5. Solve the problem through simple moving average and find mean absolute deviation,
mean square error, mean forecast error and mean absolute percentage error for the
following problem
Time
1 2 3 4 5 6 7 8 9 10 11 12
(Months)
Demand 94 99 86 122 89 95 74 77 105 103 88 82
6. Estimate the Total production cost by using Hiring and Firing Strategy with the
following details Inventory holding cost is Rs 5/unit/month, sub contracting cost
is Rs 10/unit, average pay rate is Rs 5/hr ( 40/day), over time pay rate is is Rs
7/hr ( above 8 hr/ day), labour hours to produce a unit is 1.6hr/unit, cost of
increasing daily production rate is (hiring and training) is Rs 300/unit and cost of
decreasing daily production rate (layoff) is Rs 600/unit
Precedence
Activity Duration Weightage
activity
1 - 5 45
2 1 10 28
3 1 8 25
4 2,3 7 13
5 2 5 11
6 3 4 10
7 4,5,6 6 6
9. Solve the below problem by using FCFS,EDD,CR and STR and find out the
operational completion time, average flow time, average number of jobs in the
system and average number of jobs are tardy
S. No 1 2 3 4 5 6 7 8 9 10
X bar 11.2 11.8 10.8 11.6 11 9.6 10.4 9.6 10.6 10.0
R 7 4 8 5 7 4 8 4 7 9
12. Construct an Operating Characteristic curve for n= 70, c=2 and c=4
17. Solve the problem through double moving average and find mean absolute
deviation, mean square error, mean forecast error and mean absolute
percentage error for the following problem
Time
1 2 3 4 5 6 7 8 9 10 11 12
(Months)
Demand 95 100 87 123 90 96 75 78 106 104 89 83
18. Estimate the Total production cost by using Constant work force strategy
with the following details Inventory holding cost is Rs 5/unit/month, sub
contracting cost is Rs 10/unit, average pay rate is Rs 5/hr ( 40/day), over
time pay rate is is Rs 7/hr ( above 8 hr/ day), labour hours to produce a unit
is 1.6hr/unit, cost of increasing daily production rate is (hiring and training) is
Rs 300/unit and cost of decreasing daily production rate (layoff) is Rs
600/unit
21. What is the purpose of Gantt chart and solve the 2-Machine and n-Jobs
problem by using Johnson’s Algorithm
Job 1 2 3 4 5 6 7 8
T1 5 2 1 7 6 3 7 5
T2 2 6 2 5 6 7 2 1
30. Estimate the Total production cost by using Sub Contracting strategy with
the following details Inventory holding cost is Rs 5/unit/month, sub
contracting cost is Rs 10/unit, average pay rate is Rs 5/hr ( 40/day), over
time pay rate is is Rs 7/hr ( above 8 hr/ day), labour hours to produce a unit
is 1.6hr/unit, cost of increasing daily production rate is (hiring and training) is
Rs 300/unit and cost of decreasing daily production rate (layoff) is Rs
600/unit
33. Jobs have to be processed on 5 machines I, II, III, IV, V in the order I→II→III→IV→V.
Processing times in minutes are given below. Determine the sequence that will
minimize the elapsed time or cycle time. Also find the idle time in each machine.
Machines
I II III IV V
Jobs
1 11 14 17 10 19
2 12 14 16 13 17
3 17 12 11 15 19
4 16 16 12 12 21
5 14 16 10 11 19
6 15 14 13 16 26
Sample
1 2 3 4 5 6 7 8 9 10
Number
No of
Defective 12 15 20 14 9 20 15 10 9 8
Resistors
41. Estimate the future demand in 2019, 2020 and 2025 through linear
regression method for the following details
S.No 1 2 3 4 5
Year 2010 2012 2014 2016 2018
Sales 75 84 92 98 88
42. Estimate the future demand through single exponential smoothing for the
2019,2020,2021 with the following details
S.No 1 2 3 4 5 6 7
Year 2012 2013 2014 2015 2016 2017 2018
Sales 5 5.6 6.7 5.8 6.9 5.1 8.1
44. Describe Line Balancing and solve the below problem by using COMSOL method with
production demand is 24 completed assembles for shift.
Activity Precedence Duration
1 - 5
2 1 3
3 1 7
4 1 5
5 3 6
6 3,4 3
7 2 4
8 5,6 6
9 4 12
10 7,8,9 9
45. Find total time elapsed, idle time & Gantt chart for the following data
Job Machines
1 2 3 4 5
1 14 16 10 11 19
2 12 14 16 13 17
3 16 16 12 12 21
4 17 12 11 15 19
5 15 14 13 16 26
6 11 14 17 10 19
46. Applications of variables and attributes charts with control limit formulas
47. A finishing process packages assemblies into boxes. You have noticed variability in
the boxes and desire to improve the process to fix the problem because some
products fit too tightly into the Boxes and others fit too loosely. In the text are width
measurements for the boxes. Using X-bar and R charts plot and interpret The
process.