Step No. 1
Check for the M/C components, accessories and tools which are :-
- Tool box .
- Bolts for mast sections connection.
- Light spots and glass sliding parts and flasher.
Step No. 2
Assembly of counterweight which weights 4.8 ton, so we can assemble
the mast sections.
(1) First position the clamps to raise the counterweight then adjust the
counterweight to fit the 4 bolts shown carefully to adjust it
horizontally.
(2) Note that there is a gab between the counterweight and the machine
body.
(3) Note that there is a special tool for tighten the 4 bolts of the
counterweight .
Step No. 3
Assembly of mast. The mast consists mainly of 2 sections :
Assembly of section 1.
(4) First, check that the ball joint of the mast is correctly fitting it's seat
on the jip and disassemble the cover cap of the ball joint as to fix it
to it's seats . Put grease on ball joints seats.
(5) Lift section no. 1 horizontally [ with the crane ] to fix it up to the
machine. Put grease on ball joints seats and then put the mast down
carefully and reassemble the cover caps of the ball joints and note
that the 2 cover caps of the ball joint centers the ball joints
positions.
(6) When assembling the mast, take care of the light sensors (for mast
inclination ) not to be broken.
(7) Check that every bolt is well tighten.
Assembly of section 2
(9) Lift section 2 by crane carefully and be sure that it's absolutely
horizontal then assemble the 2 section together and while doing
that take care of the data cable extended through the mast sections
(connect the 2 data cable together in a correct way ) [ be sure that
the 4 bolts between section 1 & 2 are well tightened and locked by
2 nuts for every bolt. ]
Step No. 4
Assembly of the cat head
(10) Disassemble the lock nut of the 1st pin ( big one ) then
disassemble the 2nd pin(small one) . Assemble the cat head to the
mast end assembling the 2nd pin first then the big pin after.
(11) The cat head contains 4 Polly ( 1 for the service winch rope and
the auxiliary rope together ,1 for the service winch and 2 for the
auxiliary winch rope )
(12) Put the 2 Pulley of the auxiliary winch aside ,so the auxiliary rope
could be assembled
(13) Assemble the 2 limit switches to the cat head ( note that the
double wire of the limit switch tighten to the lever ) [ there are 2
levers for the 2 limit switch ]