Review: Definition of EIA


Environmental
Impact Assessment is
ü
A formal process for identifying:
•likely effects of activities or Environment is
projects on the broadly interpreted:
ENVIRONMENT, and on physical, biological,
human health and welfare. and social.

•means and measures to


In EIA, the term
mitigate & monitor these
“ impacts” is used
impacts instead of “ effects
of activities. ”
What is an
impact ?
3

What is an impact?
The impact of an activity
is a deviation (a change) The baseline
from the baseline situation is the
situation that is caused existing
by the activity. environmental
situation or
condition in the
absence of the
! To measure an impact, you activity.
must know what the
The baseline
baseline situation is. situation is a key More…
concept in EIA.

ENCAP EA-ESD Course: Basic


Concepts for EIA. Visit 4
www.encapafrica.org

2
2/26/18

DAMPAK & AMDAL

DAMPAK = pengaruh pada sesuatu akibat suatu perbuatan

DAMPAK LH = pengaruh perubahan pada LH yang disebabkan oleh


suatu usaha &/ kegiatan

PROYEK L H

PERLU TELAAHAN YANG CERMAT ATAS FAKTA DI LAPANG

AMDAL

AMDAL, ANDAL

DAMPAK & AMDAL

AMDAL TIDAK SAMA DENGAN ANDAL

AMDAL = bagian dari studi kelayakan suatu


usaha &/ kegiatan untuk proses perijinan

ANDAL = telaahan secara cermat & mendalam


tentang dampak besar & penting suatu rencana

FAKTA LAPANGAN LABORATORIUM

3
2/26/18

Proses AMDAL
DAMPAK & AMDAL BAGAIMANA TAHU ?

ANDAL = HASIL TELAAHAN CERMAT & MENDALAM


ATAS DASAR FAKTA DI LAPANGAN

DATA FISIK DATA SOSIAL


LINGKUNGAN BUDAYA

PENGAMATAN ANALISIS
PENGUKURAN LABORATORIUM
DI LAPANG

The baseline situation


Water Quantity, quality, reliability,
In characterizing the accessibility
baseline situation,
Soils Erosion, crop productivity,
many environmental fallow periods, salinity,
components MAY be nutrient concentrations
of interest Fauna Populations, habitat

The components of
Env Health Disease vectors, pathogens
interest are those that
are likely to be affected
Flora Composition and density of
by your activity—or natural vegetation,
upon which your productivity, key species
activity depends for its
success Special Key species
ecosystems
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 8
www.encapafrica.org

4
2/26/18

The baseline situation


The baseline situation is not simply a “snapshot.”
Describing the baseline situation requires describing both the normal

Water table
variability in environmental components & current trends in these
components.

time
This chart of
groundwater levels
shows both variability
and a trend over time.

Both are part of the


groundwater baseline
situation.
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 9
www.encapafrica.org

Types of impacts & their attributes


Direct & indirect
The EIA process is impacts
concerned with
Short-term & long-
all types of impacts and term impacts
may describe them in a
Adverse & beneficial
number of ways
impacts
Cumulative impacts
¯ Intensity
¯ Direction
¯ Spatial extent
¯ Duration
¯ Frequency
But all impacts are
¯ Reversibility NOT treated
¯ Probability equally.
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 10
www.encapafrica.org

5
2/26/18

Specifically,
! It is ESSENTIAL in EIA
to focus on the most
significant impacts.

Don’t waste effort & time


analyzing and discussing
impacts that are less
important.

ENCAP EA-ESD Course: Basic


Concepts for EIA. Visit 11
www.encapafrica.org

What is an activity?
We are discussing the impacts of activities.
What are activities?

ü An activity is:
a desired
accomplishment or
output Accomplishing an activity
E.g.: a road, seedling requires a set of actions
production, or river
ACTIVITY: ACTIONS:
diversion to irrigate market access Survey, grading, culvert
land road construction, compaction,
rehabilitation etc. . .

