Sunteți pe pagina 1din 4

4 Complete System Setup 1 2 3 4 5

1 Complete configuration worksheet


Available in the box or at http://support.netapp.com/NOW/public/system_setup/
Installation and Setup Instructions
FAS2554 Systems
2 Cable Windows client to the same network as your controllers
FAS2554 SYSTEM
e0a

LNK LNK LNK LNK

Subnet
e0b

3 Power on all external storage ONLY e0a

LNK LNK LNK LNK

e0b

4 Install System Setup* software 1 3 5 7 9 11 13 15


1 3 5 7 9 11 13 15

WINDOWS CLIENT
1000/100/10M
LNK /

on the Windows client


2 4 6 8 10 12 14 16
1000/100/10M
LNK /
2 4 6 8 10 12 14 16

MANAGEMENT SUBNET

CAUTION

1 2

All four power supplies MUST be powered on.


5 Start System Setup software
3 4
Disconnect all
supply power for
complete isolation.

CAUTION e0a CAUTION

1 2 1 2
3 4 3 4


Disconnect all Disconnect all
supply power for

the system.
supply power for LNK LNK LNK LNK
complete isolation. complete isolation.

e0b

• When directed, power on your system (or repower).


complete isolation. complete isolation.
supply power for supply power for
Disconnect all Disconnect all

4 3 4 3
2 1 2 1

CAUTION CAUTION

• Wait for discover to complete. Up to 8 minutes.


CAUTION e0a
CAUTION

1 2 1 2
3 4 3 4
Disconnect all Disconnect all
supply power for supply power for
complete isolation. LNK LNK LNK LNK complete isolation.

e0b

• Enter the values from the configuration worksheet complete isolation.


supply power for
complete isolation.
supply power for

into System Setup.*


Disconnect all Disconnect all
4 3 4 3
2 1 2 1

CAUTION CAUTION

*If you cannot use System Setup, see the Data ONTAP Software Setup Guide

5 Complete configuration 1 2 3 4 5
1 Prepare for installation 1 2 3 4 5

1 Register at support.netapp.com
• Create an account. In the box:
• Register your system.
• Get your license keys.

Power cables
Configuration Starter network, storage, Serial cable not
needed for this
Download and run Config Advisor
and 10 GbE cables
2 worksheet
configuration

From http://support.netapp.com/NOW/download/tools/config_advisor/

3 Download OnCommand System Manager You provide:


From http://support.netapp.com/NOW/cgi-bin/software/
• Provision more storage.
Additional network cables
• Configure other protocols, data protection, and AutoSupport. Screwdriver For connecting your storage to your network Microsoft Windows client
• Set up Service Processor and Remote Support Agent. Rack space - 4U
switch and Microsoft® Windows® client Runs the software to configure
your storage system

HELPFUL LINKS
Visit the NetApp web site for more information.
Download:
• System Setup Software: http://support.netapp.com/NOW/public/system_setup/
• System Setup information: http://support.netapp.com/NOW/public/system_setup/ • OnCommand System Manager: http://support.netapp.com/NOW/cgi-bin/software/
support site

• Controller and configuration examples; Universal SAS and ACP Cabling Guide: https://library.netapp.com/ecm/ecm_download_file/ECMM1280392
• OnCommand System Manager documentation set: http://support.netapp.com/documentation/productlibrary/index.html?productID=61372
NetApp

• Data ONTAP 8 library: http://support.netapp.com/documentation/productlibrary/index.html?productID=30092


• Licenses: http://support.netapp.com/eservice/agree.do?moduleName=PROTOCOL
2 Install hardware 1 2 3 4 5
3 Cable storage (Choose option A, B, or C below) 1 2 3 4 5

Power LED A Cabling FAS2554 systems


Attention LED

Shelf ID display Console port


Remote/Node
Management port
(wrench icon)
with NO external storage No additional cabling required for a single controller.
(Setting: 9600 N-8-1) Gigabit Ethernet
ports (2)
PCM Attention LED
Storage cables
SAS ports (2) e0c-e0f —10 GbE Ethernet ports
or 0c-0f — Fibre Channel ports
(SFP dependent)
Connect SAS ports
NVMEM LED

Bezel
2 Ethernet cables

Connect ACP ports


ACP port
(locked Single controller model Double controller model
FRONT VIEW
One or two wrench
controller icon)
Power supply modules
OF SYSTEM LEDs

STOP HERE. If you have NO external storage, skip to .

