

Insulation test for hose reel pump Upon completion of installation Specification/ Approved Approved Design/Normal
panel and Inspection Throughout the installation Site Manager/QA-QC Engineer drawing Practice and Code Test report N.I.F J.A.W

Fire Fighting Pump Testing and Upon completion of installation Specification/ Approved Approved Design/Normal
Commissioning and Inspection During testing and commissioning Site Manager/QA-QC Engineer drawing Practice and Code Test report N.I.F J.A.W

Note: A- To approve
F- To file record
I- To implement
J- To join inspection
N- To nofity
W- To witness
CK- Comin Khmere
MC- Main Contractor

S-ar putea să vă placă și