A project or program may


consist of many activities
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 12
www.encapafrica.org

6
2/26/18

DAMPAK KEGIATAN DAMPAK

PEMBANGUNAN

SOSIAL, BIOFISIK PRIMER


EKONOMI,
BUDAYA

SOSIAL,
EKONOMI SEKUNDER
BIOFISIK BUDAYA

KENAIKAN
KESEJAHTERAAN

TUJUAN

PERUNTUKAN AMDAL

Setiap rencana yang diperrkirakan mempunyai dampak


penting thd lingkungan wajib dilengkapi dengan AMDAL
Jadi AMDAL diperuntukkan bagi suatu rencana

Untuk proyek yang sudah jadi dipergunakan Penyajian


Evaluasi Lingkungan (PEL) dan atau Studi Evaluasi
Lingkungan (SEL)

7
2/26/18

SITUASI AMDAL AMRIL

Proyek sedang direncanakan + +


Proyek telah jadi dan operasional - +
Proyek telah jadi dan operasional
serta direncanakan perluasan + +
Daerah dg potensi pembangunan tetapi
belum ada rencana pembangunan - +

MENGAPA DIPERLUKAN AMDAL


• Adanya UU dan PP yang menghendaki
adanya AMDAL untuk dilakukan pada
proyek-proyek yang akan dibangun
• AMDAL harus dilakukan agar kualitas
lingkungan tidak rusak karena adanya
proyek-proyek pembangunan.

8
2/26/18

AKTIVITAS PEMB. EKONOMI KESEJAHTERAAN


MANUSIA MANUSIA MANUSIA

DAMPAK LINGKUNGAN
(POSITIP/NEGATIP)

SIAPA YG HARUS MELAKUKAN AMDAL


Pemrakarsa proyek

Sebagai penyebab timbulnya pencemaran


• Maka yang harus menyelenggarakan AMDAL adalah
pemrakarsa proyek termasuk dalam beaya-beaya
pengendalian dalam batas baku mutu yg ditetapkan
oleh pemerintah
• Dalam pelaksanaannya pemrakarsa dapat
memanfaatkan jasa konsultan AMDAL atau pihak lain
atas dasar saran pemerintah

9
2/26/18

PERANAN AMDAL DALAM PERENCANAAN PROYEK

Proyek bersifat: - fisik


- Non fisik
• AMDAL mempunyai peranan dalam pengambilan
keputusan tentang proyek yang sedang
direncanakan
• Artinya AMDAL tidak banyak artinya apabila
dilakukan setelah diambil keputusan untuk
melaksanakan proyek tersebut
• AMDAL tidak boleh dianggap sebagai satu-satunya
faktor penentu dalam pengambilan keputusan,
tetapi sebagai masukan tambahan untuk
pengambilan keputusan.

PERANAN AMDAL DALAM PERENCANAAN PROYEK

Peranan Dalam Pengelolaan Proyek

Fase-fase pengelolaan proyek:


– Fase identifikasi
– Fase studi kelayakan
– Fase rekayasa (rancangan)
– Fase pembangunan proyek
– Fase proyek berjalan (operasi)
– Fase pasca operasi

10
2/26/18

PERANAN AMDAL DALAM PERENCANAAN PROYEK

Peranan Dalam Pengelolaan Proyek

STUDI
KELAYAKAN
TEKNIS
STUDI
KELAYAKAN
LINGKUNGAN
STUDI (AMDAL)
KELAYAKAN
EKONOMIS

PROYEK DAMPAK PENGELOLAAN


BERJALAN LINGKUNGAN LINGKUNGAN

Pengendalian Lingkungan dg pendekatan Teknis

PERANAN AMDAL DALAM PERENCANAAN PROYEK

Peranan Dalam Pengelolaan Proyek

STUDI
KELAYAKAN
TEKNIS STUDI
KELAYAKAN
LINGKUNGAN
STUDI (AMDAL)
KELAYAKAN
EKONOMIS

PROYEK DAMPAK PENGELOLAAN


BERJALAN LINGKUNGAN LINGKUNGAN

Pengendalian Lingkungan dg pendekatan Limbah

11
2/26/18

PERANAN AMDAL DALAM PERENCANAAN PROYEK


Amdal Sebagai Dokumen yang penting

• Sbg informasi pembanding dlm


melaksanakan hasil pemantauan
• Sbg informasi yg berharga bagi proyek lain
yg akan dibangun di dekat lokasinya.
• Merupakan dokumen penting yg dpt
digunakan di pengadilan dlm menghadapi
tuntutan pihak lain.

