Documente Academic
Documente Profesional
Documente Cultură
TESIS
PRESENTADO POR EL BACHILLER:
INGENIERO MECANICO
HUANCAYO – PERU
2013
ASESOR
Mg. Ing. Ricardo Aguirre Parra.
DEDICATORIA
RESUMEN ............................................................................................................ 10
ABSTRAC ............................................................................................................. 12
INTRODUCCIÓN .................................................................................................. 14
2.1 Antecedentes…………………………………………………………..…………...20
2.2 Bases teóricas ................................................................................................ 21
Capítulo 3: METODOLOGÍA
4.1 Resultados..................................................................................................... 40
RECOMENDACIONES ......................................................................................... 70
BIBLIOGRAFÍAS................................................................................................... 72
ANEXOS ............................................................................................................... 73
6
INDICE DE TABLAS
mejorar la productividad cotidiana que el 2011 llegó a 47.71 m3/h, cuando los
datos del fabricante de los equipos de trituración indica que debería llegarse a
técnicos y económicos.
10
Planta de Chancado de Agregados, que tuvo en el 2011 un promedio de 47.71
puesto como meta, cabe mencionar que para estas modificaciones internas no
al entorno del país, por sus características más complejas y críticas dentro del
presente investigación.
AUTOR
11
ABSTRACT
ENTERPRISE - ISCAYCRUZ
productivity, using maintenance rates as: availability and use, which are usually
Optimization theory maintenance indicators has shown that the most efficient
way to produce aggregates of quality and quantity to meet the potential market ,
critical points, thus achieving raise productivity Aggregate Crushing Plant, which
12
meet the production quota that the Superintendent of the company , has set a
goal , it is noteworthy that for these internal changes do not have references.
To carry out this project, modeled on the crushers to the environment of the
country, its most complex and critical in the process of exploitation and their
With respect , the scope of the results , they can be referentially for plants of
this type , the recommendations also indicated other possible opportunities for
AUTHOR
13
INTRODUCCIÓN
14
Capítulo I, trata del planteamiento del estudio, en el cual se ilustra
lo importante.
15
CAPÍTULO 1
incrementar la productividad?
incrementar la productividad.
1.5 JUSTIFICACIÓN
correctivas ejecutadas.
1.5.2 BENEFICIOS
1.5.3 ALCANCES
1.5.4 LIMITACIONES
1.6 HIPÓTESIS
MULTICOSAILOR – ISCAYCRUZ
VARIABLES E INDICADORES
Variable independiente: Indicadores de mantenimiento.
18
Indicadores: Disponibilidad y utilización.
Variable dependiente: Productividad de Planta.
Indicadores: Metros cúbicos por hora por hora (producción) y rentabilidad.
19
CAPÍTULO 2
MARCO TEÓRICO
2.1 ANTECEDENTES
En internet se encuentra una investigación titulada “Caso de Estudio Sobre
críticos a los que contractualmente se les deberá exigir una mayor fiabilidad
horas trabajadas.
21
El objetivo es establecer la mezcla idónea de maquinaria, de
trabajo.
22
La calidad y disponibilidad de los recursos naturales, que impacta
recursos.
de trabajar.
23
sueldos y más rentabilidad para el capital invertido, a la vez que
crecimiento de la economía.
a largo plazo.
24
A) DISPONIBILIDAD
Dónde:
B) UTILIZACIÓN
de forma efectiva.
Dónde:
producción de agregados:
25
2.3 MARCO CONCEPTUAL
INCREMENTO DE PRODUCTIVIDAD
REDUCIR COSTOS
La reducción de costos en la empresa es el producto de diversas
26
implantando el sistema de mejora continua kaizen, para ello no se trata
máquina fragmentadora.
27
1. Cancha de gruesos.
2. Tolva de Alimentación.
3. BeltFeeder.
4. Grizly estacionario.
6. Chute de descarga.
7. Faja transportadora.
8. Patio de Agregados
distribución.
28
CAPÍTULO 3
METODOLOGÍA
- Particularidades de la carga.
- Particularidades de la operación.
29
Estos grupos se podrán determinar las características técnicas que deberá
sociedad.
una figura meritoria útil para encontrar cual componentes que influyen
30
propósito es mejorar el sistema de mantenimiento de una planta de
INDEPENDIENTE DEPENDIENTE
Variables
Indicadores de mantenimiento Productividad
Tiempo total de operación Toneladas de producción
Escalas de
Tiempo promedio entre fallas Materia prima
Medición
Tiempo de reparación
O1 → X → O 2
Diseño de la Donde:
Investigación O1: Observación antes de Tratamiento (m3/h).
X : Implementación de mejoras en la Gestión del Mantto.
O2 : Observación al final del tratamiento (m3/h)
Técnicas de Empírica:
31
3.3 POBLACION Y MUESTRA DE LA INVESTIGACIÓN
- Área de logística
- Taller de reparaciones
- Manuales de componentes
MULTICOSAILOR – ISCAYCRUZ.
medición:
32
1. Horometro de los equipos.
Horas Producción
Fecha Guardia Horómetro
Operación Volquetes Tn m3
Anterior
Día
Noche
Día
Noche
RESULTADOS OPERACIÓN VD
PROMEDIO
Fig. 3.1 Formato de control de Producción
Equipo mecánico
Equipo eléctrico
Variador de tensión
33
Equipo de transporte
Belt Feeder de 36
SUPERVISOR 2º
FECHA CLIMA 3º
TIEMPO (Hr-Min)
CODIGO INCIDENCIAS / TRABAJOS REALIZADOS DETALLES / PRODUCCION
INICIO FINAL
CANTERA
SUR
BOCAMINA SUR
CENTRAL
NORTE
NORTE ALTA
MATERIAL CHANCADO DE
AGREGADOS
UNIDAD VEHICULAR
DETALLE DE ACTIVIDADES
UTILIZACIÓN ESPERAS Y DEMORAS MEJORA DE INFRAESTRUCTURA
101 Cha nca do de Agrega dos Grues os 201 Fa l ta de Opera dor 501 Modi fi ca ci ones por pa rte del á rea de Proyectos
102 Cha nca do de Agrega dos Fi nos 202 Ca mbi o Gua rdi a (Tra s l a do de pers ona l ) 502 Reforza mi ento de tol va s , es tructura s , gua rda s
103 Arra nque en Va ci o / Prueba s 203 Inducci ón de s eguri da d / Repa rto de
MANTENIMIENTO PREVENTIVO Gua rdi a / Check Li s t La bor
301 Ins pecci on de Equi po 204 Al muerzo / Refri geri o
302 Ejecuci ón de Ma nteni mi ento Progra ma do 205 Orden y Li mpi eza
303 Engra s e / Lubri ca ci ón Genera l del Equi po 206 Condi ci ones Cl i ma ti ca s No Apropi a da s CONSUMO DE LUBRICANTES Y GRASAS
304 Tens a do de Correa s de Tra ns mi s i on 207 Fa l ta de Al i menta ci on
305 Tens a do de Ca dena s de Tra ns mi s i on 208 Atoro Ba ncos , Ca rga en Tol va s / Fa ja s Acei te 15W40 (Gl n)
306 Ajus te de Pernos en Forro Móvi l / Fi jo / Cuña s MANTENIMIENTO CORRECTIVO Acei te 85W90 (Gl n)
307 Apertura / Ci erre de Setti ng 401 Ca mbi o de Correa s de Tra ns mi s i ón Gra s a s Kg.
308 Tens a do / Al i nea mi ento de Fa ja Tra ns porta dora 402 Ca mbi o de Ca dena s de Tra ns mi s i ón
309 Vol teo / Al i nea mi ento de Correa s de Tra nmi s i ón 403 Ca mbi o / Repa ra ci ón de Pol i nes Autoa l i nea ntes MPE - Ma nteni mi ento Preventi vo de Equi po:
310 Ca mbi o de Gua rdera de Jebe 404 Corte No Previ s to de Energi a El ectri ca o. Engra s e de ca dena s , chuma cera s y equi pos en genera l
311 Ca mbi o de Forro Fi jo 405 Va ri a dor de Vel oci da d Fuera de Servi ci o o. Ca mbi o de a cei te de tra ns mi s i on y/o l ubri ca ci on.
312 Ca mbi o de Forro Movi l 406 Repa ra ci ón Mecá ni ca o. Al i nea mi ento de fa ja de tra ns mi s i on y/o tra ns porta dora .
