Documente Academic
Documente Profesional
Documente Cultură
CIVIL ENGINEERING
OBJECCTIVE TYPE
PAPER – I
D
INSTRUCTIONS
1. IMMEDIATELY AFTER THE COMMENCEMENT OF THE EXAMINATION, YOU
SHOULD CHECK THAT THIS TEST BOOKLET DOES NOT HAVE ANY
UNPRINTED OR TORN OR MISSING PAGES OR ITEMS, ETC. IF SO, GET IT
REPLACED BY A COMPLETE TEST BOOKLET.
2. ENCODE CLEARLY THE TEST BOOKLET SERIES A, B, C OR D AS THE CASE
MAY BE IN THE APPROPRIATE PLACE IN THE ANSWER SHEET.
3. You have to enter your Roll Number on the Test
Booklet in the Box provided alongside. DO NOT write
anything else on the Test Booklet
4. This Test Booklet contains 120 items questions), 60 in PART – A and 60 in PART – B.
Each item comprises four responses answers). You will select the response which you
want to mark on the Answer Sheet. In case you feel that there is more than one correct
response, mark the response which you consider the best. In any case, choose ONLY
ONE response for each item.
5. You have to mark all your responses ONLY on the separate Answer Sheet provided. See
directions in the Answer Sheet.
7. Before you proceed to mark in the Answer Sheet the response to various items in the Test
Booklet, you have to fill in some particulars in the Answer Sheet as per instructions sent
to you with your Admission Certificate.
8. After you have completed filling in all your responses on the Answer Sheet and the
examination has concluded, you should hand over to the Invigilator only the Answer
Sheet. You are permitted to take away with you the Test Booklet.
9. Sheets for rough work are appended in the Test Booklet at the end.
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 3 ::
Ans: (d
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 4 ::
Ans: (c A
15. For the frame shown above, what is the aP b) 2 P c P/2 (d) zero
horizontal thrust at A?
20 kN Ans: (d
a 5 kN b) 8 kN
c 10 kN d) 12 kN
l l
EI=Const
Ans: No Answer
The Correct Answer is 4 kN 2 2
a b)
8 16
16. Mid-span deflection for the beam-load
system shown above can be obtained 2 3 2
c d)
by 32 32
1. Area-moment method
2. Energy method Ans: (a)
3. Generalized three moment equation
4. Conjugate beam method
P EI=const
B C
A
l/2 l/2
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 5 ::
19. The static indeterminacy of the frame 22. The initial cost of equipment is Rs.
shown above is 1100, salvage value is Rs. 100 and life
of equipment is 5 years. The rate of
hinge interest for sinking fund is 8%. The
yearly depreciation by straight line
method is
a Rs. 200 b) Rs. 400
c Rs. 600 d) Rs. 800
Ans: (a)
a4 b) 6 c8 d) 10
23. In a construction project, the cost-slope
Ans: (b of an activity is an indication of
a extra -time needed
20. The equivalent spring constant for the b) extra cost needed
set up shown in the above figure, c reduction of duration of critical
where EI = unity throughout, is activity
d) crashing of an activity
A 1 unit 1 unit B
Ans: (b
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 6 ::
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 7 ::
33. Consider the following statements 36. Which one of the following relates to
pertaining to CPM net work analysis: determination of critical path in PERT?
1. It is event-oriented method a Event-oriented slack
2. It is activity –oriented method b) Activity-oriented slack
3. Time and cost are controlling c Event-oriented float
factors. d) Activity-oriented float
4. Time alone is controlling factors.
Which of these statements are correct? Ans: (a)
