Sunteți pe pagina 1din 30

LAPORAN MINGGUA

MINGGU PERTAMA

NO JENIS PEKERJAAN SATUAN VOLUME

PEKERJAAN PERSIAPAN
I
1 PEMBERSIHAN LAPANGAN LS 1.00
2 PENGADAAN AIR BERSIH LS 1.00
3 UITZET DAN PASANG BOUWPLANK M 18
4 PEMBUATAN PERANCAH LS 2
5 PEMBUATAN BARAK DIREKSI M² 6
6 PEMBUATAN PAGAR PENGAMAN M² 42
7 PAPAN NAMA KAGIATAN LS 1.00
8 ADMINISTRASI DAN DOKUMENTASI LS 1.00

II PEKERJAAN TANAH
1 GALIAN TANAH M³ 38.475
2 URUKAN KEMBALI M³ 12.825
3 URUKAN PASIR BAWAH PONDASI M³ 3.8475

LAPORAN MINGGUA
MINGGU KEDUA

NO JENIS PEKERJAAN SATUAN VOLUME

III PEKERJAAN PASANGAN


1 PASANGAN BATU KALI 1 : 6 M³ 14.9625
2 PASANGAN BATU KOSONG M³ 5.985
3 PASANGAN BATU MERAH 1 : 6 M² 139.55
4 PLESTERAN DINDING 1 : 3 : 10 M² 279.1
5 PEKERJAAN ACIAN M² 279.1
6 PEKERJAAN SKONING M 49.8
7 PEKERJAAN CAT DINDING M² 279.1

IV PEKERJAAN BETON

1 SLOOF BETON BERTULANG 1 : 2 : 3 M³ 1.2825


2 KOLOM BETON STRUKTUR 15/20 M³ 1.254
3 KOLOM BETON KONOMI 20/20 M³ 0.304
4 RING BALK BETON BERTULUNG 15/15 M³ 0.961875
5 RABAT BETON 1 : 3 M³ 0

LAPORAN MINGGUA
MINGGU KETIGA

NO JENIS PEKERJAAN SATUAN VOLUME

III PEKERJAAN PASANGAN


1 PASANGAN BATU KALI 1 : 6 M³ 14.9625
2 PASANGAN BATU KOSONG M³ 5.985
3 PASANGAN BATU MERAH 1 : 6 M² 139.55
4 PLESTERAN DINDING 1 : 3 : 10 M² 279.1
5 PEKERJAAN ACIAN M² 279.1
6 PEKERJAAN SKONING M 49.8
7 PEKERJAAN CAT DINDING M² 279.1

IV PEKERJAAN BETON
1 SLOOF BETON BERTULANG 1 : 2 : 3 M³ 1.2825
2 KOLOM BETON STRUKTUR 15/20 M³ 1.254
3 KOLOM BETON KONOMI 20/20 M³ 0.304
4 RING BALK BETON BERTULUNG 15/15 M³ 0.961875
5 RABAT BETON 1 : 3 M³ 0

V PEKERJAAN KOZEN PINTU DAN JENDELA


1 PASANG KOZEN PINTU DAN JENDELA M³ 0.7123
2 PASANG DAUN PINTU PANIL M² 3.6
3 PASANG DAUN JENDELA KACA RANGKA KAYU M² 2
4 PASANG KACA JENDELA 5 mm M² 14.56

LAPORAN MINGGUA
MINGGU KEEMPAT

NO JENIS PEKERJAAN SATUAN VOLUME

III PEKERJAAN PASANGAN


1 PASANGAN BATU KALI 1 : 6 M³ 357175.00
2 PASANGAN BATU KOSONG M³ 195128.64
3 PASANGAN BATU MERAH 1 : 6 M² 63380.00
4 PLESTERAN DINDING 1 : 3 : 10 M² 17692.00
5 PEKERJAAN ACIAN M² 13520.00
6 PEKERJAAN SKONING M 2000.00
7 PEKERJAAN CAT DINDING M² 10660.60
IV PEKERJAAN BETON
1 SLOOF BETON BERTULANG 1 : 2 : 3 M³ 1.2825
2 KOLOM BETON STRUKTUR 15/20 M³ 1.254
3 KOLOM BETON KONOMI 20/20 M³ 0.304
4 RING BALK BETON BERTULUNG 15/15 M³ 0.961875
5 RABAT BETON 1 : 3 M³ 0

