Sunteți pe pagina 1din 7

REPORT PROGRESS TANK

PROGRESS TANK TM 1.1


Accessories
No Nama Tank Progress Sheel Fit Up Welding
Manhole Agitator Drain Over Flow Inlet Pump
1 White Water Collection Finish Finsh ü ‒ ü ü ü
2 Broke Interim Tower Finish Finsh ü ü ü ü ü
3 Fresh Water Finish Finsh ü ‒ ü ü ü
4 Air Receiver Finish Finsh ü ‒ ü ü ü
5 Condensat Finish Finsh ü ‒ X X ü
6 Broke Deflaked Finish Finsh ü ü ü ü ü
7 Machine Chest Finish Finsh ü ü ü ü ü
8 Mixing chest Finish Finsh ü ü ü ü ü
9 Cloudy Fiterate Finish Finsh ü ‒ ü ü ü
10 Clarified White Water Finish Finsh ü ‒ ü ü ü
11 Super Clarified White Water Finish Finsh ü ‒ ü ü ü
12 Recovered Stock Chest Finish Finsh ü ü ü ü ü
13 Warm water Finish Finsh ü ‒ ü ü ü
14 Wire White Water Finish Finsh ü ‒ ü ü ü
15 Vacum WW Finish Finsh ü ‒ ü ü ü
16 Yangkee Pulper Finish Finsh ü ü ü ü ü
17 Separator Control Finish Finsh ‒
18 Vacum Separator #1 Finish Finsh ‒
19 Vacum Separator #2 Finish Finsh ‒
20 Vacum Separator #3 Finish Finsh ‒
21 NaOH Finish Finsh ‒ X X X
Fabrication &
Fabrication & Instalation Fabrication & Instalation Instalation
Progress Bottom Concrate Bottom Cleaning Hydro test Progress % (23/01/2018) Progress % (27/01/018) Progress %
(21/02/2018)

ü ü ü(10/02/18) 60,92% 71,46% 100%

ü ü ü(18/02/18) 46,03% 70,90% 100%

ü ü ü(10/02/18) 25,51% 54,53% 100%

ü ü X
ü ü X 42,42% 42,42%

ü ü X 58,72% 68,25%

ü ü X 62,95% 62,99%

ü ü X 49,49% 63,42%

ü ü ü(12/02/18) 33,08% 40,17% 100%

ü ü ü(13/02/18) 52,21% 70,71% 100%

ü ü ü(13/02/18) 52,05% 58,44% 100%

ü ü X 20,64% 28,45%

ü ü ü(19/02/18) 22,17% 27,76%

ü ü X 63,10% 63,10%

X 86,30% 89,19%

ü ü X 22,55% 22,55%

ü X X 0% 0%

ü X X 0% 29,55%

ü X X 0% 29,55%

ü X X 0% 29,55%

ü X X 11,72% 11,72%
REPORT PROGRESS TANK

PROGRESS TANK TM 1.2


Accessories
No Nama Tank Progress Sheel Fit Up Welding
Manhole Agitator Drain Over Flow Inlet Pump
1 White Water Collection Finish Finsh ü ‒ ü ü ü
2 Broke Interim Tower Finish Finsh ü ü ü ü ü
3 Air Receiver Finish Finsh ü ‒ ü ü ü
4 Broke Deflaked Finish Finsh ü ü ü ü ü
5 Machine Chest Finish Finsh ü ü ü ü ü
6 Mixing chest Finish Finsh ü ü ü ü ü
7 Cloudy Fiterate Finish Finsh ü ‒ ü ü ü
8 Clarified White Water Finish Finsh ü ‒ ü ü ü
9 Super Clarified White Water Finish Finsh ü ‒ ü ü ü
10 Recovered Stock Chest Finish Finsh ü ü ü ü ü
11 Warm water Finish Finsh ü ‒ ü ü ü
12 Wire White Water Finish Finsh ü ‒ ü ü ü
13 Vacum WW Finish Finsh ü ‒ ü ü ü
14 Yangkee Pulper Finish Finsh ü ü ü ü ü
15 Separator Control Finish Finsh ‒
16 Vacum Separator #1 Finish Finsh ‒
17 Vacum Separator #2 Finish Finsh ‒
18 Vacum Separator #3 Finish Finsh ‒
Fabrication &
Fabrication & Instalation Fabrication & Instalation Instalation
Progress Bottom Concrate Bottom Cleaning Hydro test Progress % (23/01/2018) Progress % (27/01/018) Progress %
(21/02/2018)

