Table of Contents

1. LEGEND...............................................................................................................................................- 4 -
2. TRAINING OBJECTIVES.............................................................................................................. - 6 -
3. MRP......................................................................................................................................... - 7 -
3.1 MRP RUN.....................................................................................................................................- 8 -
3.2 STOCK REQUIREMENT LIST...............................................................................................................- 14 -
3.3 Creation of Purchase Requisition.................................................................................................- 17 -

PP User Manual
MRP
Page 2 of 19 Version: 01
User Manual
Document Details Date : 27/04/2009

Training Document
Material Requirements Planning
Name

Training Process ID SAP_PP_03

References

Version Change Prepared By Date


Initial document Mohammad Arif 27/04/2009

PP User Manual
MRP
Page 3 of 19 Version: 01
1. Legend
SAP Menu Bar

Frequently used symbols / icons and commands in SAP Transactions

Symbols Meaning of symbols and Commands

Enter button. Will be used to validate the User Input data. In certain cases it will also
bring up the subsequent screen
Menu Bar for Transaction Code. Once the Transaction code is entered here and
user presses enter button will take the user directly to the respective screen
Save button. Once the user input for a particular process is completed this button
will be used to save the transaction document

One Step Backward, for moving to previous screen from the existing
transaction.”F3” can be used for the same purpose

Backward, for moving out of the transaction this button will be used

Cancel button. Removes all the input data and comes out of the application

New Session Icon, user can create new sessions by using this icon.

Help icon, system will provide the relevant help details for the field. “F1” key can be
used for this purpose.

Mandatory input field. These fields must be filled with relevant data else system will
not allow to proceed.
Drop Down List: Input values are available in the drop down list. “F4” key will be
used for this purpose.
Information Message: System will provide additional information on the transaction
processed by the user. It is up to the user to take a note of this message

Warning Message: System issues Warning Message where it wants User to validate
the input Data. User is expected to validate the data and press enter to proceed
Error Message: System will give Error Message wherever the inputs are incorrect or
the data validation fails. User is expected to take a note of the same and correct the
input. System will not allow user to proceed until the input is corrected.

PP User Manual
MRP
Page 4 of 19 Version: 01
Create New Item icon, user has to use this button to go to the input screen.

Change Document Icon, will be used to change the already saved documents.

Display Document Icon, will be used to display the already saved documents.

Execute Icon, shall be used to execute the transaction after entering the mandatory
input fields. “F8” key will be used for this purpose.
Other Document Selection icon will be used to select the other documents in the
transaction. “Shift+F5” will be used for this purpose.
Refresh icon, system will refresh the dynamic values

Delete icon, will be used to delete the relevant inputs/document.

PP User Manual
MRP
Page 5 of 19 Version: 01
2. Training Objectives
The objective of this training is to provide the hands on experience of the SAP transactions to the
users. As per business process of EO, the components would be added during production order
creation. For those raw materials which need to be procured externally, Purchase Requisitions
would get generated when MRP is run. MRP would be run on the finished product.

Training ID SAP_PP_03 would demonstrate MRP run and creation of Purchase Requisitions.

PP User Manual
MRP
Page 6 of 19 Version: 01
3. MRP

The main function of material requirements planning is to guarantee material availability, that is, it
is used to procure or produce the requirement quantities on time. This process involves the
monitoring of stocks and, in particular, the automatic creation of procurement proposals for
purchasing.

PP User Manual
MRP
Page 7 of 19 Version: 01
3.1 MRP RUN

Logistics  Production  MRP  Planning  Single Item, Multi Level(As


Menu Path
shown in above screen)
Transaction code MD02
Action Press Enter
Result Following screen will appear

PP User Manual
MRP
Page 8 of 19 Version: 01
Single-Item, Multi Level

Input data field Input data Field details Comments


Input Data Press F4 to get a list of options
Number of the material code of and select the material code of
Material
the finished product the product which needs to be
produced.
Number which clearly identifies
Press F4 to get a list of options
Plant the plant where planning is
and select the plant code ex.
carried out
1200
.
Processing Key Specify the type of MRP Run Select ‘NETCH’ from options
after pressing F4. The system
only plans materials that have
undergone a change relevant to
MRP since the last planning run

PP User Manual
MRP
Page 9 of 19 Version: 01
Create System generates Purchase
Select code as ‘1’. 1 refers to
Purchase Requisition directly after MRP Purchase Requisition
Requisition run.
Delivery Related to scheduling agreement
Maintain the code as ‘3’ always
Schedules
Create MRP Indicator controls whether the
List system should always create
Maintain the code as ‘1’
an MRP list for all planned
materials
Planning Mode Defines how procurement
proposals from the last
Select code as ‘1’
planning run are to be
dealt with
Also Plan New components added in
unchanged Put a tick against this option production Order will be
components planned
Indicator controls that the MRP
Display Results Put a tick against this option result, that is the MRP list, is
before they are displayed for information
saved purposes before saving.

If you do not set this indicator,


the MRP list and the newly
created
procurement proposals are
automatically saved by the
system without
being displayed first.
Display Put a tick against this option Instructs the system to create a
Material List list of the planned materials
after the planning run.
Action Press Enter Twice

Result Following screen will appear

PP User Manual
MRP
Page 10 of 19 Version: 01
Planning Result: Individual Lines

Input data field Input data Field details Comments

Action Click on
Save the screen
Result
Following screen will appear

PP User Manual
MRP
Page 11 of 19 Version: 01
Single-Item, Multi-Level

Input data field Input data Field details Comments


Click on
Action Click on Continue button

Result Following screen will appear after the saving


the screen

PP User Manual
MRP
Page 12 of 19 Version: 01
Single-Item, Multi-Level

Input data field Input data Field details Comments

Action Details can be viewed


View the materials planned
Result
Number of materials planned van be viewed

PP User Manual
MRP
Page 13 of 19 Version: 01
3.2 Stock Requirement List

Logistics  Production  MRP  Evaluations  Stock/Requirements List (As


Menu Path
shown in above screen)
Transaction code MD04
Action Press Enter
Result Following screen will appear

PP User Manual
MRP
Page 14 of 19 Version: 01
PP User Manual
MRP
Page 15 of 19 Version: 01
Stock/Requirements list : Initial screen

Input data field Input data Field details Comments

Press F4 to get a list of options


Number of the material code of
and select the material code of
Input Data Material the finished product on which
the product which needs to be
MRP is run
produced.
Number which clearly identifies
Press F4 to get a list of options
Plant the plant where planning is
and select the plant code ex.
carried out
1200
.
Action Press Enter

PP User Manual
MRP
Page 16 of 19 Version: 01
Result Following screen will appear

PP User Manual
MRP
Page 17 of 19 Version: 01
Stock/Requirements list as of 11:49 Hrs

Input data field Input data Field details Comments

Single click on Production Order number and then


Action Order Tree structure will open
click on
Result
Following screen will appear

PP User Manual
MRP
Page 18 of 19 Version: 01
3.3 Creation of Purchase Requisition

Stock/Requirements list as of 12:10 Hrs

Input data field Input data Field details Comments

Action For example: 100000055


Double click on Material number

Result Purchase Requisition number can viewed at For example: 1700001147


Right hand side

PP User Manual
MRP
Page 19 of 19 Version: 01