313 Ca mbi o de Forros La tera l es 407 Repa ra ci ón El éctri ca o. Otros .
314 Ca mbi o de Fa ja Tra nporta dora / Bel t Feeder 408 Repa ra ci ón Ins trumenta l
CONDICIONES EN QUE SE DEJA EL EQUIPO
OPERATIVO OBSERVACIONES
INOPERATIVO
OBSERVACIONES OPERACIONALES
34
MANTENIBILIDAD Y CONFIABILIDAD - PLANTA DE AGREGADOS
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo Eventos Correctivos MTTF - Tiempo med. entre fallas
Horas Mantto. Preventivo MTTR - Tiempo me. para reparac.
RESUMEN DE PARADAS
Mantto. Preventivo
Mantto. Correctivo
Operación
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct.
x Operaciones
TOTAL
PARÁMETROS DE OPERACIÓN
HORAS DE OPERACIÓN
PARAMETROS DE MANTENIMIENTO
DISPONIBILIDAD
MECÁNICA
UTILIZACIÓN
DISPONIBILIDAD FÍSICA
PRODUCCION
historial de datos.
codificación, etc.
dos grupos, uno experimental y otro de control, donde los elementos han sido
36
X: Tratamiento aplicado al grupo experimental.
GE A X O1 O1: Observación de la variable dependiente en el GE.
GC A --- O2 O2: Observación de la variable dependiente en el GC
adecuada del área, es por eso que, a partir del 2012, como parte de la
37
experimentación, se implementa este indicador, el cual permite tener un
productividad de la Planta.
38
CAPÍTULO 4
PRESENTACIÓN DE RESULTADOS
operativa como en la gestión del mantenimiento, es por esto que se optó por
además de adicionar un indicador que nos brinda una visión más exacta de La
situación del área, los resultados obtenidos son los que se presentan en este
capítulo.
39
4.1 RESULTADOS:
DISPONIBILIDAD FÍSICA
(+) Horas Calendario 744.00 h
(-) x Mantto. Programado 199.58 h
(=) Horas Programadas 544.42 h
(-) Total Paradas 343.08 h
(=) Horas Utilizadas 201.34 h
DISPONIBILIDAD 36.98%
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 64.75 h Eventos Correctivos 11 MTTF - Tiempo med. entre fallas 49.49 h
Horas Mantto. Preventivo 199.58 h MTTR - Tiempo me. para reparac. 5.89 h
RESUMEN DE PARADAS
Mantto. Preventivo 97 199.58 h 58.17%
Mantto. Correctivo 11 64.75 h 18.87%
Operación 198 278.33 h 81.13%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 11 64.75 h 18.87%
x Operaciones 198 278.33 h 81.13%
TOTAL 343.08 h 100.00%
40
PARÁMETROS DE OPERACIÓN
PARAMETROS DE MANTENIMIENTO
41
B) RESUMEN FEBRERO – 2012
DISPONIBILIDAD FÍSICA
(+) Horas Calendario 696.00 h
(-) x Mantto. Programado 188.92 h
(=) Horas Programadas 507.09 h
(-) Total Paradas 226.16 h
(=) Horas Utilizadas 280.92 h
DISPONIBILIDAD 55.40%
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 32.25 h Eventos Correctivos 26 MTTF - Tiempo med. entre fallas 19.50 h
Horas Mantto. Preventivo 188.92 h MTTR - Tiempo me. para reparac. 1.24 h
RESUMEN DE PARADAS
Mantto. Preventivo 100 188.92 h 83.53%
Mantto. Correctivo 26 32.25 h 14.26%
Operación 273 193.91 h 85.74%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 26 32.25 h 14.26%
x Operaciones 273 193.91 h 85.74%
TOTAL 226.16 h 100.00%
PARÁMETROS DE OPERACIÓN
PARAMETROS DE MANTENIMIENTO
42
La disponibilidad que tuvo Planta el presente mes es la
DISPONIBILIDAD
siguiente, la cual se vio afectada por los trabajos de
MECÁNICA
mantenimiento correctivo presentados (Cambio de faja
93.64%
transportadora).
UTILIZACIÓN
Afecto a la utilización la falta de alimentación constante.
59.16%
DISPONIBILIDAD FÍSICA
(+) Horas Calendario 696.00 h
(-) x Mantto. Programado 123.08 h
(=) Horas Programadas 572.92 h
(-) Total Paradas 187.74 h
(=) Horas Utilizadas 385.17 h
DISPONIBILIDAD 67.23%
43
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 23.58 h Eventos Correctivos 27 MTTF - Tiempo med. entre fallas 21.22 h
Horas Mantto. Preventivo 123.08 h MTTR - Tiempo me. para reparac. 0.87 h
RESUMEN DE PARADAS
Mantto. Preventivo 86 123.08 h 65.56%
Mantto. Correctivo 27 23.58 h 12.56%
Operación 268 164.16 h 87.44%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 27 23.58 h 12.56%
x Operaciones 268 164.16 h 87.44%
TOTAL 187.74 h 100.00%
PARÁMETROS DE OPERACIÓN
HORAS DE
Las horas de operación, se vieron reducidas por la falta
OPERACIÓN
de alimentación constante.
116.79 horas
PARAMETROS DE MANTENIMIENTO
DISPONIBILIDAD
La disponibilidad es la mostrada, debido a que se redujo
FÍSICA 67.23%
las demoras operativas y se tuvo equipos de
alimentación disponibles (Cargador frontal, Volquete).
44
D) RESUMEN - ABRIL 2012
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 47.03 h Eventos Correctivos 28 MTTF - Tiempo med. entre fallas 18.56 h
Horas Mantto. Preventivo 125.30 h MTTR - Tiempo me. para reparac. 1.68 h
RESUMEN DE PARADAS
Mantto. Preventivo 103 125.30 h 62.03%
Mantto. Correctivo 28 47.03 h 23.28%
Operación 154.98 h 76.72%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 28 47.03 h 23.28%
x Operaciones 0 154.98 h 76.72%
TOTAL 202.01 h 100.00%
PARAMETROS DE MANTENIMIENTO
La disponibilidad mecánica como eficiencia de las
labores de mantenimiento alcanzaron en el
presente mes el valor indicado, en vista que no
DISPONIBILIDAD MECÁNICA
se presentaron paradas no programadas; se
90.95%
aprovecha las paradas operativas para efectuar
algún tipo de mantenimiento en el equipo según
inspección por el personal de MULTICOSAILOR.
Incluyendo las actividades preventivas requeridas
en la planta de agregados, la disponibilidad de
DISPONIBILIDAD DE EQUIPOS los equipos disminuye al valor indicado; dentro de
73.28% las actividades preventivas se considera el volteo
de las muelas tanto fija y móvil, ajuste de pernos
en general.
45
La utilización en la planta cae sensiblemente por
los factores climatológicos (la planta está a la
intemperie) y por problemas operativos de falta
de alimentación, adicionalmente por las
UTILIZACIÓN 24.03%
modificaciones que se practican en la planta.
Éste mes se han instalado grating en todas las
plataformas de tránsito debido a las
observaciones de seguridad.
PARÁMETROS DE OPERACIÓN
46
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 66.94 h Eventos Correctivos 24 MTTF - Tiempo med. entre fallas 22.57 h
Horas Mantto. Preventivo 124.79 h MTTR - Tiempo me. para reparac. 2.79 h
RESUMEN DE PARADAS
Mantto. Preventivo 118 124.79 h 51.84%
Mantto. Correctivo 24 66.94 h 27.81%
Operación 173.77 h 72.19%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 24 66.94 h 27.81%
x Operaciones 0 173.77 h 72.19%
TOTAL 240.71 h 100.00%
PARAMETROS DE MANTENIMIENTO
PARÁMETROS DE OPERACIÓN
47
Según los registros de operación de la
planta, el volumen indicado corresponde al
VOLUMEN DE AGREGADO
volumen aproximado de agregado producido;
PRODUCIDO 9,336. m3
lo que en promedio corresponde al valor de
283.74 m3/día.
Fuente: Planta de Agregados – Multicosailor SAC
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 68.19 h Eventos Correctivos 22 MTTF - Tiempo med. entre fallas 26.70 h
Horas Mantto. Preventivo 57.49 h MTTR - Tiempo me. para reparac. 3.10 h
RESUMEN DE PARADAS
Mantto. Preventivo 76 57.49 h 25.09%
Mantto. Correctivo 22 68.19 h 29.76%
Operación 160.95 h 70.24%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 22 68.19 h 29.76%
x Operaciones 0 160.95 h 70.24%
TOTAL 229.14 h 100.00%
PARAMETROS DE MANTENIMIENTO
48
Incluyendo las actividades preventivas
requeridas en la planta de agregados, la
disponibilidad de los equipos disminuye al
DISPONIBILIDAD DE EQUIPOS
valor indicado; dentro de las actividades
80.51%
preventivas se considera el volteo de las
muelas tanto fija y móvil, ajuste de pernos en
general y demás actividades de mantto.