V PEKERJAAN KOZEN PINTU DAN JENDELA


1 PASANG KOZEN PINTU DAN JENDELA M³ 0.7123
2 PASANG DAUN PINTU PANIL M² 3.6
3 PASANG DAUN JENDELA KACA RANGKA KAYU M² 2
4 PASANG KACA JENDELA 5 mm M² 14.56
LAPORAN BULANA
BULAN PERTAMA

NO JENIS PEKERJAAN SATUAN VOLUME


I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III PEKERJAAN PASANGAN
1 PASANGAN BATU KALI 1 : 6 M³ 14.9625
2 PASANGAN BATU KOSONG M³ 5.985
3 PASANGAN BATU MERAH 1 : 6 M² 139.55
4 PLESTERAN DINDING 1 : 3 : 10 M² 279.1
5 PEKERJAAN ACIAN M² 279.1
6 PEKERJAAN SKONING M 49.8
7 PEKERJAAN CAT DINDING M² 279.1
IV PEKERJAAN BETON
1 SLOOF BETON BERTULANG 1 : 2 : 3 M³ 1.2825
2 KOLOM BETON STRUKTUR 15/20 M³ 1.254
3 KOLOM BETON KONOMI 20/20 M³ 0.304
4 RING BALK BETON BERTULUNG 15/15 M³ 0.961875
5 RABAT BETON 1 : 3 M³ 0
V PEKERJAAN KOZEN PINTU DAN JENDELA
1 PASANG KOZEN PINTU DAN JENDELA M³ 0.7123
2 PASANG DAUN PINTU PANIL M² 3.6
3 PASANG DAUN JENDELA KACA RANGKA KAYU M² 2
4 PASANG KACA JENDELA 5 mm M² 14.56
LAPORAN MINGGUAN
MINGGU PERTAMA

HASIL PEKERJAAN NILAI


BOBOT % JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN

0.148244 - 0.148244 0.148244 100%


0.185305 - 0.185305 0.185305 100%
0.446543 - 0.446543 0.446543 100%
0.185305 - 0.185305 0.185305 100%
1.858827 - 1.858827 1.858827 100%
5.340242 - 5.340242 5.340242 100%
0.185305 - 0.185305 0.185305 100%
0.592977 - 0.592977 0.592977 100%

0.740768 - 0.740768 0.740768 100%


0.068003 - 0.068003 0.068003 100%
0.275671 - 0.275671 0.275671 100%

LAPORAN MINGGUAN
MINGGU KEDUA

HASIL PEKERJAAN
NILAI
BOBOT % JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN

3.961258 - 3.961258 3.961258 100%


0.865631 - 0.865631 0.865631 100%
6.555864 - 1.595804 1.595804 24%
3.66003 - - - -
2.796948 - - - -
0.073826 - - - -
2.20541 - - - -

3.577307 - 3.577307 4.577307 100%


2.571638 - - - -
0.134629 - - - -
3.804703 - - -
0 - - -

LAPORAN MINGGUAN
MINGGU KETIGA

HASIL PEKERJAAN
NILAI
BOBOT % JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN

3.961258 3.961258 - 3.961258 100%


0.865631 0.865631 - 0.865631 100%
6.555864 1.595804 4.96006 6.555864 100%
3.66003 - 1.307641 1.307641 36%
2.796948 - - - -
0.073826 - - - -
2.20541 - - - -

