Template note: Increment plan is intended to collect individual sprints into larger releases. In smaller projects, this is not ne
Sprint Plan
Sprint Start Days End Size Status Release Date
1 6/13/2006 14 6/26/2006 8 Planned
2 6/27/2006 14 7/10/2006 3 Planned
3 7/11/2006 14 7/24/2006 8 Planned
4 7/25/2006 14 8/7/2006 0 Planned
5 8/8/2006 14 8/21/2006 0 Planned
6 8/22/2006 14 9/4/2006 0 Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unallocated stories 13
Goal
Goal Increment
Planning 1
Specification and prototype development 1
Specification and prototype development 1
Specification and prototype development 2
Specification and prototype development, documentation 2
Usability test, documentation, prototype corrections 2
Product Backlog
10
Remain. Planned Realized Current Total
Sprint Work Work Work Size
8
1 137 23 23 137
2 114 29 27 137
3 87 31 137 6
4 56 28 137
5 28 28 137
4
6
7
8 2
9
10
0
11 Planned Speed
Average Realized
12 Avg. Worst 3 in Last 8
13
14
15
16
17
18
19
20
21
22
23
24
Velocity and Remaining Work
Note:
In this chart, the tops of the bars show the amount of actual
(or planned) implemented functionality at the beginning of each s
The bottoms of the bars show the changes in project scope
(i.e. if the amount of story points
in the project increases, the bottoms move lower). The length
of the bars indicate the estimated size of the project at the
beginning of each sprint.
The red line indicates the current planned scope.
Development Velocity
t planned scope.