La utilización en la planta cae sensiblemente
por los factores climatológicos (la planta está
a la intemperie) y por problemas operativos
UTILIZACIÓN 24.95% con el tipo de bancos usados (algunos muy
grandes), además de la falta de alimentación
constante, ocasionando horas muertas de
operación.
PARÁMETROS DE OPERACIÓN
RESUMEN DE PARADAS
Mantto. Preventivo 118 117.17 h 49.24%
Mantto. Correctivo 31 95.69 h 40.21%
Operación 142.27 h 59.79%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 31 95.69 h 40.21%
x Operaciones 0 142.27 h 59.79%
TOTAL 237.96 h 100.00%
PARAMETROS DE MANTENIMIENTO
PARÁMETROS DE OPERACIÓN
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 79.56 h Eventos Correctivos 47 MTTF - Tiempo med. entre fallas 11.85 h
Horas Mantto. Preventivo 88.00 h MTTR - Tiempo me. para reparac. 1.69 h
RESUMEN DE PARADAS
Mantto. Preventivo 136 88.00 h 35.06%
Mantto. Correctivo 47 79.56 h 31.70%
Operación 171.41 h 68.30%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 47 79.56 h 31.70%
x Operaciones 0 171.41 h 68.30%
TOTAL 250.97 h 100.00%
PARAMETROS DE MANTENIMIENTO
51
La utilización en la planta cae sensiblemente por los
factores climatológicos (la planta está a la
UTILIZACIÓN intemperie) y por problemas operativos con el tipo de
26.58% bancos usados (algunos muy grandes), además de
la falta de alimentación constante, ocasionando
horas muertas de operación
PARÁMETROS DE OPERACIÓN
52
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 107.16 h Eventos Correctivos 35 MTTF - Tiempo med. entre fallas 15.39 h
Horas Mantto. Preventivo 127.79 h MTTR - Tiempo me. para reparac. 3.06 h
RESUMEN DE PARADAS
Mantto. Preventivo 156 127.79 h 45.05%
Mantto. Correctivo 35 107.16 h 37.78%
Operación 176.49 h 62.22%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 35 107.16 h 37.78%
x Operaciones 0 176.49 h 62.22%
TOTAL 283.65 h 100.00%
PARAMETROS DE MANTENIMIENTO
PARÁMETROS DE
OPERACIÓN
53
Según los registros de operación de la planta, el volumen
VOLUMEN DE
indicado corresponde al volumen aproximado de
AGREGADO
agregado producido; lo que en promedio corresponde al
PRODUCIDO 11,424. m3
valor de 368.52 m3/día.
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 63.96 h Eventos Correctivos 28 MTTF - Tiempo med. entre fallas 19.61 h
Horas Mantto. Preventivo 95.96 h MTTR - Tiempo me. para reparac. 2.28 h
RESUMEN DE PARADAS
Mantto. Preventivo 148 95.96 h 33.42%
Mantto. Correctivo 28 63.96 h 22.28%
Operación 223.14 h 77.72%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 28 63.96 h 22.28%
x Operaciones 0 223.14 h 77.72%
TOTAL 287.10 h 100.00%
PARAMETROS DE MANTENIMIENTO
54
Incluyendo las actividades preventivas requeridas en
DISPONIBILIDAD la planta de agregados, la disponibilidad de los
DE EQUIPOS equipos disminuye al valor indicado; dentro de las
75.21% actividades preventivas se considera el volteo de las
muelas tanto fija y móvil, ajuste de pernos en general.
La utilización en la planta cae sensiblemente por los
factores climatológicos (la planta está a la intemperie)
UTILIZACIÓN y por problemas operativos con el tipo de bancos
34.6% usados (algunos muy grandes), además de la falta de
alimentación constante, ocasionando horas muertas
de operación.
PARÁMETROS DE OPERACIÓN
55
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 44.11 h Eventos Correctivos 28 MTTF - Tiempo med. entre fallas 20.06 h
Horas Mantto. Preventivo 104.77 h MTTR - Tiempo me. para reparac. 1.58 h
RESUMEN DE PARADAS
Mantto. Preventivo 128 104.77 h 42.41%
Mantto. Correctivo 28 44.11 h 17.86%
Operación 202.90 h 82.14%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 28 44.11 h 17.86%
x Operaciones 0 202.90 h 82.14%
TOTAL 247.01 h 100.00%
PARAMETROS DE MANTENIMIENTO
PARÁMETROS DE OPERACIÓN
56
K) RESUMEN DICIEMBRE 2012
INDICADORES DE CONFIABILIDAD
Horas Mantto. Correctivo 17.63 h Eventos Correctivos 17 MTTF - Tiempo med. entre fallas 29.62 h
Horas Mantto. Preventivo 141.42 h MTTR - Tiempo me. para reparac. 1.04 h
RESUMEN DE PARADAS
Mantto. Preventivo 133 141.42 h 100.26%
Mantto. Correctivo 17 17.63 h 12.50%
Operación 123.43 h 87.50%
Otros
NATURALEZA DE PARADAS
x Mantenimiento Correct. 17 17.63 h 12.50%
x Operaciones 0 123.43 h 87.50%
TOTAL 141.06 h 100.00%
PARAMETROS DE MANTENIMIENTO
57
La utilización en la planta cae sensiblemente por
los factores climatológicos (la planta está a la
intemperie) y por problemas operativos con el
UTILIZACIÓN 19.14%
tipo de bancos usados (algunos muy grandes),
además de la falta de alimentación constante,
ocasionando horas muertas de operación.
PARÁMETROS DE OPERACIÓN
58
4.2 RESUMEN DE LOS REPORTES
59
Fig. 4.2 Indicadores de Mantenimiento – 2012
4.3 PRUEBA DE LA HIPÓTESIS
Para validar la hipótesis, tomamos como referencia los datos del 2011, los
cuales arrojan la siguiente información.
60
Entonces haciendo la evaluación con la distribución de Student,
comparando con el valor logrado en el 2012, que fue de 66.83 m 3/h.
validamos la hipótesis.
Lower Upper
Lower Upper
61
CAPITULO 5
la Planta, esto debido a que con los cambios hechos a la gestión del
Para hacer esta comparación se tuvo que recopilar datos del año 2011 y de
62
La innegable necesidad por producir con la Planta Chancadora de
la comparativa respectiva.
63
REGISTRO DEL AÑO 2012
PRODUCTIVIDAD:
O1 → X → O 2
Donde:
O1: Observación antes de Tratamiento (m3/h).
X : Implementación de mejoras en la Gestión del Mantto.
64
O2 : Observación al final del tratamiento (m3/h).
65
Tabla 5.3 Productividad mensual - 2011
2011
Mes Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Hrs. 134 134.3 142.5 161.8 143.8 143.9 157.6 150.6 221.1 173.6 229.9 225.5
Producción 4023 4564 6358 9250 7890 6589 8275 8660 10360 10040 10658 101600
PRD 30.0 34.0 44.6 57.2 54.9 45.8 52.5 57.5 46.9 57.8 46.4 45.0
2012
Mes Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Hrs. 121.5 131.4 116.8 154.9 173.7 160.9 142.3 171.4 176.5 223.1 202.9 123.4
Producción 8675 8214 9348 8124 9336 9350 9372 11628 11424 16500 15336 9348
PRD 71.42 62.52 80.04 52.42 53.73 58.09 65.87 67.84 64.73 73.94 75.58 75.74
66
productivas, sin que eso signifique incrementar los costos de la
administración.
incertidumbre, para poder de esta manera decidir sobre una base rigurosa
y confiable.
plantas, se torna una ventaja competitiva en pro del logro de una mayor
empresarial.
67
Diagramar lógico-funcionalmente la Planta de Chancado
aumento de la utilidad.
adecuado.
estudio de la chancadora.
68
CONCLUSIONES
68.47%, cabe mencionar, que usando este indicador, se tiene una mejor
69
RECOMENDACIONES
hacer un estudio sobre las causas y medidas de control para reducir las
70
4. La disponibilidad de la Planta se elevará si se hace hincapié en las
incrementar la disponibilidad.