BACK VIEW
OF SYSTEM
Cabling FAS2554
B systems WITH
1 Install system CAUTION LIFTING HAZARD
external storage
• Rack the system. To reduce the
weight of the disk
DS424x disk shelves
shelf, remove the
Rail kit: follow instructions in the rail kit. OR System cabinet: install in the system cabinet. power supplies
IOM6 IOM6

and controllers
1 2 3
IOM6 IOM6

• Place the bezel over the front of the system. 110 lbs (49.9 kg) before lifting.

Storage cables
IOM6 IOM6

1 Daisy chain SAS ports IOM6 IOM6

2 Cable controller for 7-Mode Data ONTAP (option A), switched clustered 2 Connect first SAS ports
Data ONTAP (option B) or for switchless clustered Data ONTAP (option C) 3 Connect last SAS ports IOM6
IOM6

IOM6
IOM6

1 Attach cable management arms. A 7-Mode 4 Ethernet cables


IOM6 IOM6

Connect ACP ports


2 10 GbE cables
B Switched clustered
IOM6 IOM6

1
on controllers
N

Connect port e0c to the data switch. Data ONTAP


1 2
3 4
Disconnect all
supply power for
complete isolation.

NOTE: Port e0c is required; other ports are 5


1
to the disk shelves
3
complete isolation.

available if needed.
supply power for

IOM6 IOM6
Disconnect all

2
4 3
2 1

N
N
1 2
3 4
IOM6 IOM6
Disconnect all
supply power for
complete isolation.
N

3
1 2
3 4

Network cables
Disconnect all
supply power for
complete isolation.

5
4 3
complete isolation.
supply power for
Disconnect all

2
4 3

Connect the wrench port to


2 1

N
complete isolation.
supply power for
Disconnect all
4 3
2 1

N IOM6 IOM6

the management or subnet switch.


N
1 2
3 4
Disconnect all
supply power for
complete isolation.

TO DATA TO MANAGEMENT
IOM6 IOM6

NETWORK SWITCH SUBNET

B4
complete isolation.
supply power for
Disconnect all

10 GbE cables
4 3
2 1

TO DATA
For option B only NETWORK

Connect port e0e | 0e and port e0f | 0f


C Switchless clustered SWITCH TO CLUSTER
SWITCH Single controller model Double controller model
to the cluster switch.
Data ONTAP TO MANAGEMENT
NETWORK SWITCH
1
C4 10 GbE cables
N

1 2
3 4
Disconnect all
supply power for
complete isolation.

Cabling FAS2554
See your network administrator for
For option C only help connecting to your switch.
C
5
3
complete isolation.
supply power for

4
Disconnect all

2
Connect port e0e | 0e to port e0e | 0e
4 3
2 1

systems WITH
N

If you are converting from a switchless


and e0f | 0f to e0f | 0f.
1 2
3 4
Disconnect all
supply power for

to a switched configuration, see the


complete isolation.

5 Strap the cables to the cable


complete isolation.
supply power for
Disconnect all

N
4
2
3
1
appropriate migration manual in the
Cluster Management and Interconnect
external storage
management arms. TO DATA
NETWORK SWITCH
TO MANAGEMENT
NETWORK SWITCH Switches library on the NetApp Support Site. DS2246 disk shelves
1 2 3
IOM6 IOM6 IOM6 IOM6

IOM6 IOM6 IOM6 IOM6

3 Connect four power cords Storage cables

1 Daisy chain SAS ports IOM6 IOM6 IOM6 IOM6

e0a

All four power cords MUST be used for all units.