PERANAN AMDAL DALAM PERENCANAAN PROYEK


Kegunaan AMDAL bagi berbagai pihak

1. Kegunaan bagi pemerintah


• Dpt membantu dlm menentukan
kebijaksanaan yg tepat dlm perencanaan
dan pengambilan keputusan serta
peningkatan pelaksanaan pengel.
Lingkungan hidup.

12
2/26/18

PERANAN AMDAL DALAM PERENCANAAN PROYEK


Kegunaan AMDAL bagi berbagai pihak
2. Kegunaan bagi pemilik proyek
• Untuk melindungi proyek dari tuduhan
pelanggaran
• Untuk melindungi proyek yg melanggar UU
atau PP yg berlaku
• Untuk melihat dan memecahkan masalah-
masalah lingkungan yg akan dihadapi di
masa akan datang
• Sebagai sbr informasi lingkungan di sekitar
lokasi proyek

PERANAN AMDAL DALAM PERENCANAAN PROYEK

Kegunaan AMDAL bagi berbagai pihak


3. Kegunaan bagi pemilik modal
• Bank sbg pemilik modal selalu
menyertakan AMDAL setiap pengajuan
permintaan pinjaman
• Tujuan: agar dapat menjamin
keberhasilan dan keamanan modal yg
disalurkan

13
2/26/18

PERANAN AMDAL DALAM PERENCANAAN PROYEK

Kegunaan AMDAL bagi berbagai pihak


4. Kegunaan bagi masyarakat
• Dpt mengetahui rencana
pembangunan di daerahnya
• Mengetahui perubahan lingkungan
dimasa sesudah proyek berjalan
• Mengetahui hak dan kewajiban di dlm
hubungan dg proyek

PERANAN AMDAL DALAM PERENCANAAN PROYEK

Kegunaan AMDAL bagi berbagai pihak


5. Kegunaan lainnya
• Kegunaan dlm analisis dan kemajuan
IPTEK
• Kegunaan dalam penelitian
• Timbulnya konsultan AMDAL yg baik

14
2/26/18

UPAYA MENINGKATKAN EFEKTIVITAS AMDAL


1. Menumbuhkan pengertian bahwa AMDAL bukan
sbg penghambat pembangunan tetapi untuk
menyempurnakan perencanaan pembangunan.
2. Banyak data yg kurang relevan dg masalah-
masalah yg dipelajari
3. Laporan AMDAL harus ditulis dg bahasa yg
mudah dimengerti
4. Rekomendasi yg diberikan harus jelas dan
spesifik
5. Adanya komisi AMDAL yg berkualitas
6. Belum digunakan RPL sbg umpan balik untuk
penyempurnaan implementasi dan operasi proyek

AMDAL adalah keseluruhan proses yang


meliputi penyusunan, berturut-turut :
1. Kerangka Acuan bagi penyusunan Analisis
Dampak Lingkungan (KA) ,
2. Analisis Dampak Lingkungan (ANDAL),
3. Rencana Pengeloiaan Lingkungan (RKL),
4. Rencana Pemantauan Lingkungan (RPL).

15
2/26/18

3 komponen yang terkait dalam


penyusunan AMDAL
§ Pemrakarsa adalah orang atau badan yang mengajukan dan
bertanggung jawab atas suatu rencana kegiatan yang akan
dilaksanakan
§ Instansi yang bertanggung jawab, adalah instansi yang
berwenang memberikan keputusan tentang pelaksanaan
rencana kegiatan
§ Komisi Analisis Mengenai Dampak Lingkungan adalah komisi
yang dibentuk oleh Menteri atau Pimpinan Lembaga
Pemerintah Non Departemen di tingkat pusat, dan oieh
Gubernur Kepaia Daerah Tingkat I di Tingkat Propinsi

Prosedur Pelaksanaan
AMDAL

16
2/26/18

Penyusunan AMDAL, ditempuh beberapa


langkah dg urutan sbb:
1. Kerangka acuan ANDAL
• KA ANDAL ini merupakan ruang lingkup studi ANDAL
yang disepakati bersama antara semua pihak yang
terkait Yaitu : pemrakarsa, penyususn ANDAL
maupun instansi pemerintah yang bertanggung
jawab terhadap kegiatan yang bersangkutan.
• KA inilah yang menjadi pegangan dari semua pihak,
baik dalam penyusunan ANDAL dan evaluasi
dokumen studi tersebut .