3.577307 3.577307 - 4.577307 100%


2.571638 - - - -
0.134629 - - - -
3.804703 - - -
0 - - -

3.732326 - 3.732326 3.732326 100%


0.982103 - - - -
0.246449 - - - -
0.954838 - - - -

LAPORAN MINGGUAN
MINGGU KEEMPAT

HASIL PEKERJAAN
NILAI
BOBOT % JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN

3.961258 3.961258 - 3.961258 100%


0.865631 0.865631 - 0.865631 100%
6.555864 6.555864 - 6.555864 100%
3.66003 1.307641 2.352389 3.66003 100%
2.796948 - 2.796948 2.796948 100%
0.073826 - - - -
2.20541 - - - -

3.577307 3.577307 - 3.577307 100%


2.571638 - 2.571638 2.571638 100%
0.134629 - 0.134629 0.134629 100%
3.804703 - 2.293733 2.293733 60%
0 - - - -

3.732326 3.732326 - 3.732326 100%


0.982103 - - - -
0.246449 - - - -
0.954838 - - - -
LAPORAN BULANAN
BULAN PERTAMA

HASIL PEKERJAAN NILAI


BOBOT % JUMLAH
BULAN LALU BULAN INI PELAKSANAAN
- 8.942749 8.942749 100%
- 1.084442 1.084442 100%

3.961258 - 3.961258 3.961258 100%


0.865631 - 0.865631 0.865631 100%
6.555864 - 6.555864 6.555864 100%
3.66003 - 3.66003 3.66003 100%
2.796948 - 2.796948 2.796948 100%
0.073826 - - - -
2.20541 - - - -

3.577307 - 3.577307 3.577307 100%


2.571638 - 2.571638 2.571638 100%
0.134629 - 0.134629 0.134629 100%
3.804703 - 2.293733 2.293733 60%
0 -

3.732326 - 3.732326 3.732326 100%


0.982103 - - - -
0.246449 - - - -
0.954838 - - - -
NILAI
PENYELESAIAN

0.148244
0.185305
0.446543
0.185305
1.858827
5.340242
0.185305
0.592977

0.740768
0.068003
0.275671

NILAI
PENYELESAIAN

3.961258
0.865631
1.595804
-
-
-
-

4.577307
-
-

NILAI
PENYELESAIAN

3.961258
0.865631
1.595804
1.307641
-
-
-

4.577307
-
-
-

3.732326

NILAI
PENYELESAIAN

3.961258
0.865631
1.595804
1.307641
2.796948
-
-

3.577307
2.571638
0.134629
2.293733
-

3.732326
NILAI
PENYELESAIAN
8.942749
1.084442

3.961258
0.865631
6.555864
3.66003
2.796948
-
-

3.577307
2.571638
0.134629
2.293733

3.732326
-
-
-
LAPORAN MINGGUA
MINGGU KELIMA

NO JENIS PEKERJAAN SATUAN VOLUME

III PEKERJAAN PASANGAN


1 PASANGAN BATU KALI 1 : 6 M³ 14.9625
2 PASANGAN BATU KOSONG M³ 5.985
3 PASANGAN BATU MERAH 1 : 6 M² 139.55
4 PLESTERAN DINDING 1 : 3 : 10 M² 279.1
5 PEKERJAAN ACIAN M² 279.1
6 PEKERJAAN SKONING M 49.8
7 PEKERJAAN CAT DINDING M² 279.1

IV PEKERJAAN BETON

1 SLOOF BETON BERTULANG 1 : 2 : 3 M³ 1.2825


2 KOLOM BETON STRUKTUR 15/20 M³ 1.254
3 KOLOM BETON KONOMI 20/20 M³ 0.304
4 RING BALK BETON BERTULUNG 15/15 M³ 0.961875
5 RABAT BETON 1 : 3 M³ 0