71
REFERENCIA BIBLIOGRAFICA
72
ANEXO
73
NTROL DE HORÓMETROS Y VOLÚMENES DE PRODUCCIÓN EN PLANTA
DE CHANCADO
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
74
17/01/2012 Noche 1731.84 0 0 0 0
18/01/2012 Día 1731.84 0 0 0 0
18/01/2012 Noche 1731.84 0 0 0 0
19/01/2012 Día 1731.84 0 0 0 0
19/01/2012 Noche 1731.84 0 0 0 0
20/01/2012 Día 1731.84 0 0 0 0
20/01/2012 Noche 1731.84 0 0 0 0
21/01/2012 Día 1734.90 3.06 11 237.6 132
21/01/2012 Noche 1740.84 5.94 25 540 300
22/01/2012 Día 1743.88 3.04 8 172.8 96
22/01/2012 Noche 1747.84 3.96 16 345.6 192
23/01/2012 Día 1747.84 0 0 0
23/01/2012 Noche 1751.15 3.31 14 302.4 168
24/01/2012 Día 1751.62 0.47 1 21.6 12
24/01/2012 Noche 1756.59 4.97 15 324 180
25/01/2012 Día 1756.59 0 0 0 0
25/01/2012 Noche 1761.35 4.76 24 518.4 288
26/01/2012 Día 1763.06 1.71 10 216 120
26/01/2012 Noche 1766.74 3.68 15 324 180
27/01/2012 Día 1770.10 3.36 14 302.4 168
27/01/2012 Noche 1771.01 0.91 3 64.8 36
28/01/2012 Día 1771.01 0 0 0 0
28/01/2012 Noche 1771.01 0 0 0 0
29/01/2012 Día 1771.01 0 0 0 0
29/01/2012 Noche 1775.10 4.09 19 410.4 228
30/01/2012 Día 1775.10 0 0 0 0
30/01/2012 Noche 1775.10 0 0 0 0
31/01/2012 Día 1775.10 0 0 0 0
31/01/2012 Noche 1775.10 0 0 0 0
HORAS DE OPERACIÓN
TOTAL 121.46 402 8683.2 4824
3.918065
HORAS DE OPERACIÓN
TOTAL 1906.49 537 11599.2 6444
61.49968
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
HORAS DE OPERACIÓN
TOTAL 0 710 12376.8 6876
0
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
Producció
Horas n
Guardi Horómetr
Fecha Operació agregado
a o
n grueso
Volquetes Tn m3
2,073.0
Anterior
9
01/04/201 2,075.3
Día 2.21 15 324.00 180.00
2 0
01/04/201 2,081.5
Noche 6.26 33 712.80 396.00
2 6
02/04/201 2,081.7
Día 0.18 0 0.00 0.00
2 4
02/04/201 2,081.7
Noche 0.00 0 0.00 0.00
2 4
03/04/201 2,081.7
Día 0.00 0 0.00 0.00
2 4
03/04/201 2,087.0
Noche 5.28 21 453.60 252.00
2 2
04/04/201 2,090.6
Día 3.66 18 388.80 216.00
2 8
04/04/201 2,095.5
Noche 4.90 28 604.80 336.00
2 8
05/04/201 2,097.0
Día 1.48 1 21.60 12.00
2 6
05/04/201 2,100.4
Noche 3.37 10 216.00 120.00
2 3
06/04/201 2,101.2
Día 0.78 4 86.40 48.00
2 1
06/04/201 2,105.0
Noche 3.82 12 259.20 144.00
2 3
07/04/201 2,105.0
Día 0.00 0 0.00 0.00
2 3
07/04/201 Noche 2,110.1 5.15 19 410.40 228.00
79
2 8
08/04/201 2,110.2
Día 0.06 0 0.00 0.00
2 4
08/04/201 2,110.2
Noche 0.00 0 0.00 0.00
2 4
09/04/201 2,110.2
Día 0.00 0 0.00 0.00
2 4
09/04/201 2,114.8
Noche 4.64 22 475.20 264.00
2 8
10/04/201 2,114.8
Día 0.00 0 0.00 0.00
2 8
10/04/201 2,114.8
Noche 0.00 0 0.00 0.00
2 8
11/04/201 2,115.5
Día 0.63 4 86.40 48.00
2 1
11/04/201 2,115.5
Noche 0.00 0 0.00 0.00
2 1
12/04/201 2,118.6
Día 3.14 11 237.60 132.00
2 5
12/04/201 2,124.0
Noche 5.44 30 648.00 360.00
2 9
13/04/201 2,124.5
Día 0.49 3 64.80 36.00
2 8
13/04/201 2,129.9
Noche 5.41 23 496.80 276.00
2 9
14/04/201 2,132.7
Día 2.74 10 216.00 120.00
2 3
14/04/201 2,138.4
Noche 5.76 26 561.60 312.00
2 9
15/04/201 2,138.4
Día 0.00 0 0.00 0.00
2 9
15/04/201 2,143.5
Noche 5.10 30 648.00 360.00
2 9
16/04/201 2,148.3
Día 4.71 20 432.00 240.00
2 0
16/04/201 2,152.3
Noche 4.08 23 496.80 276.00
2 8
17/04/201 2,152.5
Día 0.16 0 0.00 0.00
2 4
17/04/201 2,156.7
Noche 4.24 20 432.00 240.00
2 8
18/04/201 2,156.7
Día 0.00 0 0.00 0.00
2 8
18/04/201 2,156.9
Noche 0.15 0 0.00 0.00
2 3
19/04/201 2,157.9
Día 0.97 0 0.00 0.00
2 0
80
19/04/201 2,157.9
Noche 0.05 0 0.00 0.00
2 5
20/04/201 2,158.0
Día 0.08 0 0.00 0.00
2 3
20/04/201 2,164.6
Noche 6.62 34 734.40 408.00
2 5
21/04/201 2,167.1
Día 2.52 20 432.00 240.00
2 7
21/04/201 2,173.7
Noche 6.59 25 540.00 300.00
2 6
22/04/201 2,173.8
Día 0.12 0 0.00 0.00
2 8
22/04/201 2,180.2
Noche 6.34 35 756.00 420.00
2 2
23/04/201 2,188.1
Día 7.88 0 0.00 0.00
2 0
23/04/201 2,188.1
Noche 0.00 0 0.00 0.00
2 0
24/04/201 2,191.1
Día 3.00 15 324.00 180.00
2 0
24/04/201 2,195.3
Noche 4.25 25 540.00 300.00
2 5
25/04/201 2,199.2
Día 3.86 25 540.00 300.00
2 1
25/04/201 2,199.2
Noche 0.00 0 0.00 0.00
2 1
26/04/201 2,199.2
Día 0.00 0 0.00 0.00
2 1
26/04/201 2,205.2
Noche 6.01 23 496.80 276.00
2 2
27/04/201 2,210.5
Día 5.35 28 604.80 336.00
2 7
27/04/201 2,216.1
Noche 5.57 24 518.40 288.00
2 4
28/04/201 2,216.1
Día 0.00 0 0.00 0.00
2 4
28/04/201 2,222.4
Noche 6.30 19 410.40 228.00
2 4
29/04/201 2,222.6
Día 0.18 0 0.00 0.00
2 2
29/04/201 2,222.6
Noche 0.00 0 0.00 0.00
2 2
30/04/201 2,224.5
Día 1.96 10 216.00 120.00
2 8
30/04/201 2,228.0
Noche 3.49 11 237.60 132.00
2 7
81
14,623. 8,124.0
RESULTADOS OPERACIÓN
154.98 677 20 0
PROMEDI
O 5.17 23 487.44 270.80
2.583
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
Producció
Horas n
Guardi Horómetr
Fecha Operació agregado
a o
n grueso
Volquetes Tn m3
2,228.0
Anterior
7
01/05/201 2,228.0
Día 0.00 0 0.00 0.00
2 7
01/05/201 2,228.0
Noche 0.00 0 0.00 0.00
2 7
02/05/201 2,228.0
Día 0.00 0 0.00 0.00
2 7
02/05/201 2,234.3
Noche 6.23 20 432.00 240.00
2 0
03/05/201 2,237.2
Día 2.97 15 324.00 180.00
2 7
03/05/201 2,240.2
Noche 2.98 08 172.80 96.00
2 5
04/05/201 2,241.3
Día 1.05 03 64.80 36.00
2 0
04/05/201 2,246.1
Noche 4.83 20 432.00 240.00
2 3
05/05/201 2,250.4
Día 4.35 16 345.60 192.00
2 8
05/05/201 2,255.9
Noche 5.43 15 324.00 180.00
2 1
06/05/201 2,256.1
Día 0.25 0 0.00 0.00
2 6
06/05/201 2,256.1
Noche 0.00 0 0.00 0.00
2 6
