Paper No.

670

vi. Recommend usage of separate criteria for above-mentioned category should be more than
technical and financial capacity evaluation. the threshold technical capacity18.
vii. Experience has been recommended as a Given the procurement process and principles set
proxy for technical capacity assessment while by Government of India, the current study tries
net-worth could be approximated as a proxy to identify and analyse the prequalification limits
for financial capacity. based on the samples drawn from Indian projects.
viii. Technical evaluation should precede the The next section describes the methodology used
bidding stage and restrict bid stage to to address the research objectives.
financial bids only. 5. Research Design
ix. Social infrastructure projects can amend
The study aims at gaining insights of pre-
these principles to suit the sector-specific
qualification in India. The objective of this study is
requirements.
to assess the trends of prequalification limits used
The procurement process can be divided into two by the Granting Authorities for prequalification
distinct phases – prequalification (RFQ/EOI) and of the bidders in National Highways PPP projects
bidding stage (RFP). The PQ of bidders is normally in India. The research is done to answer the
done to assess the technical capacity and financial questions: What prequalification limits has been
strength of the bidders. Planning Commission used by the Granting Authority to prequalify the
17 suggests that, to guide the PQ process of PPP private parties? Whether there is any variation
projects, experience has been recommended as of prequalification limits across the projects
a proxy for technical capacity assessment while and if there is, what are the various factors that
net-worth could be approximated as a proxy triggers such variation? Information and data was
for financial capacity. It also recommends that gathered from the Request for Qualification (RFQ)
technical evaluation should precede the bidding documents of various National Highway Projects
stage and restrict bid stage to financial bids only. released by National Highway Authority of India,
It could be observed that technical capacity and Government of India. The sample for highway
financial capacity are the only two parameters used projects consists of 258 projects carried between
for PQ of PPP highway projects. For PQ of the the year 2008 and 2015. Statistical analysis was
private entities, threshold technical capacity and carried out to understand the trend of PQ limits
observed in highway projects. Regression analysis
threshold financial capacity are set by the
was then carried out in IBM SPSS Version 20.
procuring authority as a certain percentage of
the estimated project cost. Financial capacity is 6. Regression Model
measured in terms of parameters like minimum For the regression analysis of the Highways
annual turnover, minimum net worth, and dataset, simple regression equations have been
minimum net cash accruals. Net worth of the developed for technical capacity limits and
private players has been used as the main criteria financial capacity limits for PQ. The general
to measure the financial capacity of the private representation of simple multiple linear regression
parties. Net Cash Accruals statement is also sought equation is y = β0 + β1x1 + β2x2 +..+ βnxn, where
from the private players during the RFQ stage. the β terms are constants. Table 2 presents
And, in order to estimate the technical capacity, the regression equations and corresponding
the private party should furnish information about coefficients. Theoretically, the variables used in
the amount - (a) paid for, or received payments the regression modelling were not collinear. This
for construction of eligible PPP Project (b) and/ is because the variables – technical limit and
or commissioned received and paid for execution financial limits – are checked for the past projects
of Eligible PPP projects (c) and/ or collected and (ex-ante) and are applied in terms of project cost
appropriated revenues of eligible PPP projects. to the future (ex-post), more precisely, the project
The sum of the value of payments relating to the in hand.

96 Journal of the indian Roads Congress, July - September, 2017