V PEKERJAAN KOZEN PINTU DAN JENDELA


1 PASANG KOZEN PINTU DAN JENDELA M³ 0.7123
2 PASANG DAUN PINTU PANIL M² 3.6
3 PASANG DAUN JENDELA KACA RANGKA KAYU M² 2
4 PASANG KACA JENDELA 5 mm M² 14.56
VIII PEKERJAAN LANTAI
1 RABAT BETON BAWAH LANTAN M³ 3
2 PASANG LANTAI KERAMIK 30 X 30 cm M² 60
3 PASANG KERAMIK DINDING 20 X 25 cm M² 7
4 PASANG LIS DINDING M -
LAPORAN MINGGUA
MINGGU KEENAM

NO JENIS PEKERJAAN SATUAN VOLUME

V PEKERJAAN KOZEN PINTU DAN JENDELA


1 PASANG KOZEN PINTU DAN JENDELA M³ 0.7123
2 PASANG DAUN PINTU PANIL M² 3.6
3 PASANG DAUN JENDELA KACA RANGKA KAYU M² 2
4 PASANG KACA JENDELA 5 mm M² 14.56
VI PEKERJAAN KAYU DAN ATAP
1 PASANG KUDA-KUDA KAYU KRUING M³ 0.6912
2 PASANG MURPLAT, GORDING, NOOK M³ 0.6144
3 PASANG USUK 5/7 RENG JATI 2/3 M² 138
4 PASANG GENTING PRESS LOKAL M² 138
5 PASANG BUMBUNGAN PRESS M 14
6 PASANG LISPLANG KAYU KRUING 2/20 M 49
7 PASANG TALANG DATAR SENG BWG M 49

LAPORAN MINGGUA
MINGGU KETUJUH

NO JENIS PEKERJAAN SATUAN VOLUME

VI PEKERJAAN KAYU DAN ATAP


1 PASANG KUDA-KUDA KAYU KRUING M³ 0.6912
2 PASANG MURPLAT, GORDING, NOOK M³ 0.6144
3 PASANG USUK 5/7 RENG JATI 2/3 M² 138
4 PASANG GENTING PRESS LOKAL M² 138
5 PASANG BUMBUNGAN PRESS M 14
6 PASANG LISPLANG KAYU KRUING 2/20 M 49
7 PASANG TALANG DATAR SENG BWG M 49

LAPORAN MINGGUA
MINGGU KEDELAPAN

NO JENIS PEKERJAAN SATUAN VOLUME

VI PEKERJAAN KAYU DAN ATAP


1 PASANG KUDA-KUDA KAYU KRUING M³ 0.6912
2 PASANG MURPLAT, GORDING, NOOK M³ 0.6144
3 PASANG USUK 5/7 RENG JATI 2/3 M² 138
4 PASANG GENTING PRESS LOKAL M² 138
5 PASANG BUMBUNGAN PRESS M 14
6 PASANG LISPLANG KAYU KRUING 2/20 M 49
7 PASANG TALANG DATAR SENG BWG M 49
VII PEKERJAAN PLAFOND
1 PLAFOND KAYU KRUING 1 X 1 m M² 102
2 PASANG ETERNIT 1 X 1 m M² 102
3 PASANG LIS PLAFOND M 132
4 CAT PLAFOND M² 102
LAPORAN BULANAN
BULAN KEDUA

NO JENIS PEKERJAAN SATUAN VOLUME

III PEKERJAAN PASANGAN


IV PEKERJAAN BETON
V PEKERJAAN KOZEN PINTU DAN JENDELA
VI PEKERJAAN KAYU DAN ATAP
VII PEKERJAAN PLAFOND
1 PLAFOND KAYU KRUING 1 X 1 m M² 102
2 PASANG ETERNIT 1 X 1 m M² 102
3 PASANG LIS PLAFOND M 132
4 CAT PLAFOND M² 102
VIII PEKERJAAN LANTAI
1 RABAT BETON BAWAH LANTAN M³ 3
2 PASANG LANTAI KERAMIK 30 X 30 cm M² 60
3 PASANG KERAMIK DINDING 20 X 25 cm M² 7
4 PASANG LIS DINDING M -
APORAN MINGGUAN
MINGGU KELIMA

