Sunteți pe pagina 1din 2

Project:

ETAP Page: 1
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: unit6 Config.: Normal

Short-Circuit Summary Report

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus Bunrakuken 20.00 0.375 -11.145 11.151 0.522 -12.896 12.907 9.706 0.396 9.714 9.432 7.914 12.312

Bus load 1 20.00 2.457 -2.977 3.860 2.002 -2.482 3.189 2.572 2.137 3.343 1.735 3.203 3.643

Bus load 2 20.00 2.696 -3.616 4.510 2.277 -3.036 3.795 3.124 2.347 3.907 2.149 3.658 4.242

Coupler 20.00 0.375 -11.145 11.151 0.522 -12.896 12.907 9.706 0.396 9.714 9.432 7.914 12.312

All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA

* LLG fault current is the larger of the two faulted line currents
Project:
ETAP Page: 2
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: unit6 Config.: Normal

Short-Circuit Summary Report

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus Bunrakuken 20.000 0.03486 1.03490 1.03549 0.04898 1.02232 1.02349 0.02472 0.62457 0.62506

Bus load 1 20.000 1.90426 2.30690 2.99132 1.91838 2.29432 2.99067 2.99706 3.85545 4.88332

Bus load 2 20.000 1.53038 2.05250 2.56024 1.54450 2.03992 2.55866 2.40259 3.20927 4.00897

Coupler 20.000 0.03486 1.03490 1.03549 0.04898 1.02232 1.02349 0.02472 0.62457 0.62506

S-ar putea să vă placă și