Documente Academic
Documente Profesional
Documente Cultură
ETAP Page: 1
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: unit6 Config.: Normal
Bus Bunrakuken 20.00 0.375 -11.145 11.151 0.522 -12.896 12.907 9.706 0.396 9.714 9.432 7.914 12.312
Bus load 1 20.00 2.457 -2.977 3.860 2.002 -2.482 3.189 2.572 2.137 3.343 1.735 3.203 3.643
Bus load 2 20.00 2.696 -3.616 4.510 2.277 -3.036 3.795 3.124 2.347 3.907 2.149 3.658 4.242
Coupler 20.00 0.375 -11.145 11.151 0.522 -12.896 12.907 9.706 0.396 9.714 9.432 7.914 12.312
All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA
* LLG fault current is the larger of the two faulted line currents
Project:
ETAP Page: 2
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: unit6 Config.: Normal
Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus Bunrakuken 20.000 0.03486 1.03490 1.03549 0.04898 1.02232 1.02349 0.02472 0.62457 0.62506
Bus load 1 20.000 1.90426 2.30690 2.99132 1.91838 2.29432 2.99067 2.99706 3.85545 4.88332
Bus load 2 20.000 1.53038 2.05250 2.56024 1.54450 2.03992 2.55866 2.40259 3.20927 4.00897
Coupler 20.000 0.03486 1.03490 1.03549 0.04898 1.02232 1.02349 0.02472 0.62457 0.62506