HASIL PEKERJAAN NILAI


BOBOT % JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN

3.961258 3.961258 - 3.961258 100%


0.865631 0.865631 - 0.865631 100%
6.555864 6.555864 - 6.555864 100%
3.66003 3.66003 - 3.66003 100%
2.796948 2.796948 - 2.796948 100%
0.073826 - 0.073826 0.073826 100%
2.20541 - 2.20541 2.20541 100%

3.577307 3.577307 - 3.577307 100%


2.571638 2.571638 - 2.571638 100%
0.134629 0.134629 - 0.134629 100%
3.804703 2.293733 1.51097 3.804703 100%
0 - - - -

3.732326 3.732326 - 3.732326 100%


0.982103 - - - -
0.246449 - 0.246449 0.246449 100%
0.954838 - - - -

1.100418 - 1.100418 1.100418 100%


4.602673 - 4.602673 4.602673 100%
0.517973 - 0.517973 0.517973 100%
- - - - -
APORAN MINGGUAN
MINGGU KEENAM

HASIL PEKERJAAN NILAI


BOBOT % JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN

3.732326 3.732326 - 3.732326 100%


0.982103 - 0.982103 0.982103 100%
0.246449 0.246449 - 0.246449 100%
0.954838 - 0.954838 0.954838 100%

3.032699 - 3.032699 3.032699 100%


2.695732 - 2.695732 2.695732 100%
8.428064 - 2.471569 2.471569 29%
2.411861 - - - -
0.374406 - - - -
1.448617 - - - -
7.128441 - - - -

APORAN MINGGUAN
MINGGU KETUJUH

HASIL PEKERJAAN NILAI


BOBOT % JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN

3.032699 3.032699 - 3.032699 100%


2.695732 2.695732 - 2.695732 100%
8.428064 2.471569 5.956495 8.428064 100%
2.411861 - 2.411861 2.411861 100%
0.374406 - 0.374406 0.374406 100%
1.448617 - 0.724309 0.724309 50%
7.128441 - 0.732929 0.732929 10%

APORAN MINGGUAN
MINGGU KEDELAPAN

HASIL PEKERJAAN NILAI


BOBOT % JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN

3.032699 3.032699 - 3.032699 100%


2.695732 2.695732 - 2.695732 100%
8.428064 8.428064 - 8.428064 100%
2.411861 2.411861 - 2.411861 100%
0.374406 0.374406 - 0.374406 100%
1.448617 0.724309 0.724309 1.448617 100%
7.128441 0.732929 6.395512 7.128441 100%

6.428278 - 3 3 47%
1.240822 - - - -
1.426525 - - - -
0.80599 - - - -
LAPORAN BULANAN
BULAN KEDUA

HASIL PEKERJAAN NILAI


BOBOT % JUMLAH
BULAN LALU BULAN INI PELAKSANAAN
20.118967 17.83973 2.279237 20.118967 100%
10.088277 8.577307 1.51097 10.088277 100%
5.915716 3.732326 2.18339 5.915716 100%
25.51982 - 25.51982 25.51982 100%