07/05/201 2,256.3
Día 0.19 0 0.00 0.00
2 5
07/05/201 2,261.8
Noche 5.53 14 302.40 168.00
2 8
08/05/201 Día 2,261.8 0.00 0 0.00 0.00
82
2 8
08/05/201 2,261.9
Noche 0.07 0 0.00 0.00
2 5
09/05/201 2,262.2
Día 0.25 0 0.00 0.00
2 0
09/05/201 2,264.3
Noche 2.10 06 129.60 72.00
2 0
10/05/201 2,264.3
Día 0.00 0 0.00 0.00
2 0
10/05/201 2,268.0
Noche 3.74 15 324.00 180.00
2 4
11/05/201 2,272.4
Día 4.44 20 432.00 240.00
2 8
11/05/201 2,279.1
Noche 6.62 30 648.00 360.00
2 0
12/05/201 2,283.3
Día 4.25 20 432.00 240.00
2 5
12/05/201 2,289.3
Noche 6.01 25 540.00 300.00
2 6
13/05/201 2,292.8
Día 3.48 16 345.60 192.00
2 4
13/05/201 2,297.9
Noche 5.12 25 540.00 300.00
2 6
14/05/201 2,297.9
Día 0.03 0 0.00 0.00
2 9
14/05/201 2,302.9
Noche 4.96 26 561.60 312.00
2 5
15/05/201 2,306.1
Día 3.18 11 237.60 132.00
2 3
15/05/201 2,309.5
Noche 3.39 20 432.00 240.00
2 2
16/05/201 2,309.5
Día 0.00 0 0.00 0.00
2 2
16/05/201 2,309.5
Noche 0.00 0 0.00 0.00
2 2
17/05/201 2,309.7
Día 0.21 0 0.00 0.00
2 3
17/05/201 2,315.6
Noche 5.96 17 367.20 204.00
2 9
18/05/201 2,320.9
Día 5.26 25 540.00 300.00
2 5
18/05/201 2,327.2
Noche 6.29 20 432.00 240.00
2 4
19/05/201 2,332.1
Día 4.86 27 583.20 324.00
2 0
19/05/201 2,335.5
Noche 3.47 12 259.20 144.00
2 7
83
20/05/201 2,341.7
Día 6.15 25 540.00 300.00
2 2
20/05/201 2,341.7
Noche 0.04 0 0.00 0.00
2 6
21/05/201 2,345.5
Día 3.80 18 388.80 216.00
2 6
21/05/201 2,350.4
Noche 4.93 20 432.00 240.00
2 9
22/05/201 2,352.2
Día 1.77 10 216.00 120.00
2 6
22/05/201 2,356.8
Noche 4.58 25 540.00 300.00
2 4
23/05/201 2,357.0
Día 0.20 01 21.60 12.00
2 4
23/05/201 2,360.7
Noche 3.67 15 324.00 180.00
2 1
24/05/201 2,361.9
Día 1.23 05 108.00 60.00
2 4
24/05/201 2,368.1
Noche 6.19 30 648.00 360.00
2 3
25/05/201 2,373.1
Día 5.01 21 453.60 252.00
2 4
25/05/201 2,377.9
Noche 4.83 26 561.60 312.00
2 7
26/05/201 2,383.8
Día 5.88 22 475.20 264.00
2 5
26/05/201 2,389.4
Noche 5.56 33 712.80 396.00
2 1
27/05/201 2,389.7
Día 0.37 0 0.00 0.00
2 8
27/05/201 2,394.5
Noche 4.74 20 432.00 240.00
2 2
28/05/201 2,400.2
Día 5.69 26 561.60 312.00
2 1
28/05/201 2,401.6
Noche 1.41 10 216.00 120.00
2 2
29/05/201 2,401.8
Día 0.22 0 0.00 0.00
2 4
29/05/201 2,405.8
Noche 4.01 20 432.00 240.00
2 5
30/05/201 2,405.8
Día 0.00 0 0.00 0.00
2 5
30/05/201 2,408.9
Noche 3.05 13 280.80 156.00
2 0
31/05/201 2,408.9
Día 0.00 0 0.00 0.00
2 0
31/05/201 Noche 2,412.3 3.45 12 259.20 144.00
84
2 5
16,804. 9,336.0
RESULTADOS OPERACIÓN
173.77 778 80 0
PROMEDI
O 5.61 25 542.09 301.16
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
Producció
Horas n
Guardi Horómetr
Fecha Operació agregado
a o
n grueso
Volquetes Tn m3
2,412.3
Anterior
5
01/06/201 2,413.9
Día 1.60 03 64.80 36.00
2 5
01/06/201 2,421.2
Noche 7.26 31 669.60 372.00
2 1
02/06/201 2,424.6
Día 3.40 13 280.80 156.00
2 1
02/06/201 2,428.0
Noche 3.43 15 324.00 180.00
2 4
03/06/201 2,430.3
Día 2.28 10 216.00 120.00
2 2
03/06/201 2,435.1
Noche 4.80 26 561.60 312.00
2 2
04/06/201 2,435.1
Día 0.00 0 0.00 0.00
2 2
04/06/201 2,437.6
Noche 2.56 10 216.00 120.00
2 8
05/06/201 2,437.6
Día 0.00 0 0.00 0.00
2 8
05/06/201 2,437.6
Noche 0.00 0 0.00 0.00
2 8
06/06/201 2,437.6
Día 0.00 0 0.00 0.00
2 8
06/06/201 2,437.6
Noche 0.00 0 0.00 0.00
2 8
07/06/201 2,437.6
Día 0.00 0 0.00 0.00
2 8
07/06/201 Noche 2,437.6 0.00 0 0.00 0.00
85
2 8
08/06/201 2,437.6
Día 0.00 0 0.00 0.00
2 8
08/06/201 2,437.6
Noche 0.00 0 0.00 0.00
2 8
09/06/201 2,437.6
Día 0.00 0 0.00 0.00
2 8
09/06/201 2,437.6
Noche 0.00 0 0.00 0.00
2 8
10/06/201 2,437.6
Día 0.00 0 0.00 0.00
2 8
10/06/201 2,437.6
Noche 0.00 0 0.00 0.00
2 8
11/06/201 2,437.6
Día 0.00 0 0.00 0.00
2 8
11/06/201 2,441.8
Noche 4.14 20 432.00 240.00
2 2
12/06/201 2,441.8
Día 0.00 0 0.00 0.00
2 2
12/06/201 2,447.0
Noche 5.23 30 648.00 360.00
2 5
13/06/201 2,450.8
Día 3.75 20 432.00 240.00
2 0
13/06/201 -
Noche 0.00 0.00
2 2,450.80
14/06/201
Día 0.00 0.00 0.00
2
14/06/201
Noche 0.00 0.00 0.00
2
15/06/201
Día 0.00 0.00 0.00
2
15/06/201
Noche 0.00 0.00 0.00
2
16/06/201
Día 0.00 0.00 0.00
2
16/06/201
Noche 0.00 0.00 0.00
2
17/06/201
Día 0.00 0.00 0.00
2
17/06/201
Noche 0.00 0.00 0.00
2
18/06/201
Día 0.00 0.00 0.00
2
18/06/201
Noche 0.00 0.00 0.00
2
19/06/201
Día 0.00 0.00 0.00
2
86
19/06/201
Noche 0.00 0.00 0.00
2
20/06/201
Día 0.00 0.00 0.00
2
20/06/201
Noche 0.00 0.00 0.00
2
21/06/201
Día 0.00 0.00 0.00
2
21/06/201
Noche 0.00 0.00 0.00
2
22/06/201
Día 0.00 0.00 0.00
2
22/06/201
Noche 0.00 0.00 0.00
2
23/06/201
Día 0.00 0.00 0.00
2
23/06/201
Noche 0.00 0.00 0.00
2
24/06/201
Día 0.00 0.00 0.00
2
24/06/201
Noche 0.00 0.00 0.00
2
25/06/201
Día 0.00 0.00 0.00
2
25/06/201
Noche 0.00 0.00 0.00
2
26/06/201
Día 0.00 0.00 0.00
2
26/06/201
Noche 0.00 0.00 0.00
2
27/06/201
Día 0.00 0.00 0.00
2
27/06/201
Noche 0.00 0.00 0.00
2
28/06/201
Día 0.00 0.00 0.00
2
28/06/201
Noche 0.00 0.00 0.00
2
29/06/201
Día 0.00 0.00 0.00
2
29/06/201
Noche 0.00 0.00 0.00
2
30/06/201
Día 0.00 0.00 0.00
2
30/06/201
Noche 0.00 0.00 0.00
2
87
- 3,844.8 2,136.0
RESULTADOS OPERACIÓN
2,412.35 178 0 0
PROMEDI
O -80.41 06 128.16 71.20
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
Producció
Horas n
Guardi Horómetr
Fecha Operació agregado
a o
n grueso
Volquetes Tn m3
2,642.2
Anterior
7
26/07/201 -
Día 0.00 0.00
2 2,642.27
26/07/201
