Aberrations found before this release are listed below.
To determine if a work around is suggested for an item you
found refer to these items. Contact us at www.robbinsresearch.com to determine if there is a work-around to any aberrations you find that are not listed, to report a bug or to get additional information after this release.
Issues, Workarounds and Corrections Platform:
# Description Work XP 2000 98 Around? 1 Installation: Install on clean Win 2000 system requires MDAC, VBAJet, and PrintFix 1 DLLs. Work around: Follow the Printer X X Y readme.txt file and install the appropriate Microsoft dlls. 2 Installation: Win2000 by default drops the Archive folder in the RPM applications folder because it could not find the document/settings folder from the system info. Work around: This is correct default behavior. The user can change the archive path X Y manually by using the File: Archive¡ menu item to another folder on their system but that folder must already exist. 3 My Driving Force My Values: Refresh to add more values. After input of away values the user could tab back to the towards value but could not use the left or right click functions to get to the next row or to any other areas of the program. Locked in that X Y function or the away function. Closed the program by holding down Control Alt and Delete keys and restarted. Workaround Refresh issue that did not recur upon restarting. 4 Category Import: When you import a Category you can hit OK on the import dialog and not choose an Area of Management (“AOM”) for the Category, the dialog closes and the category was not imported anywhere. There should be some error message or X X X N otherwise not allow the user to choose an empty AOM for the imported Category. Work around: none, there is no data loss, but this could be confusing. 5 My Life: Per/Pro and My Enterprise: Company Cat: If you have a project associated with a Must Result in a category, then delete that Must Result, the project still exists. But if you attempt to modify the project, it will insist that it be associated with some Area of Management in the Project¡ dialog. In other words, it cannot be made an independent (non-associated) project. Since projects or RPM blocks are flowing from the Must Result, there X X X Y really wouldn’t be a reason for there to be orphaned projects. Work around: none, but the user could just associate it with a dummy Area of Management/Must Result that they create in My Life or My Enterprise.
6 Export/Import result blocks: Should you export a result block
that is scheduled and import it back into the same RPL file the user will end up with the block in two places, but on the schedule X X X N once. Work around: none. 7 Find Feature: If you conduct a find search which results in an X X X Y item found in the Persona or Professional - Area Of Management then switch to My Enterprise the user will see the word “Personal”: as the name of a company. You cannot add categories to it, but you can enter some data on some screens. The “Personal” company is not a real company. Work around: Don’t work with the Personal or Professional AOM in My Enterprise if item found in the Persona or Professional - Area Of Management then switch to My Enterprise the user will see the word “Personal”: as the name of a company. You cannot add categories to it, but you can enter some data on some screens. The “Personal” company is not a real company. Work around: Don’t work with the Personal or Professional AOM in My Enterprise if you see it there. Find Details show a December 31, 1969 in the Create Screen 8 and Daily screen. There is no data on that screen when selected. Workaround: None - When this date reference it could change the reference date so before you work in the file that uses this date X X X N make sure to update any dated items or that you are working on the date you want to for scheduling Find Details for Contacts screen are not listed. 9 Workaround: None - When you click on the contact name on the details screen you will be directed to the screen to review each X X X N find entry. Celebrate Screen: if you click out and delete the last achievement 10 (Weekly or Daily) then the user won’t have a blank row to enter a new achievement. Work around: Refresh the screen manually by X X X Y clicking on the Celebrate button to show the blank row again. 