6.428278 - 3 3 47%
1.240822 - - - -
1.426525 - - - -
0.80599 - - - -

1.100418 - 1.100418 1.100418 100%


4.602673 - 4.602673 4.602673 100%
0.517973 - 0.517973 0.517973 100%
- - - - -
NILAI
PENYELESAIAN

3.961258
0.865631
6.555864
3.66003
2.796948
0.073826
2.20541

3.577307
2.571638
0.134629
3.804703
-

3.732326

0.246449

1.100418
4.602673
0.517973
-
NILAI
PENYELESAIAN

3.732326
0.982103
0.246449
0.954838

3.032699
2.695732
2.471569
-
-
-
-

NILAI
PENYELESAIAN

3.032699
2.695732
8.428064
2.411861
0.374406
0.724309
0.732929

NILAI
PENYELESAIAN

3.032699
2.695732
8.428064
2.411861
0.374406
1.448617
7.128441

3
-
-
-
NILAI
PENYELESAIAN
20.118967
10.088277
5.915716
25.51982

3
-
-
-

1.100418
4.602673
0.517973
-
LAPORAN MINGGUAN
MINGGU KESEMBILAN

NO JENIS PEKERJAAN SATUAN VOLUME BOBOT %


VII PEKERJAAN PLAFOND
1 PLAFOND KAYU KRUING 1 X 1 m M² 102 6.428278
2 PASANG ETERNIT 1 X 1 m M² 102 1.240822
3 PASANG LIS PLAFOND M 132 1.426525
4 CAT PLAFOND M² 102 0.80599
IX PEKERJAAN INSTAPLASI LISTRIK
1 STOP KONTAK Bh 2 0.023719
2 SAKLAR GANDA Bh 3 0.033355
3 LAMPU PIJAR 25 watt Bh 2 0.037061
4 KABEL OVERSPONING M 40 0.074122
5 LAMPU SL 18 watt Bh 5 0.100991
X PEKERJAAN PENGUNCI DAN PENGGANTUNG
1 KUNCI TANAM 2 X PUTAR Bh 2 0.174888
2 ENGSEL PINTU H 12 cm Bh 4 0.060453
3 ENGSEL JENDELA Bh 20 0.211589
4 ENGSEL PINTU H 12 cm Bh 2 0.018531
5 GRENDEL JENDELA Bh 10 0.074122
6 KAIT ANGIN PINTU DAN JENDELA Bh 10 0.110883
7 HAK ANGIN PINTU DAN JENDELA Bh 10 0.110883
XI PEKERJAAN CAT DAN FINISING
1 CAT TEMBOK M² 134.87 1.065724
2 CAT KAYU M² 5.6 0.112099
3 PEMBERSIAN HALAMAN Ls 1.00 0.111183
4 PEMELIHARAAN TANAMAN / TAMAN Ls 1.00 0.33355
5 PERBAIKAN KEMBALI KONTRUKSI / FISIK Ls 1.00 0.463263
6 PPN 10% 10% 9.090933
LAPORAN MINGGUAN
MINGGU KESEPULUH

NO JENIS PEKERJAAN SATUAN VOLUME BOBOT %


XI PEKERJAAN CAT DAN FINISING
1 CAT TEMBOK M² 134.87 1.065724
2 CAT KAYU M² 5.6 0.112099
3 PEMBERSIAN HALAMAN Ls 1.00 0.111183
4 PEMELIHARAAN TANAMAN / TAMAN Ls 1.00 0.33355
5 PERBAIKAN KEMBALI KONTRUKSI / FISIK Ls 1.00 0.463263
6 PPN 10% 10% 9.090933