Noche 0.00 0.00 0.00
2
27/07/201
Día 0.00 0.00 0.00
2
27/07/201
Noche 0.00 0.00 0.00
2
28/07/201
Día 0.00 0.00 0.00
2
28/07/201
Noche 0.00 0.00 0.00
2
29/07/201
Día 0.00 0.00 0.00
2
29/07/201
Noche 0.00 0.00 0.00
2
30/07/201
Día 0.00 0.00 0.00
2
30/07/201
Noche 0.00 0.00 0.00
2
31/07/201
Día 0.00 0.00 0.00
2
31/07/201
Noche 0.00 0.00 0.00
2
01/08/201
Día 0.00 0.00 0.00
2
01/08/201
Noche 0.00 0.00 0.00
2
02/08/201 Día 0.00 0.00 0.00
88
2
02/08/201
Noche 0.00 0.00 0.00
2
03/08/201
Día 0.00 0.00 0.00
2
03/08/201
Noche 0.00 0.00 0.00
2
04/08/201
Día 0.00 0.00 0.00
2
04/08/201
Noche 0.00 0.00 0.00
2
05/08/201
Día 0.00 0.00 0.00
2
05/08/201
Noche 0.00 0.00 0.00
2
06/08/201
Día 0.00 0.00 0.00
2
06/08/201
Noche 0.00 0.00 0.00
2
07/08/201
Día 0.00 0.00 0.00
2
07/08/201
Noche 0.00 0.00 0.00
2
08/08/201
Día 0.00 0.00 0.00
2
08/08/201
Noche 0.00 0.00 0.00
2
09/08/201
Día 0.00 0.00 0.00
2
09/08/201
Noche 0.00 0.00 0.00
2
10/08/201
Día 0.00 0.00 0.00
2
10/08/201
Noche 0.00 0.00 0.00
2
11/08/201
Día 0.00 0.00 0.00
2
11/08/201
Noche 0.00 0.00 0.00
2
12/08/201
Día 0.00 0.00 0.00
2
12/08/201
Noche 0.00 0.00 0.00
2
13/08/201
Día 0.00 0.00 0.00
2
13/08/201
Noche 0.00 0.00 0.00
2
89
14/08/201
Día 0.00 0.00 0.00
2
14/08/201
Noche 0.00 0.00 0.00
2
15/08/201
Día 0.00 0.00 0.00
2
15/08/201
Noche 0.00 0.00 0.00
2
16/08/201
Día 0.00 0.00 0.00
2
16/08/201
Noche 0.00 0.00 0.00
2
17/08/201
Día 0.00 0.00 0.00
2
17/08/201
Noche 0.00 0.00 0.00
2
18/08/201
Día 0.00 0.00 0.00
2
18/08/201
Noche 0.00 0.00 0.00
2
19/08/201
Día 0.00 0.00 0.00
2
19/08/201
Noche 0.00 0.00 0.00
2
20/08/201
Día 0.00 0.00 0.00
2
20/08/201
Noche 0.00 0.00 0.00
2
21/08/201
Día 0.00 0.00 0.00
2
21/08/201
Noche 0.00 0.00 0.00
2
22/08/201
Día 0.00 0.00 0.00
2
22/08/201
Noche 0.00 0.00 0.00
2
23/08/201
Día 0.00 0.00 0.00
2
23/08/201
Noche 0.00 0.00 0.00
2
24/08/201
Día 0.00 0.00 0.00
2
24/08/201
Noche 0.00 0.00 0.00
2
25/08/201
Día 0.00 0.00 0.00
2
25/08/201 Noche 0.00 0.00 0.00
90
2
-
RESULTADOS OPERACIÓN
2,642.27 0 0.00 0.00
PROMEDI
O -88.08 0 0.00 0.00
-
44.03783
3
REPORTE DE HORAS DE OPERACIÓNAGOSTO 2012
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
Producció
Horas n
Guardi Horómetr
Fecha Operació agregado
a o
n grueso
Volquetes Tn m3
2,813.6
Anterior
8
26/08/201 2,815.8
Día 2.20 09 194.40 108.00
2 8
26/08/201 2,815.8
Noche 0.00 0 0.00 0.00
2 8
27/08/201 2,821.4
Día 5.56 28 604.80 336.00
2 4
27/08/201 2,821.9
Noche 0.50 01 21.60 12.00
2 4
28/08/201 2,827.0
Día 5.12 23 496.80 276.00
2 6
28/08/201 2,831.7
Noche 4.73 30 648.00 360.00
2 9
29/08/201 2,838.3
Día 6.59 43 928.80 516.00
2 8
29/08/201 2,842.9
Noche 4.60 27 583.20 324.00
2 8
30/08/201 2,842.9
Día 0.00 0 0.00 0.00
2 8
30/08/201 2,845.5
Noche 2.58 17 367.20 204.00
2 6
31/08/201 2,846.3
Día 0.75 05 108.00 60.00
2 1
31/08/201 Noche 2,851.8 5.53 32 691.20 384.00
91
2 4
01/09/201 2,856.0
Día 4.18 30 648.00 360.00
2 2
01/09/201 2,859.6
Noche 3.64 22 475.20 264.00
2 6
02/09/201 2,860.2
Día 0.55 04 86.40 48.00
2 1
02/09/201 2,862.9
Noche 2.70 20 432.00 240.00
2 1
03/09/201 2,862.9
Día 0.00 0 0.00 0.00
2 1
03/09/201 2,865.7
Noche 2.83 19 410.40 228.00
2 4
04/09/201 2,871.6
Día 5.91 38 820.80 456.00
2 5
04/09/201 2,877.3
Noche 5.72 33 712.80 396.00
2 7
05/09/201 2,878.5
Día 1.22 10 216.00 120.00
2 9
05/09/201 2,882.4
Noche 3.83 27 583.20 324.00
2 2
06/09/201 2,884.5
Día 2.13 12 259.20 144.00
2 5
06/09/201 2,890.6
Noche 6.11 21 453.60 252.00
2 6
07/09/201 2,894.6
Día 3.99 25 540.00 300.00
2 5
07/09/201 2,898.8
Noche 4.21 21 453.60 252.00
2 6
08/09/201 2,901.5
Día 2.68 15 324.00 180.00
2 4
08/09/201 2,903.6
Noche 2.08 14 302.40 168.00
2 2
09/09/201 2,903.6
Día 0.00 0 0.00 0.00
2 2
09/09/201 2,905.1
Noche 1.57 09 194.40 108.00
2 9
10/09/201 2,907.3
Día 2.14 15 324.00 180.00
2 3
10/09/201 2,917.5
Noche 10.18 20 432.00 240.00
2 1
11/09/201 2,917.5
Día 0.00 0 0.00 0.00
2 1
11/09/201 2,917.5
Noche 0.00 0 0.00 0.00
2 1
12/09/201 2,917.5
Día 0.08 0 0.00 0.00
2 9
92
12/09/201 2,921.5
Noche 3.98 25 540.00 300.00
2 7
13/09/201 2,921.5
Día 0.00 0 0.00 0.00
2 7
13/09/201 2,921.5
Noche 0.00 0 0.00 0.00
2 7
14/09/201 2,924.9
Día 3.41 12 259.20 144.00
2 8
14/09/201 2,929.8
Noche 4.82 25 540.00 300.00
2 0
15/09/201 2,934.7
Día 4.97 27 583.20 324.00
2 7
15/09/201 2,941.6
Noche 6.85 32 691.20 384.00
2 2
16/09/201 2,941.6
Día 0.00 0 0.00 0.00
2 2
16/09/201 2,941.6
Noche 0.00 0 0.00 0.00
2 2
17/09/201 2,941.6
Día 0.00 0 0.00 0.00
2 2
17/09/201 2,941.6
Noche 0.00 0 0.00 0.00
2 2
18/09/201 2,942.8
Día 1.25 01 21.60 12.00
2 7
18/09/201 2,943.6
Noche 0.81 05 108.00 60.00
2 8
19/09/201 2,945.8
Día 2.14 11 237.60 132.00
2 2
19/09/201 2,945.9
Noche 0.10 0 0.00 0.00
2 2
20/09/201 2,945.9
Día 0.00 0 0.00 0.00
2 2
20/09/201 2,951.4
Noche 5.57 21 453.60 252.00
2 9
21/09/201 2,956.8
Día 5.31 31 669.60 372.00
2 0
21/09/201 2,961.8
Noche 5.00 21 453.60 252.00
2 0
22/09/201 2,964.0
Día 2.26 15 324.00 180.00
2 6
22/09/201 2,968.1
Noche 4.04 23 496.80 276.00
2 0
23/09/201 2,972.4
Día 4.32 30 648.00 360.00
2 2
23/09/201 2,972.4
Noche 0.00 0 0.00 0.00
2 2
24/09/201 Día 2,978.5 6.08 38 820.80 456.00
93
2 0
24/09/201 2,983.3
Noche 4.87 30 648.00 360.00
2 7
25/09/201 2,984.9
Día 1.57 08 172.80 96.00
2 4
25/09/201 2,990.1
Noche 5.23 27 583.20 324.00
2 7
20,563. 11,424.