IOM6 IOM6 IOM6 IOM6

LNK LNK LNK LNK

e0b
2 Connect first SAS ports
Use retaining clips 3 Connect last SAS ports IOM6 IOM6 IOM6 IOM6

DO NOT power on
IOM6 IOM6 IOM6 IOM6
e0a

4 Ethernet cables
system at this point.
LNK LNK LNK LNK

e0b

Power cords Connect ACP ports


Use retaining clips
on controllers Single controller model
to the disk shelves
For additional configurations, see HELPFUL LINKS.
2 Install hardware 1 2 3 4 5
3 Cable storage (Choose option A, B, or C below) 1 2 3 4 5

Power LED A Cabling FAS2554 systems


Attention LED

Shelf ID display Console port


Remote/Node
Management port
(wrench icon)
with NO external storage No additional cabling required for a single controller.
(Setting: 9600 N-8-1) Gigabit Ethernet
ports (2)
PCM Attention LED
Storage cables
SAS ports (2) e0c-e0f —10 GbE Ethernet ports
or 0c-0f — Fibre Channel ports
(SFP dependent)
Connect SAS ports
NVMEM LED

Bezel
2 Ethernet cables

Connect ACP ports


ACP port
(locked Single controller model Double controller model
FRONT VIEW
One or two wrench
controller icon)
Power supply modules
OF SYSTEM LEDs

STOP HERE. If you have NO external storage, skip to .

BACK VIEW
OF SYSTEM
Cabling FAS2554
B systems WITH
1 Install system CAUTION LIFTING HAZARD
external storage
• Rack the system. To reduce the
weight of the disk
DS424x disk shelves
shelf, remove the
Rail kit: follow instructions in the rail kit. OR System cabinet: install in the system cabinet. power supplies
IOM6 IOM6

and controllers
1 2 3
IOM6 IOM6

• Place the bezel over the front of the system. 110 lbs (49.9 kg) before lifting.

Storage cables
IOM6 IOM6

1 Daisy chain SAS ports IOM6 IOM6

2 Cable controller for 7-Mode Data ONTAP (option A), switched clustered 2 Connect first SAS ports
Data ONTAP (option B) or for switchless clustered Data ONTAP (option C) 3 Connect last SAS ports IOM6
IOM6

IOM6
IOM6

1 Attach cable management arms. A 7-Mode 4 Ethernet cables


IOM6 IOM6

Connect ACP ports


2 10 GbE cables
B Switched clustered
IOM6 IOM6

1
on controllers
N

Connect port e0c to the data switch. Data ONTAP


1 2
3 4
Disconnect all
supply power for
complete isolation.

NOTE: Port e0c is required; other ports are 5


1
to the disk shelves
3
complete isolation.

available if needed.
supply power for

IOM6 IOM6
Disconnect all

2
4 3
2 1

N
N
1 2
3 4
IOM6 IOM6
Disconnect all
supply power for
complete isolation.
N

3
1 2
3 4

Network cables
Disconnect all
supply power for
complete isolation.

5
4 3
complete isolation.
supply power for
Disconnect all

2
4 3

Connect the wrench port to


2 1

N
complete isolation.
supply power for
Disconnect all
4 3
2 1

N IOM6 IOM6

the management or subnet switch.


N
1 2
3 4
Disconnect all
supply power for
complete isolation.

TO DATA TO MANAGEMENT
IOM6 IOM6

NETWORK SWITCH SUBNET

B4
complete isolation.
supply power for
Disconnect all

10 GbE cables
4 3
2 1

TO DATA
For option B only NETWORK

Connect port e0e | 0e and port e0f | 0f


C Switchless clustered SWITCH TO CLUSTER
SWITCH Single controller model Double controller model
to the cluster switch.
Data ONTAP TO MANAGEMENT
NETWORK SWITCH
1
C4 10 GbE cables
N

1 2
3 4
Disconnect all
supply power for
complete isolation.

Cabling FAS2554
See your network administrator for
For option C only help connecting to your switch.
C
5
3
complete isolation.
supply power for

4
Disconnect all

2
Connect port e0e | 0e to port e0e | 0e
4 3
2 1

systems WITH
N

If you are converting from a switchless


and e0f | 0f to e0f | 0f.
1 2
3 4
Disconnect all
supply power for

to a switched configuration, see the


complete isolation.

5 Strap the cables to the cable


complete isolation.
supply power for
Disconnect all

N
4
2
3
1
appropriate migration manual in the
Cluster Management and Interconnect
external storage
management arms. TO DATA
NETWORK SWITCH
TO MANAGEMENT
NETWORK SWITCH Switches library on the NetApp Support Site. DS2246 disk shelves
1 2 3
IOM6 IOM6 IOM6 IOM6

IOM6 IOM6 IOM6 IOM6

3 Connect four power cords Storage cables

1 Daisy chain SAS ports IOM6 IOM6 IOM6 IOM6

e0a

All four power cords MUST be used for all units.