LAPORAN BULANAN
BULAN KETIGA

NO JENIS PEKERJAAN SATUAN VOLUME BOBOT %


VII PEKERJAAN PLAFOND
1 PLAFOND KAYU KRUING 1 X 1 m M² 102 6.428278
2 PASANG ETERNIT 1 X 1 m M² 102 1.240822
3 PASANG LIS PLAFOND M 132 1.426525
4 CAT PLAFOND M² 102 0.80599
IX PEKERJAAN INSTAPLASI LISTRIK
1 STOP KONTAK Bh 2 0.023719
2 SAKLAR GANDA Bh 3 0.033355
3 LAMPU PIJAR 25 watt Bh 2 0.037061
4 KABEL OVERSPONING M 40 0.074122
5 LAMPU SL 18 watt Bh 5 0.100991
X PEKERJAAN PENGUNCI DAN PENGGANTUNG
1 KUNCI TANAM 2 X PUTAR Bh 2 0.174888
2 ENGSEL PINTU H 12 cm Bh 4 0.060453
3 ENGSEL JENDELA Bh 20 0.211589
4 ENGSEL PINTU H 12 cm Bh 2 0.018531
5 GRENDEL JENDELA Bh 10 0.074122
6 KAIT ANGIN PINTU DAN JENDELA Bh 10 0.110883
7 HAK ANGIN PINTU DAN JENDELA Bh 10 0.110883
XI PEKERJAAN CAT DAN FINISING
1 CAT TEMBOK M² 134.87 1.065724
2 CAT KAYU M² 5.6 0.112099
3 PEMBERSIAN HALAMAN Ls 1.00 0.111183
4 PEMELIHARAAN TANAMAN / TAMAN Ls 1.00 0.33355
5 PERBAIKAN KEMBALI KONTRUKSI / FISIK Ls 1.00 0.463263
6 PPN 10% 10% 9.090933
AN MINGGUAN
GU KESEMBILAN

HASIL PEKERJAAN NILAI NILAI


JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN PENYELESAIAN

3 3.428278 6.428278 100% 6.428278


- 1.240822 1.240822 100% 1.240822
- 1.426525 1.426525 100% 1.426525
- 0.80599 0.80599 100% 0.80599

- 0.023719 0.023719 100% 0.023719


- 0.033355 0.033355 100% 0.033355
- 0.037061 0.037061 100% 0.037061
- 0.074122 0.074122 100% 0.074122
- 0.100991 0.100991 100% 0.100991

- 0.174888 0.174888 100% 0.174888


- 0.060453 0.060453 100% 0.060453
- 0.211589 0.211589 100% 0.211589
- 0.018531 0.018531 100% 0.018531
- 0.074122 0.074122 100% 0.074122
- 0.110883 0.110883 100% 0.110883
- 0.110883 0.110883 100% 0.110883

- 1.065724 1.065724 100% 1.065724


- 0.112099 0.112099 100% 0.112099
- 0.111183 0.111183 100% 0.111183
- 0.33355 0.33355 100% 0.33355
- 0.463263 0.463263 100% 0.463263
- - - - -
AN MINGGUAN
GU KESEPULUH

HASIL PEKERJAAN NILAI NILAI


JUMLAH
MINGGU LALU MINGGU INI PELAKSANAAN PENYELESAIAN

1.065724 - 1.065724 100% 1.065724


0.112099 - 0.112099 100% 0.112099
0.111183 - 0.111183 100% 0.111183
0.33355 - 0.33355 100% 0.33355
0.463263 - 0.463263 100% 0.463263
- 9.090933 9.090933 100% 9.090933

AN BULANAN
LAN KETIGA

HASIL PEKERJAAN NILAI NILAI


JUMLAH
BULAN LALU BULAN INI PELAKSANAAN PENYELESAIAN

3 3.428278 6.428278 100% 6.428278


- 1.240822 1.240822 100% 1.240822
- 1.426525 1.426525 100% 1.426525
- 0.80599 0.80599 100% 0.80599

- 0.023719 0.023719 100% 0.023719


- 0.033355 0.033355 100% 0.033355
- 0.037061 0.037061 100% 0.037061
- 0.074122 0.074122 100% 0.074122
- 0.100991 0.100991 100% 0.100991

- 0.174888 0.174888 100% 0.174888


- 0.060453 0.060453 100% 0.060453
- 0.211589 0.211589 100% 0.211589
- 0.018531 0.018531 100% 0.018531
- 0.074122 0.074122 100% 0.074122
- 0.110883 0.110883 100% 0.110883
- 0.110883 0.110883 100% 0.110883

- 1.065724 1.065724 100% 1.065724


- 0.112099 0.112099 100% 0.112099
- 0.111183 0.111183 100% 0.111183
- 0.33355 0.33355 100% 0.33355
- 0.463263 0.463263 100% 0.463263
- 9.090933 9.090933 100% 9.090933