a 1 and 2 b) 2 and 3
c 3 and 4 d) 1 and 4 37. PERT calculations yield a project
length of 70 weeks with a variance of 9
Ans: (b weeks. The number of weeks required
to complete the project with a
34. Which of the following do not probability of 95% probability factor
characterize the critical path? for 95% = 1.647 is
1. Falls on single straight line a 73.94 weeks b) 74.94 weeks
between start and end nodes c 75.94 weeks d) 76.94 weeks
2. Has no dummies
3. Indicates the minimum feasible Ans: (b
duration for the complete project
4. Indicates the maximum sensible 38. A linear project is split into six
duration in which to complete identical activities, each having a, m
the project and b durations of 4, 8 and 10 days,
5. Has no parallel sub-paths which results in the standard deviation
between any two nodes on it of the duration for the complete project
a 2, 4 and 5 b) 1,2 and 5 being X1 days. As an alternative
c 2,3 and 4 d) 1,3 and 4 attempt at project planning, the earlier-
split six activities are clubbed as 1 st
Ans: (b and 2nd, 3 rd and 4th and 5 th and 6th ,
thus needing to consider only three
35. In a critical path network, which of the now -modified) activities; and the
following are involved? standard deviation of the duration for
1. A series of interconnected the complete project is now reported as
activities X
2. Considerations for uncertainties X2 days. What will be the ratio 2 ?
X1
in time estimate
3. A logical sequence of activities is 2 7
a b)
provided 3 6
4. The node number at the arrow 5
c d) 1
head is numerically smaller than 6
that at tail end
a 1 and 2 b) 2 and 3 Ans: (d
c 3 and 4 d) 1 and 3
Ans: (d
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 8 ::
39. A father notes that his teenage son uses 42. There is a task involving 160m2 of
the telephone. He takes no less than 5 fixing timber form work for the roof
minutes for a call and sometimes as slab of a single storey building. The
much as an hour. 20 minutes calls are time earmarked for completion is four
more frequent than calls of any other days, working eight hours per day. If a
duration. Considered as a PERT workers team consisting of two skilled
activity a phone call’s expected workers and an unskilled worker can
duration in minutes is install the formwork at the rate of 1.25
1 1 m2/hr, then the number of teams
a 20 b) 22 required is
6 6
1 1 a 3 b) 4 c 5 d) 6
c 24 d) 26
6 6
Ans: (b
Ans: (c
43. Which one of the following four
shapes for a compound column of the
40. A project is estimated to cost Rs. 100
same effective height formed with two
million inclusive of 20% thereof as
equal angles has the largest axial
cost of direct labour. However, 60%
compressive load carrying capacity?
of the labour hours budgeted for is
non productive. If 15% of such wasted
a b)
labour hours are intended to be
curtailed by improved methods of
control, then the resulting savings in
labour cost would be
a Rs. 1.2 m b) Rs. 1.5 m
c Rs. 1.8 m d) Rs. 2.0 m
c d)
Ans: (c
Ans: (d
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 9 ::
45. A crane with two wheels per side has a a 1000 mm2 b) 2000 mm 2
Ans: (d
An industrial building with 5 bays each
48. For a steel built up column subjected to 3 m wide has columns of height 4 m.
an axial force of 1200 kN, the lacing The two end bays are braced by rods as
system is to be designed for resisting shown in the above figure. Each
transverse shear of column carries an axial load of
a 15 kN b) 20 kN 120 kN. The design force for each
c 25 kN d) 30 kN brace is
a 6 kN b) 9 kN
Ans: (d c 15 kN d) 30 kN
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 10 ::
53. Which of the following statements are 56. Which of the following statements are
correct? correct?
1. In a steel compound column 1. Knots in a tree affect the
section, the width will be smaller continuity of fibres.
when they are placed face to face 2. Nail knots do not influence the
than when they are placed back strength of timber.
to back. 3. Druxiness of wood is not a defect
2. In the design of steel compound 4. Tall trees with twisted fibres
columns the length of battens are given good timber for poles
normally longer than the lacings. a 1, 2 and 3 and 4
3. Lacings in a steel compound b) 1, 2 and 4 only
column are designed as slender c 1, 2 and 3 only
compression members d) 2, 3 and 4 only
a 1 and 3 only b) 1 a nd 2 only
c 2 and 3 only d) 1, 2 and 3 Ans: (b
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 11 ::
60. Alternate wetting and drying of timber: 65. The objectives of producing cement
1. Results in shrinkage and swelling include:
2. Brings about wet rot onset 1. Incorporating industrial wastes
3. Increases the durability 2. Increasing free lime
4. Causes transmission of spores from 3. Increasing fineness
germination 4. Saving energy needed in the
a 1, 2 3 and 4 process
b) 1, 2 and 4 only a 1, 2, 3 and 4
c 1, 2 and 3 only b) 1, 3 and 4 only
d) 2, 3 and 4 only c 1, 2 and 4 only
Ans: (b d) 2, 3 and 4 only
Ans: (b
400 N/mm2 400 N/mm2
62. When provided with alternating
courses of a all headers and b) all 300
stretchers, the front elevation of such B
brick masonry is designated as C
a English bond
b) Single Flemish bond 100 N/mm2
c Double Flemish bond The principal stresses in N/mm2 on a
d) Rat-trap bond rectangular element are shown in the
above figure. The intensity of normal
Ans: (a) stress n on the oblique plane BE is
a 125 N/mm2 b) 425 N/mm 2
63. I.S Code specifies that the compressive c 375 N/mm2 d) 250 N/mm 2
strength of brick shall be determined
by keeping the brick: Ans: (c
1. On edge
2. On bed 67. The strength of concrete depends on:
3. After soaking in water for 2 hrs 1. Type of mortar
4. After soaking in water for 24 hrs 2. Proportion between coarse and fine
a 1 and 2 b) 2 and 3 aggregates
c 3 and 4 d) 2 and 4 3. Water cement ratio
4. Temperature at time of mixing
Ans: (d a 1 and 2 b) 2 and 3
c 2 and 4 d 3 only
64. Soundness test of cement is carried out
to determine its Ans: (b
a alumina content
b) iron oxide content 68. Consider the following statements:
c free lime content 1. Strength of structural concrete is
d) durability under sea water absolutely dependent upon water
Ans: (c cement ratio.
