This document is a table of contents for a mechanical completion dossier for the Grissik-Peratagas USM and Pipeline Tie-In Project. It lists inspection and test records for civil works, structural, piping, electrical/instrumentation, and specific systems like the USM header and streams, flare line, lighting and power, and grounding. Records include NDE clearance, flange management, pressure testing, instrumentation installation and checks, cable installation, grounding systems, and examinations. The dossier contains documentation signed off that mechanical completion was achieved.
This document is a table of contents for a mechanical completion dossier for the Grissik-Peratagas USM and Pipeline Tie-In Project. It lists inspection and test records for civil works, structural, piping, electrical/instrumentation, and specific systems like the USM header and streams, flare line, lighting and power, and grounding. Records include NDE clearance, flange management, pressure testing, instrumentation installation and checks, cable installation, grounding systems, and examinations. The dossier contains documentation signed off that mechanical completion was achieved.
This document is a table of contents for a mechanical completion dossier for the Grissik-Peratagas USM and Pipeline Tie-In Project. It lists inspection and test records for civil works, structural, piping, electrical/instrumentation, and specific systems like the USM header and streams, flare line, lighting and power, and grounding. Records include NDE clearance, flange management, pressure testing, instrumentation installation and checks, cable installation, grounding systems, and examinations. The dossier contains documentation signed off that mechanical completion was achieved.