Sunteți pe pagina 1din 3

ConocoPhillips (Grissik) Ltd.

Grissik – Peratagas USM and Pipeline Tie-In Project

MECHANICAL COMPLETION DOSSIER


TABLE OF CONTENTS
No Description Vol.
1. Signed - off MCC
2. CCMS Engineering Register Status Index
3. Original Punchlist
4. Agreed - System and Subsystem Definition Procedures
5. Inspection and Test Records
5.1. 00-01 - General Civil
 MC-C-09 -Civil Foundation
5.2. 00-02 - General Structure
 MC-S-01 - Structural Steel
 MC-S-02 - Structural Coating
5.3. 00-03 - General Piping
 MC-L-01 - NDE Clearance
 MC-L-02 - Flange Management
 MC-L-03 - Pipework Before Test
 MC-L-04 - Pipe Flushing/Pressure Test/Blowing
 MC-L-05 - Piping Reinstatement
 MC-L-06 - Piping Painting Coating
5.4. 00-04 - General Electrical/Instrument
 MC-J-04 - Instrument Junction Boxes
 MC-E-10 - Grounding Rods
 MC-E-11 - Grounding System
 MC-E-20 - Cable Ladder Rack/Tray/Transits Instalation
5.5. 25-01 – USM Header (Common Inlet)
 Piping
 MC-L-01 - NDE Clearance
 MC-L-02 - Flange Management
 MC-L-03 - Pipework Before Test
 MC-L-04 - Pipe Flushing/Pressure Test/Blowing
 MC-L-05 - Piping Reinstatement
 MC-L-06 - Piping Painting Coating
5.6. 25-02 - USM Header (Common Outlet)
 Piping
 MC-L-01 - NDE Clearance
 MC-L-02 - Flange Management
 MC-L-03 - Pipework Before Test
 MC-L-04 - Pipe Flushing/Pressure Test/Blowing
 MC-L-05 - Piping Reinstatement
ConocoPhillips (Grissik) Ltd.

Grissik – Peratagas USM and Pipeline Tie-In Project

MECHANICAL COMPLETION DOSSIER


TABLE OF CONTENTS
No Description Vol.
 MC-L-06 - Piping Painting Coating
 Instrument
 MC-J-01 - Instrument Telecom and Cables
 MC-J-02 - Actuated Valve ON/OFF
 MC-J-06 - Pressure Instrument
 MC-J-07 - Temperature Instrument
 MC-J-08 - Flow Instrument
5.7. 25A-01 - USM Stream A
 Instrument
 MC-J-01 - Instrument Telecom and Cables
 MC-J-02 - Actuated Valve ON/OFF
 MC-J-06 - Pressure Instrument
 MC-J-07 - Temperature Instrument
 MC-J-08 - Flow Instrument
5.8. 25A-02 – Flare Line
 MC-L-01 - NDE Clearance
 MC-L-02 - Flange Management
 MC-L-03 - Pipework Before Test
 MC-L-04 - Pipe Flushing/Pressure Test/Blowing
 MC-L-05 - Piping Reinstatement
 MC-L-06 - Piping Painting Coating
5.9. 25B-01 - USM Stream B
 Instrument
 MC-J-01 - Instrument Telecom and Cables
 MC-J-02 - Actuated Valve ON/OFF
 MC-J-06 - Pressure Instrument
 MC-J-07 - Temperature Instrument
 MC-J-08 - Flow Instrument
5.10. 83-01 – Lighting and Small Power
 Electrical
 MC-E-02 - LV Cable
 MC-E-07 - "Lighting/ Lighting, Small Power Circuit,
Welding Outlet"
 MC-E-21 - Detailed Ex Inspection/EEHA
ConocoPhillips (Grissik) Ltd.

Grissik – Peratagas USM and Pipeline Tie-In Project

MECHANICAL COMPLETION DOSSIER


TABLE OF CONTENTS
No Description Vol.
5.11. 88-01 – Grounding and Lightning Protection
 Electrical
 MC-E-10 - Grounding Rods