RESULTADOS OPERACIÓN
176.49 952 20 00
PROMEDI
O 5.69 31 663.33 368.52
2.846612
9
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
Producció
Horas n
Guardi Horómetr
Fecha Operació agregado
a o
n grueso
Volquetes Tn m3
2,990.1
Anterior
7
26/09/201 2,990.1
Día 0.00 0 0.00 0.00
2 7
26/09/201 2,994.5
Noche 4.33 22 475.20 264.00
2 0
27/09/201 2,994.8
Día 0.32 0 0.00 0.00
2 2
27/09/201 2,994.8
Noche 0.03 0 0.00 0.00
2 5
28/09/201 2,999.0
Día 4.15 20 432.00 240.00
2 0
28/09/201 2,999.0
Noche 0.00 0 0.00 0.00
2 0
29/09/201 3,000.5
Día 1.51 12 259.20 144.00
2 1
29/09/201 3,004.8
Noche 4.32 18 388.80 216.00
2 3
30/09/201 3,010.9
Día 6.09 36 777.60 432.00
2 2
30/09/201 Noche 3,018.0 7.13 24 518.40 288.00
94
2 5
01/10/201 3,020.6
Día 2.60 17 367.20 204.00
2 5
01/10/201 3,025.5
Noche 4.91 24 518.40 288.00
2 6
02/10/201 3,031.0
Día 5.52 34 734.40 408.00
2 8
02/10/201 3,037.2
Noche 6.12 35 756.00 420.00
2 0
03/10/201 3,039.0
Día 1.85 12 259.20 144.00
2 5
03/10/201 3,044.5
Noche 5.47 28 604.80 336.00
2 2
04/10/201 3,046.3
Día 1.87 11 237.60 132.00
2 9
04/10/201 3,055.1
Noche 8.79 45 972.00 540.00
2 8
05/10/201 3,058.6
Día 3.48 21 453.60 252.00
2 6
05/10/201 3,064.6
Noche 5.97 34 734.40 408.00
2 3
06/10/201 3,066.0
Día 1.41 11 237.60 132.00
2 4
06/10/201 3,073.2
Noche 7.19 46 993.60 552.00
2 3
07/10/201 3,077.3
Día 4.09 22 475.20 264.00
2 2
07/10/201 3,084.4
Noche 7.08 42 907.20 504.00
2 0
08/10/201 3,087.4
Día 3.09 24 518.40 288.00
2 9
08/10/201 3,095.2
Noche 7.75 42 907.20 504.00
2 4
09/10/201 3,095.2
Día 0.02 0 0.00 0.00
2 6
09/10/201 3,101.1
Noche 5.92 35 756.00 420.00
2 8
10/10/201 3,105.0
Día 3.87 23 496.80 276.00
2 5
10/10/201 3,109.9
Noche 4.94 30 648.00 360.00
2 9
11/10/201 3,111.9
Día 1.97 15 324.00 180.00
2 6
11/10/201 3,117.9
Noche 6.01 37 799.20 444.00
2 7
12/10/201 3,121.9
Día 4.01 27 583.20 324.00
2 8
95
12/10/201 3,126.6
Noche 4.65 30 648.00 360.00
2 3
13/10/201 3,129.0
Día 2.46 15 324.00 180.00
2 9
13/10/201 3,133.1
Noche 4.04 31 669.60 372.00
2 3
14/10/201 3,133.1
Día 0.00 0 0.00 0.00
2 3
14/10/201 3,138.1
Noche 5.00 29 626.40 348.00
2 3
15/10/201 3,143.5
Día 5.43 36 777.60 432.00
2 6
15/10/201 3,149.8
Noche 6.32 40 864.00 480.00
2 8
16/10/201 3,157.0 1,144.8
Día 7.21 53 636.00
2 9 0
16/10/201 3,160.7
Noche 3.66 22 475.20 264.00
2 5
17/10/201 3,160.7
Día 0.00 0 0.00 0.00
2 5
17/10/201 3,164.6
Noche 3.93 25 540.00 300.00
2 8
18/10/201 3,164.6
Día 0.00 0 0.00 0.00
2 8
18/10/201 3,170.7
Noche 6.07 23 496.80 276.00
2 5
19/10/201 3,174.4
Día 3.65 17 367.20 204.00
2 0
19/10/201 3,176.1
Noche 1.70 10 216.00 120.00
2 0
20/10/201 3,177.5
Día 1.49 06 129.60 72.00
2 9
20/10/201 3,182.0
Noche 4.44 23 496.80 276.00
2 3
21/10/201 3,185.5
Día 3.51 22 475.20 264.00
2 4
21/10/201 3,193.0
Noche 7.48 40 864.00 480.00
2 2
22/10/201 3,195.4
Día 2.40 10 216.00 120.00
2 2
22/10/201 3,203.5 1,036.8
Noche 8.12 48 576.00
2 4 0
23/10/201 3,206.9
Día 3.42 15 324.00 180.00
2 6
23/10/201 3,213.3
Noche 6.35 43 928.80 516.00
2 1
24/10/201 Día 3,219.1 5.88 39 842.40 468.00
96
2 9
24/10/201 3,225.2
Noche 6.07 39 842.40 468.00
2 6
25/10/201 3,225.2
Día 0.01 0 0.00 0.00
2 7
25/10/201 3,226.0
Noche 0.78 12 259.20 144.00
2 5
29,700. 16,500.
RESULTADOS OPERACIÓN
223.14 1375 00 00
PROMEDI
O 7.44 46 990.00 550.00
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
Producció
Horas n
Guardi Horómetr
Fecha Operació agregado
a o
n grueso
Volquetes Tn m3
3,226.0
Anterior
5
26/10/201 3,226.0
Día 0.00 0 0.00 0.00
2 5
26/10/201 3,232.8
Noche 6.84 40 864.00 480.00
2 9
27/10/201 3,237.7
Día 4.87 30 648.00 360.00
2 6
27/10/201 3,240.2
Noche 2.46 15 324.00 180.00
2 2
28/10/201 3,244.1
Día 3.88 24 518.40 288.00
2 0
28/10/201 3,246.4
Noche 2.39 17 367.20 204.00
2 9
29/10/201 3,251.3
Día 4.87 28 604.80 336.00
2 6
29/10/201 3,256.9
Noche 5.56 43 928.80 516.00
2 2
30/10/201 3,261.8
Día 4.88 31 669.60 372.00
2 0
97
30/10/201 3,266.2
Noche 4.47 30 648.00 360.00
2 7
31/10/201 3,267.3
Día 1.05 07 151.20 84.00
2 2
31/10/201 3,273.7
Noche 6.43 46 993.60 552.00
2 5
01/11/201 3,278.8
Día 5.08 32 691.20 384.00
2 3
01/11/201 3,284.7 1,015.2
Noche 5.94 47 564.00
2 7 0
02/11/201 3,284.7
Día 0.00 0 0.00 0.00
2 7
02/11/201 3,289.1
Noche 4.41 31 669.60 372.00
2 8
03/11/201 3,289.1
Día 0.00 0 0.00 0.00
2 8
03/11/201 3,293.7
Noche 4.60 25 540.00 300.00
2 8
04/11/201 3,293.9
Día 0.19 0 0.00 0.00
2 7
04/11/201 3,300.6
Noche 6.65 40 864.00 480.00
2 2
05/11/201 3,304.8
Día 4.27 23 496.80 276.00
2 9
05/11/201 3,310.7
Noche 5.90 30 648.00 360.00
2 9
06/11/201 3,316.0
Día 5.21 32 691.20 384.00
2 0
06/11/201 3,321.9
Noche 5.94 35 756.00 420.00
2 4
07/11/201 3,324.5
Día 2.62 19 410.40 228.00
2 6
07/11/201 3,329.4
Noche 4.90 27 583.20 324.00
2 6
08/11/201 3,331.4
Día 1.94 14 302.40 168.00
2 0
08/11/201 3,331.4
Noche 0.00 0 0.00 0.00
2 0
09/11/201 3,331.4
Día 0.09 0 0.00 0.00
2 9
09/11/201 3,334.2
Noche 2.78 19 410.40 228.00
2 7
10/11/201 3,338.2
Día 3.97 24 518.40 288.00
2 4
10/11/201 3,344.1