11 Celebrate Screen: If you are entering new text on the Celebrate screen in Weekly or Daily, and change the date while the edit box is still open, the text you were editing becomes an entry on the new date (the one you just changed to), not the original date. X X X Y Work around: make sure you close the new, current edit box before changing the date (by clicking off it). 12 Celebrate Screen: Right Click function to move items to Journal Achievements do not provide any indicator that the function has been done. In the 98 versions there is a green indication that will stay on the screen until you move off of it. There is no color indicator for the XP version. Workaround: None X X X N Marking all items that are to be moved to Journal Achievements or Magic Moments one at a time will help from double entries on the Journal Achievements page. 13 Entering too many characters in the following columns will cause a Command Failed Error or when printing on XP you will get a Field Too Small error. 1) My Enterprise: Company Categories Screen. - Who 2) Daily Create/Weekly Create/Project Create: Leverage X X X Y 3) Project Commit: the Resources column Each should have 40 or fewer characters. Work around: Must have less than 40 characters in these columns. 14 My Enterprise Capture Right Click option to Move the Capture to the must results area adds an extra line between the first must X X X Y result and this moved item. Workaround: delete the extra block. 15 My Enterprise: Weekly Step 2: If you are entering a new Capture, Top 5, or result/purpose for the week and keep the edit cell open when you change the date for the screen, the capture/Top 5/result/purpose you were editing becomes a capture/Top X X X Y 5/result/purpose on the new date, not the old date. Work around: Close the edit cell first by clicking off it, and then change the date. Project Create Screen Reprioritization Print Error: 16 After reprioritizing and deleting some actions, the print out numbers are in order but are not numbered correctly. Workaround: When you print or print preview after reopening the numbering will be corrected. Note when working with Must X X X Y Result priorities prioritize them before moving them to projects or other moves since it cannot be re-prioritized after the move occurs.
17 Project Commit (Weekly): Commit time for a result and some of
its actions. Go to the Weekly Capture and create result blocks from the actions. Go back to the Project Commit screen and commit some time to an action for the result block you just put on the create screen. It won’t show up in the Capture screen again for the new action since it already thinks that block is on the Create X X X N Screen (i.e., you cannot commit time to a project result/action, put it on the Create screen, and then go back to that result and commit more time). Work around: none. You have to Commit all at once the first time since once the result ends up on the Create screen; it is filtered out of the Capture list. 18 Project Commit: When durations are added on the Commit screen with the Results Only view the Action duration times from the Create screen will not carry over to the Weekly Create Screen. While we have set up RPM to default to manage commit screens by result there are other options that are available to you and we want you to use RPM in the way that you need to stay focused on the results you want to achieve. Workaround: A) At the weekly level you will find that you need to input the duration times again. B) To be more efficient with your planning you may wish to list the actions on the project screen and leave the planning durations X X X Y blank until it reaches the level of the weekly create screen. This will avoid repetition in putting in duration time; You may find that re-evaluating the duration for items in context with the week allows you to keep your commitments and schedule in context with the other activities of your week. C) The power of focus will give you the ability to complete the results that matter to you most. If you view all action items on the Project Commit screen and use this tool to define the duration times then RPM will automatically put these duration times into your weekly plan Create Screen so that the result and action(s) are less flexible. Thus, your focus and commitments are not competing with the other to do's that tend to take over. are less flexible. Thus, your focus and commitments are not competing with the other to do's that tend to take over.