ü ü ü(10/02/18) 67,76% 69,76% 100%

ü ü ü(19/02/18) 33,40% 69,86% 100%

ü ü X
ü ü X 63,33% 64,62%

ü ü X 59,88% 59,92%

ü ü X 45,29% 62,15%

ü ü ü(12/02/18) 26,05% 43,50% 100%

ü ü ü(13/02/18) 52,45% 67,32% 100%

ü ü ü(13/02/18) 44,07% 45,66% 100%

ü ü X 22,79% 30,78%

ü ü ü(19/02/18) 17,55% 26,76% 100%

ü ü X 53,75% 65,84%

X 75,85% 75,85%

ü ü X 15,49% 22,55%

ü X 0% 0%

ü X 0% 29,55%

ü X 0% 29,55%

ü X 0% 29,55%
REPORT PROGRESS TANK

PROGRESS TANK SP 1
Accessories
No Nama Tank Progress Sheel Welding
Manhole Agitator Drain
1 NBKP LINE # 2 PULPER Sheel 1-2-roof welding in hoizontal ü X X
2 NBKP LINE # 1 PULPER Sheel 1-2-roof welding in hoizontal ü X X
3 NBKP LINE#3 PULPER Sheel 1-2-roof welding in hoizontal ü X X
4 NBKP #2 DUMP TOWER Sheel 1-9- roof ü(B.W.) X ü
5 NBKP#1 DUMP TOWER Sheel 1-9- roof ü X X
6 DUMP CHEST HIGH WS BROKE Sheel 1-8-roof ü X ü
7 LBKP DUMP TOWER sheel 1-10- roof ü(B.W.) X ü
8 LBKP BUFFER TOWER Sheel 1-16 X X ü
9 BUFFER FRESH WATER TOWER 1 sheel 1-10- roof welding sloping ü ‒ ü
10 WW BUFFER TOWER belum belum X X X
11 LBKP HD TOWER Sheel 1-7 ü(B.W.) X X
12 LBKP IBNTERMEDIATE TOWER Join sheel 1-12 Welding out horizontal sheel 1-2 X X ü
13 SP DULATION COLLECTION TOWER Sheel 1-7-roof ü ‒ ü
14 LBKP REFINED TOWER Sheel 1-9- roof ü X ü
15 HIGH WET STRENGHT BROKE REFINED TOWER Sheel1-6-roof ü X ü
16 NBKP #1 REFINED TOWER Sheel 1-7- roof ü X ü
17 NBKP #2 REFINED TOWER Sheel 1-7-roof ü X ü
18 WASH PRESS SHOWER TANK Sheel 1-4-roof ü(B.W.) ‒ ü
19 CONDENSATE BUFFER Sheel 1-4-roof ü ‒ ü(B.W.)
20 TANK NaOH # 1 Sheel 1-2-roof FINISH ü X ü
21 TANK NaOH # 2 Sheel 1-2-roof FINISH ü X ü

KET :
X = Belum
1
Fabrication & Instalation Fabrication & Instalation
Accessories
Progress Bottom Concrate Bottom Cleaning Hydro test Progress % (23/01/2018) Progress % (27/01/018)
Over Flow Inlet Pump

X X X X X 10% 10,94%

X X X X X 10% 10,94%

X X X X X 7,56% 7,56%

X X X X X 9,58% 35,96%

X X X X X 31,70% 45,49%

X X X X X 25% 27,00%

X X X X X 3,35% 10,20%

X X X X X 16,73% 19,72%

ü X X X X 20,36% 28,17%

X X X X X 3,01% 9,49%

ü X X X X 4,05% 10,20%

X X X X X 3,05% 8,05%

ü ü ü ü X 35% 40%

X ü ü ü X 25% 30%

ü X ü ü X 17% 25,00%

X X ü ü X 17% 25,00%

X X ü ü X 25% 27%

ü X ü ü X 34,58% 37,97%

ü X ü ü X 47,85% 50,48%

ü X ü ü X 18,61% 20%

ü X ü ü X 18,61% 20%
Fabrication &
Instalation
Progress %
(21/02/2018)