Sunteți pe pagina 1din 2

INDENT FOR STRUCTURAL DESIGN TO IDRB

SYPHON WELL DROP


1* Name of work
2* Date
3* IP address
A General Details and Location of Work
1* Location
2* Latitude
3* Longitude
4* Name of river/stream
5* Altitude from mean sea level
6* District
7* Taluk
8* Assembly constituency
9* Village
10* Panchayath/Muncipality/Corporation
B Details of Officials Furnishing the Indent
1* Assistant Engineer Office
Name
2* Assistant Executive Office
Engineer Name
3* Executive Engineer Office
Name
4* Superintending Engineer Office
Name
5* Chief Engineer Office
Name
C Details Required
1* Approved hydraulic particulars
covering upstream and down stream
of the proposed structure
2* Site plan showing alignment of the
proposed structure
3* General view of the syphon well
drop marked in the longitudinal
section
4* Bore hole details with N value and
bearing capacity of each layer of
strata specifying all soil parameters
via cohesion c,angle of internal
friction and unit weight of the soil.The
soil investigation report should
contain specific recommendation
regarding the type of foundation
suitable for the site and foundation
level of inlet well,outlet well and
syphon
5 If the syphon crosses a road,type of
loading,road level,width of road
6 If the syphon crosses a Stream,width
of the stream,HFL>LWL of the
stream and bed level of the stream
7* Scheme report giving details of
scope of work,As etc
(*) Indicated fields are mandatory