19 Daily Capture/Weekly Commit/Project Commit to Day: This
issue arises when the user assigns a duration on the commit screen for a single action and is interrupted in the planning process following a very specific pattern as follows: When the Result has more than one action associated to it and only one action item is given a commit duration. If the second (or more) actions are not committed at the same time you will find X X X Y that when you enter a new random capture item, then go back to the Commit screen and assign durations to finish off the process the random capture that you entered on to the capture screen will be deleted. Work around: Assign durations on the Commit screen as per the default option of Results only. Assign all action items before moving to Capture to enter random capture items. 20 Weekly Communications Capture: Right click to move the X X X Y Action does not work - you are not able to put the action into the result block Workaround: Go back to the Contacts log copy and paste the action into the regular Capture area instead. 21 Weekly Capture: Role result area - copy all to create - menu item did not refresh at the bottom portion of the Capture screen but the result was created on that week. Work around: Manually refresh X X X Y the screen by clicking on the Capture button for the week. 22 Weekly Roles Screen: Right Click function of adding a purpose X Y from the purpose list causes the screen to jump to the top, this causes the user to reset for each entry being made when working on a lower item. Workaround Switch priorities so those blocks you are working in at the top of the screen then when finished move it back to your intended priority position. 23 Deferring result Blocks Weekly or Daily When you defer a result block that you did not complete either today or this week, then defer all incomplete result blocks you will have duplicate result blocks for the following day or week X X X Y (depending upon the section you are in). Workaround If you do this block-by-block then decide to defer all incomplete blocks you will need to delete extraneous data. 24 Schedule All day events: Only one All Day event can be posted. Work around: Add another item to a new line within this X X X Y section when more than one item needs to be noted. Schedule Screen; Duplicate Results appear on the Schedule screen. When results and actions flow to the Daily schedule 25 screen you may find duplicate results. This occurs when you follow the normal process of committing and creating plans. It X X X N/A can't be deleted from this schedule screen but stays in that screen in the area called Committed Results and Actions You will notice these duplicate results Leave them under this heading The result cannot be scheduled twice and turns gray when you try to schedule it. Workaround - Add items to the schedule from the Create screen by right clicking on the result or action. Items will still appear on the schedule listing on the side but you will see the (s) next to the item to know that it was scheduled and won't double schedule the cannot be scheduled twice and turns gray when you try to schedule it. Workaround - Add items to the schedule from the Create screen by right clicking on the result or action. Items will still appear on the schedule listing on the side but you will see the (s) next to the item to know that it was scheduled and won't double schedule the same item. 26 Celebrate Screen; Daily and Weekly Achievements momentarily turn green when sent to Journal Entry Screen Daily or Weekly Achievements that are sent to Journal Achievements as a right click function remains in Magic Moments X N and is highlighted in green with windows 98 while on this screen. The color is removed when you click off then back on to the screen. 27 Help file opening graphic starts on the Must Result screen. Workaround: To start from the beginning of the file and work your way through—in Help navigate to the Contents screen and X X X N/A click on icon at the very top labeled ?RPM. 28 Help file: text error More Time: Applying the 5 Master Steps Complete, Measure and Celebrate: Apply Step 5 to Project and Must Results Once a Must Result or project is completed there is cause for a huge celebration but RPM has been designed to encourage you measure and celebrate as results/actions flow into your daily and weekly plans. This way you don't lose sight of any of the victories that happen along the way. While there isn't a celebrate screen for Must Results or Projects, X X X N/A we recommend that you measure your progress in theses sections of RPM as you do your weekly planning. When the Must Result or Project is complete, you can add it to the Celebrate screen on within any of the sections on that screen or within Journal Achievements. Revision: This should be included with Philosophy More Time Applying the Five Master Steps and for information on how to use the Celebrate screen there is a link when you are in Step by Step Introduction to the Project planner. 29 Help file: Contents notice Using Celebrate functionality description is located under My Life in the contents. It is linked with Project, Weekly and Daily at X X X N/A the Introduction of each screen. This is part of Step 5 of the Weekly Planning process and the juice in life! 30 Help file: text error Celebrate Screen; Results and Achievements can be sent to either the Journal Entry Screen or the Journal Achievements screen. RPM does not automatically transfer results from the Celebration X X X Y screen to the Journal. You are in control of directing these celebrations where you want them. Revision: This as a right click function on the Celebrate screen from Daily or Weekly Achievements. You can also enter your Achievements and Magic Moments directly on this screen. Achievements. You can also enter your Achievements and Magic Moments directly on this screen.
31 Shortcuts and tips
To return to the first screen in any section by pressing the Shift or Ctrl button – you will automatically return to the first screen in the X X X N/A section. 32 Schedule Color code Orange =Items directly entered on the schedule Blue = Daily items scheduled from the Committed Results/Actions X X X N/A Dark Blue = An All Day event Yellow =. Items selected for placement into the schedule when working on this screen.