Noche 5.87 38 820.80 456.00
2 1
11/11/201 Día 3,344.1 0.00 0 0.00 0.00
98
2 1
11/11/201 3,350.0
Noche 5.95 35 756.00 420.00
2 6
12/11/201 3,353.1
Día 3.13 15 324.00 180.00
2 9
12/11/201 3,359.8
Noche 6.62 41 885.60 492.00
2 1
13/11/201 3,362.2
Día 2.45 14 302.40 168.00
2 6
13/11/201 3,368.7
Noche 6.45 37 799.20 444.00
2 1
14/11/201 3,368.7
Día 0.00 0 0.00 0.00
2 1
14/11/201 3,375.1
Noche 6.43 38 820.80 456.00
2 4
15/11/201 3,375.2
Día 0.12 0 0.00 0.00
2 6
15/11/201 3,378.7
Noche 3.51 24 518.40 288.00
2 7
16/11/201 3,378.8
Día 0.11 0 0.00 0.00
2 8
16/11/201 3,384.3
Noche 5.43 32 691.20 384.00
2 1
17/11/201 3,388.9
Día 4.60 27 583.20 324.00
2 1
17/11/201 3,394.6
Noche 5.74 36 777.60 432.00
2 5
18/11/201 3,399.8
Día 5.20 30 648.00 360.00
2 5
18/11/201 3,400.1
Noche 0.27 03 64.80 36.00
2 2
19/11/201 3,400.1
Día 0.00 0 0.00 0.00
2 2
19/11/201 3,400.1
Noche 0.00 0 0.00 0.00
2 2
20/11/201 3,404.4
Día 4.33 25 540.00 300.00
2 5
20/11/201 3,408.8
Noche 4.41 30 648.00 360.00
2 6
21/11/201 3,411.8
Día 3.01 16 345.60 192.00
2 7
21/11/201 3,414.3
Noche 2.44 20 432.00 240.00
2 1
22/11/201 3,415.4
Día 1.15 08 172.80 96.00
2 6
22/11/201 3,417.7
Noche 2.33 12 259.20 144.00
2 9
99
23/11/201 3,417.7
Día 0.00 0 0.00 0.00
2 9
23/11/201 3,417.7
Noche 0.00 0 0.00 0.00
2 9
24/11/201 3,417.7
Día 0.00 0 0.00 0.00
2 9
24/11/201 3,418.9
Noche 1.16 09 194.40 108.00
2 5
25/11/201 3,422.5
Día 3.64 31 669.60 372.00
2 9
25/11/201 3,428.9 1,036.8
Noche 6.36 48 576.00
2 5 0
27,604. 15,336.
RESULTADOS OPERACIÓN
202.90 1278 80 00
PROMEDI
O 6.55 41 890.48 494.71
Volumen de volquetes 12 m3
Densidad aparente 1800 kg/m3
Producció
Horas n
Guardi Horómetr
Fecha Operació agregado
a o
n grueso
Volquetes Tn m3
3,428.9
Anterior
5
26/11/201 3,428.9
Día 0.00 0 0.00 0.00
2 5
26/11/201 3,432.6
Noche 3.71 26 561.60 312.00
2 6
27/11/201 3,433.5
Día 0.84 10 216.00 120.00
2 0
27/11/201 3,434.7
Noche 1.22 11 237.60 132.00
2 2
28/11/201 3,434.7
Día 0.00 0 0.00 0.00
2 2
28/11/201 3,434.7
Noche 0.00 0 0.00 0.00
2 2
29/11/201 3,439.4
Día 4.77 26 561.60 312.00
2 9
29/11/201 3,442.2
Noche 2.76 17 367.20 204.00
2 5
100
30/11/201 3,442.2
Día 0.00 0 0.00 0.00
2 5
30/11/201 3,442.2
Noche 0.00 0 0.00 0.00
2 5
01/12/201 3,445.7
Día 3.53 18 388.80 216.00
2 8
01/12/201 3,449.1
Noche 3.38 18 388.80 216.00
2 6
02/12/201 3,451.7
Día 2.59 15 324.00 180.00
2 5
02/12/201 3,457.7
Noche 5.96 33 712.80 396.00
2 1
03/12/201 3,462.5
Día 4.79 32 691.20 384.00
2 0
03/12/201 3,468.1
Noche 5.64 38 820.80 456.00
2 4
04/12/201 3,472.4
Día 4.29 26 561.60 312.00
2 3
04/12/201 3,478.4
Noche 5.99 40 864.00 480.00
2 2
05/12/201 3,483.8
Día 5.45 32 691.20 384.00
2 7
05/12/201 3,490.4
Noche 6.55 42 907.20 504.00
2 2
06/12/201 3,490.4
Día 0.00 0 0.00 0.00
2 2
06/12/201 3,492.6
Noche 2.26 16 345.60 192.00
2 8
07/12/201 3,492.6
Día 0.00 0 0.00 0.00
2 8
07/12/201 3,495.5
Noche 2.85 17 367.20 204.00
2 3
08/12/201 3,498.9
Día 3.45 22 475.20 264.00
2 8
08/12/201 3,502.4
Noche 3.50 25 540.00 300.00
2 8
09/12/201 3,502.6
Día 0.12 0 0.00 0.00
2 0
09/12/201 3,502.6
Noche 0.00 0 0.00 0.00
2 0
10/12/201 3,506.7
Día 4.14 25 540.00 300.00
2 4
10/12/201 3,512.7
Noche 6.04 32 691.20 384.00
2 8
11/12/201 3,514.4
Día 1.64 13 280.80 156.00
2 2
11/12/201 Noche 3,514.4 0.00 0 0.00 0.00
101
2 2
12/12/201 3,514.4
Día 0.00 0 0.00 0.00
2 2
12/12/201 3,518.7
Noche 4.33 26 561.60 312.00
2 5
13/12/201 3,518.7
Día 0.00 0 0.00 0.00
2 5
13/12/201 3,521.9
Noche 3.22 18 388.80 216.00
2 7
14/12/201 3,522.2
Día 0.30 0 0.00 0.00
2 7
14/12/201 3,526.2
Noche 3.97 27 583.20 324.00
2 4
15/12/201 3,530.3
Día 4.06 28 604.80 336.00
2 0
15/12/201 3,535.3
Noche 5.01 29 626.40 348.00
2 1
16/12/201 3,535.3
Día 0.00 0 0.00 0.00
2 1
16/12/201 3,535.3
Noche 0.00 0 0.00 0.00
2 1
17/12/201 3,535.3
Día 0.00 0 0.00 0.00
2 1
17/12/201 3,536.4
Noche 1.12 07 151.20 84.00
2 3
18/12/201 3,536.4
Día 0.00 0 0.00 0.00
2 3
18/12/201 3,536.4
Noche 0.00 0 0.00 0.00
2 3
19/12/201 3,536.4
Día 0.01 0 0.00 0.00
2 4
19/12/201 3,536.4
Noche 0.00 0 0.00 0.00
2 4
20/12/201 3,536.4
Día 0.00 0 0.00 0.00
2 4
20/12/201 3,536.4
Noche 0.00 0 0.00 0.00
2 4
21/12/201 3,539.5
Día 3.11 17 367.20 204.00
2 5
21/12/201 3,539.5
Noche 0.00 0 0.00 0.00
2 5
22/12/201 3,539.5
Día 0.03 0 0.00 0.00
2 8
22/12/201 3,539.5
Noche 0.00 0 0.00 0.00
2 8
23/12/201 3,539.7
Día 0.13 0 0.00 0.00
2 1
102
23/12/201 3,544.2
Noche 4.54 32 691.20 384.00
2 5
24/12/201 3,544.9
Día 0.72 05 108.00 60.00
2 7
24/12/201 3,550.9
Noche 5.95 45 972.00 540.00
2 2
25/12/201 3,550.9
Día 0.00 0 0.00 0.00
2 2
25/12/201 3,552.3
Noche 1.46 11 237.60 132.00
2 8
16,826. 9,348.0
RESULTADOS OPERACIÓN
123.43 779 40 0
PROMEDI
O 4.11 26 560.88 311.60
103
TÍTULO: OPTIMIZACIÓN DE INDICADORES DE
MANTENIMIENTO PARA MEJORAR LA PRODUCTIVIDAD DE
LA PLANTA CHANCADORA DE AGREGADOS DE LA EMPRESA MULTICOSAILOR – ISCAYCRUZ
AUTOR: ALFREDO MASSIEL ORELLANA FLORES
MATRIZ DE CONSISTENCIA
Diseño
Problema Objetivo Hipótesis Variables Indicador Instrumento Fuente
Metodológico
104
105