This document provides a cost estimate sheet for a variation order with itemized direct and indirect costs. It lists 13 line items including material cost, labor costs for electrical, plumbing and HVAC works, non-manual labor costs, tools, site office overhead, engineering costs, guaranteed costs, main office overhead, profit markup, front loading charges, and the final net selling price. The total direct cost, net selling price, and final net selling price are also provided.
This document provides a cost estimate sheet for a variation order with itemized direct and indirect costs. It lists 13 line items including material cost, labor costs for electrical, plumbing and HVAC works, non-manual labor costs, tools, site office overhead, engineering costs, guaranteed costs, main office overhead, profit markup, front loading charges, and the final net selling price. The total direct cost, net selling price, and final net selling price are also provided.
This document provides a cost estimate sheet for a variation order with itemized direct and indirect costs. It lists 13 line items including material cost, labor costs for electrical, plumbing and HVAC works, non-manual labor costs, tools, site office overhead, engineering costs, guaranteed costs, main office overhead, profit markup, front loading charges, and the final net selling price. The total direct cost, net selling price, and final net selling price are also provided.
Submitted on XXXX and official certification received Variation Submitted XXXX through ECC letter ref: XXXX dated XXXX with AED XXXX TOTAL CLAIMED AND APPROVED - Should not exceed 60% from total Selling Price of the 1 Material Cost (<60%) concern Variation (Ideal 50%) 2 Manual Labour - ELEC (38%) Around 38% from Material 3 Manual Labour - PL (38%) Around 38% from Material 4 Manual Labour - HAVC (25%) Around 25% from Material 5 Non Manual Labour (22%) 22% from Material 6 Subcontract Use the actual figures from the Subcontractors 7 Tools (1%) 1% from Material 8 Site Office Overhead (6%) 6% from Material 9 Engineering (6%) 6% from Material 10 Guaranteed (1.5%) 1.5% from Material TOTAL DIRECT COST - 11 Main Office Overhead (12.5%) - 12 Profit (Markup) - NET SELLING PRICE - 13 Front Loading (10%) - FINAL NET SELLING PRICE - 65 m 352 m x 100.29269 35,303.03 485,000.00 150 m 1943 m y 231.44469 449,697.04 215 2295 485000