IOM6 IOM6 IOM6 IOM6

LNK LNK LNK LNK

e0b
2 Connect first SAS ports
Use retaining clips 3 Connect last SAS ports IOM6 IOM6 IOM6 IOM6

DO NOT power on
IOM6 IOM6 IOM6 IOM6
e0a

4 Ethernet cables
system at this point.
LNK LNK LNK LNK

e0b

Power cords Connect ACP ports


Use retaining clips
on controllers Single controller model
to the disk shelves
For additional configurations, see HELPFUL LINKS.
4 Complete System Setup 1 2 3 4 5

1 Complete configuration worksheet


Available in the box or at http://support.netapp.com/NOW/public/system_setup/
Installation and Setup Instructions
FAS2554 Systems
2 Cable Windows client to the same network as your controllers
FAS2554 SYSTEM
e0a

LNK LNK LNK LNK

Subnet
e0b

3 Power on all external storage ONLY e0a

LNK LNK LNK LNK

e0b

4 Install System Setup* software 1 3 5 7 9 11 13 15


1 3 5 7 9 11 13 15

WINDOWS CLIENT
1000/100/10M
LNK /

on the Windows client


2 4 6 8 10 12 14 16
1000/100/10M
LNK /
2 4 6 8 10 12 14 16

MANAGEMENT SUBNET

CAUTION

1 2

All four power supplies MUST be powered on.


5 Start System Setup software
3 4
Disconnect all
supply power for
complete isolation.

CAUTION e0a CAUTION

1 2 1 2
3 4 3 4


Disconnect all Disconnect all
supply power for

the system.
supply power for LNK LNK LNK LNK
complete isolation. complete isolation.

e0b

• When directed, power on your system (or repower).


complete isolation. complete isolation.
supply power for supply power for
Disconnect all Disconnect all

4 3 4 3
2 1 2 1

CAUTION CAUTION

• Wait for discover to complete. Up to 8 minutes.


CAUTION e0a
CAUTION

1 2 1 2
3 4 3 4
Disconnect all Disconnect all
supply power for supply power for
complete isolation. LNK LNK LNK LNK complete isolation.

e0b

• Enter the values from the configuration worksheet complete isolation.


supply power for
complete isolation.
supply power for

into System Setup.*


Disconnect all Disconnect all
4 3 4 3
2 1 2 1

CAUTION CAUTION

*If you cannot use System Setup, see the Data ONTAP Software Setup Guide

5 Complete configuration 1 2 3 4 5
1 Prepare for installation 1 2 3 4 5

1 Register at support.netapp.com
• Create an account. In the box:
• Register your system.
• Get your license keys.

Power cables
Configuration Starter network, storage, Serial cable not
needed for this
Download and run Config Advisor
and 10 GbE cables
2 worksheet
configuration

From http://support.netapp.com/NOW/download/tools/config_advisor/

3 Download OnCommand System Manager You provide:


From http://support.netapp.com/NOW/cgi-bin/software/
• Provision more storage.
Additional network cables
• Configure other protocols, data protection, and AutoSupport. Screwdriver For connecting your storage to your network Microsoft Windows client
• Set up Service Processor and Remote Support Agent. Rack space - 4U
switch and Microsoft® Windows® client Runs the software to configure
your storage system

HELPFUL LINKS
Visit the NetApp web site for more information.
Download:
• System Setup Software: http://support.netapp.com/NOW/public/system_setup/
• System Setup information: http://support.netapp.com/NOW/public/system_setup/ • OnCommand System Manager: http://support.netapp.com/NOW/cgi-bin/software/
support site

• Controller and configuration examples; Universal SAS and ACP Cabling Guide: https://library.netapp.com/ecm/ecm_download_file/ECMM1280392
• OnCommand System Manager documentation set: http://support.netapp.com/documentation/productlibrary/index.html?productID=61372
NetApp

• Data ONTAP 8 library: http://support.netapp.com/documentation/productlibrary/index.html?productID=30092


• Licenses: http://support.netapp.com/eservice/agree.do?moduleName=PROTOCOL

S-ar putea să vă placă și