HARGA SATUAN
NO. HARGA SATUAN UPAH, MATERIAL DAN ALAT UNIT KETERANGAN
Rp
I MATERIAL :
A PEKERJAAN SIPIL
1 Portland Cemen (PC) Zak
2 Sand m3
3 Split m3
4 Crushed Stone m3
5 Fine Split m3
6 Wooden m3
7 Beam of Wooden m3
8 Plywood 18 mm sheet
9 Galvanis of Wire dia 4 mm for Gabion or etc kg
10 Concrete of Wire kg
11 Wire Mash ( dia 3,2 ÷ 4 mm ) for Shotcrete m2
12 Nail 5 & 7 cm kg
13 Plain Reinforced of Steel U 24 - BJTP 24 kg
14 Screew Reinforced of Steel U 32 - BJTD 40 kg
15 Galvanis of Steel angle HTS kg
16 Galvanis of Steel angle MS kg
17 Galvanis Bolt and Nuts no
18 Galvanis of Steel Plate kg
19 Aluminium Plate m2
20 Oil Machine litre
21 Oil Machine ( Hydrolis ) litre
22 Oil Formwork litre
23 PVC dia 2 " m'
24 PVC dia 4 " m'
25 Concrete of Pipe dia 30 cm m'
26 Palm Fibre kg
27 Dolken dia. 10 cm, Lenght 4 m. stick
28 Red brick unit
29 Gravel m3
30 Board of Wooden sheet
31 Bamboo stick
32 Colour wood paint kg
33 Colour wall paint eksterior kg
34 Colour steel paint kg
35 Water m3
36 BBM / solar litre
37 Welding wire Kg
38 Driven Pile with reinforced concrete 30x30 cm m
39 Fence BRC height 1,90 m lenght 2,40 m set
40 Pipe of steel Dia 3 inc lenght 6,00 m stick
Bidder :
HARGA SATUAN
NO. HARGA SATUAN UPAH, MATERIAL DAN ALAT UNIT KETERANGAN
Rp
II UPAH
1 Worker man/day
2 Stringging Worker man/day
3 Foreman man/day
4 Foreman Transmission Line man/day
5 Brick Layer man/day
6 Paint Worker man/day
7 Steel Worker man/day
8 Steel Erection Worker man/day
9 Welded Worker man/day
10 Carpenter man/day
11 Worker chief man/day
12 Operator man/day
13 Drafter man/day
14 Engineer man/day
15 Surveyor man/day
16 Engineer expert man/day
17 Driver man/day
III PERALATAN