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 12 ::
3. The concern for onset of fatigue 72. UPV method in nondestructive testing
in concrete can be overcome by for concrete is used to determine:
increasing design loads in limit 1. Compressive strength
state design. 2. Existence of voids
4. Even though concrete gains 3. Tensile strength
strength after 28 days, such 4. Static modulus of concrete
increase is not considered at 5. Dynamic modulus of concrete
design stage. a 1, 2, 3 and 4 b) 1 and 3 only
Which of these statements are correct? c 2 and 5 only d) 3 and 5 only
a 1, 2 and 3 b) 2, 3 and 4
c 3 and 4 only d) 2 and 4 only Ans: (c
Ans: (d Directions:
Each of the next Twenty 20) items
69. The workability of concrete is assessed consists of two statements, one labeled
through: as the ’Statement I and the other as
1. Slump test ‘Statement II’. You are to examine
2. Compaction factor test these two statements carefully and
3. Setting time of cement select the answers to these items using
4. Le-Chatelier’s apparatus the codes given below:
a 1 and 2 b) 2 and 3
c 3 and 4 d) 4 and 1 Codes:
a Both Statement I and Statement II
Ans: (a) are individually true and Statement II
is the correct explanation of Statement
70. Consider the following statements as I
describing the Rheological behaviour b) Both Statement I and Statement II
of fresh concrete: are individually true but Statement II
1. Newtonian is NOT the correct explanation of
2. Non-Newtonian Statement (I
3. Ratio of shear stress to shear rate is c Statement I is true but Statement II
constant is false
4. Ratio of shear stress to shear rate d) Statement I is false but Statement II
depends upon the shear rate is true
Which of these statements are correct?
a 1, 2, 3 and 4 b) 2 and 4 only 73. Statement I): Weight batching
c 1, 2 and 4 only d) 2, 3 and 4 only method does not produce concrete of
required strength.
Ans: (b Statement II): Bulking of aggregates
does not influence the weight batching
71. Which of the following tests compares method.
the dynamic modulus of elasticity of Ans: (d
samples of concrete?
a Compression test
b) Ultrasonic pulse velocity test
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 13 ::
74. Statement I): Shutter vibrators are Statement II): Variations in rolling
preferred over needle vibrators for pre- resistance of ground surfaces and the
stressed precast beams for bridges grade of the surfaces rolled on,
Statement II): Needle vibrators may influence the magnitude of the needed
get choked by the leaking-in of cement draw-bar pull.
paste.
Ans: (a) Ans: (a)
75. Statement I): In concreting for large 80. Statement I: A wheel type tractor
roof slabs, internal vibrators are with a scraper is employed to move
preferred earth for short hauls.
Statement II: External vibrators Statement II): Wheel type tractor
consume more energy and disturb the moves faster than crawler type tractor.
formwork.
Ans: (a)
Ans: (a)
81. Statement I): Diaphragm pump is
76. Statement I): In the erection of tall very popular in constructions requiring
buildings, tower crane is preferred. dewatering of trenches.
Statement II): Tower crane is a Statement II): Diphragm pump is
combination crane and it is suitable more adaptable in performance than
when the area is small and congested. other types pumps.
77. Statement I): For short distance 82. Statement I): An air vessel on the
hauls, dumpers are well suited suction side of a reciprocating pump
Statement II): Dumpers have the contributes much to increase in
advantage of larger capacity of 5 cu-m efficiency.
or more, and they are hauled by power Statement II): Water gets sucked into
units. the pump cylinder faster.
78. Statement I: Power shovels mounted 83. Statement I): Negative slip is a
on trawlers are universally used for possibility in reciprocating pumps.
excavating earth. Statement II): Non-cavitations in a
Statement II): They have a dipper long suction pipe with simultaneously
with hard teeth to break even hard a short delivery pipe may cause the
rocks delivery valve to open before the
discharge stroke starts.
Ans: (a)
Ans: (a)
79. Statement I): Draw-bar pull exerted
in crawler-tractors over laps between 84. Statement I): Reciprocating pumps
different speed ranges, which latter are may have more severe restrictions on
achieved by operating in different their suction piping system than
gears. centrifugal pumps.
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 14 ::
Statement II): Centrifugal pumps can 89. Statement I): PERT network is
have the advantage of axial balancing event-oriented and it does not reflect
to alleviate possible axial thrust at the on time or resources.
eye of the pump. Statement II): Planners can decide
about the uncertainties involved in
Ans: (b time duration while planning itself.
Ans: (d
85. Statement I): A bar chart may look
awkward when demonstrating the 90. Statement I): When developing the
works to be executed for external time-cost study of a project as a whole,
finishes in multi-storey constructions. the time-cost relationships of every
Statement II): External scaffolding activity therein may have necessarily
can be dismantled in a top-to-down to be inputted.
sequence only. Statement II): Any project is
constituted by all the activities therein.
Ans: (b Ans: (a)
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 15 ::
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 16 ::
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 17 ::
a U.D.L over the entire span the maximum permissible stress in the
b) Two concentrated loads equally metal is 400 kg/cm2, will be
spaced in the span. a 1 cm b) 2 cm
c A central concreted load and a c 3 cm d) 4 cm
U.D.L over the entire span.
d) A couple any where in the span. Ans: (d
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam
:: 18 ::
ACE Engg. Academy – Hyderabad, Vijayawada ,New Delhi, Bangalore, Bhubaneswar & Visakhapatnam