Penyusunan AMDAL, ditempuh beberapa


langkah dg urutan sbb:
2. ANDAL, RKL DAN RPL
– Ada 5 (lima) langkah penyusunan ANDAL, RKL
DAN RPL,

Pengumpulan data dan informasi tentang :


•Rencana kegiatan
•Rencana lingkungan awal

17
2/26/18

The EIA process

Phase II:
Phase I:
Full EIA study
Initial inquiries
(if needed)

•Understand • Scope
proposed activities • Evaluate baseline situation
• Identify & choose alternatives
•Screen • Identify and characterize potential
•Conduct preliminary impacts of proposed activity and
assessment (if each alternative
needed) • Develop mitigation and monitoring
• Communicate and document

Our focus!
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 36
www.encapafrica.org

18
2/26/18

Phase 1 of the EIA Process


Understand Screen the Conduct a
Phase I Phase II
proposed activity Preliminary
activity Assessment
Based on the ACTIVITY IS SIGNIFICANT BEGIN
Why is the nature of the OF MODERATE A rapid, ADVERSE FULL
activity being activity what OR UNKNOWN simplified EIA IMPACTS EIA
proposed? RISK POSSIBLE STUDY
level of study using
environmental simple tools SIGNIFICANT
What is being review is (e.g. the ADVERSE
proposed? indicated? USAID IEE) IMPACTS
VERY UNLIKELY

ACTIVITY IS LOW
RISK (Of its nature, STOP
very unlikely to have the EIA
significant adverse process
impacts)

ACTIVITY IS
HIGH RISK (Of its
nature, likely to have
significant adverse
impacts)
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 37
www.encapafrica.org

Phase 1 of the EIA process:

Understand the proposed activity


Understand ALL EIA processes begin with
the proposed
activities understanding WHAT is being proposed,
Why is the and WHY.
activity being The question
proposed? “WHY IS THE ACTIVITY BEING PROPOSED?
What is being Is answered with the development objective (D.O.).

û
proposed?

ü
“building a road” Not a D.O.!
“increasing access
Is a D.O.
to markets”
“ If we don’ t
understand
We must understand the
it, we can’ t Development Objective to identify
assess it! ” environmentally sound alternatives
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 38
www.encapafrica.org

19
2/26/18

Phase 1 of the EIA process:

Understand the proposed activity


Understand Once we understand the development
the proposed
objective, we must fully understand
activities
WHAT is being proposed.
Why is the
activity being This includes associated actions!
proposed? PRIMARY ACTIVITY:
What is being construction of diversion dam &
proposed? irrigation canal
ASSOCIATED ACTIONS:
•Survey
“ Oops. I •negotiate land tenure
forgot •construct borrow pit
about the •establish construction camp
borrow pit.” •construct temporary
diversion structure
•dispose of soil, debris

ENCAP EA-ESD Course: Basic


Concepts for EIA. Visit 39
www.encapafrica.org

Phase 1 of the EIA process:

Screen the activity


Screen each
activity
SCREENING is the process of asking
Based on the a very basic set of questions about
nature of the
activity, what the nature of activity.
level of These questions:
environmental •do NOT require analysis.
analysis is
•do NOT require detailed knowledge
indicated?
about the proposed sites, techniques or
methods
Example screening questions:
Does the activity involve:
•Penetration road building?
•Large-scale irrigation?
•Introduction of non-native
crop or agroforestry species?
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 40
www.encapafrica.org

20
2/26/18

Phase 1 of the EIA process:

Screen the activity


Screen each
activity
screening classifies the activity into
Based on the a RISK CATEGORY:
nature of the
activity, what VERY LOW RISK EIA process ends
level of
environmental VERY HIGH RISK Do full EIA study
analysis is
indicated? MODERATE OR Do preliminary
UNKNOWN RISK assessment

The outcome of the


screening process
determines the next step
in the EIA process
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 41
www.encapafrica.org

Phase 1 of the EIA process:

Screen the activity

! Each donor agency


and national EIA law
has its own set of
screening questions.

ü Screening is the topic


of an upcoming
module

ENCAP EA-ESD Course: Basic


Concepts for EIA. Visit 42
www.encapafrica.org

21
2/26/18

Phase 1 of the EIA process:

The Preliminary Assessment


Conduct a
Preliminary
Assessment The purpose of a preliminary
A rapid, assessment is to provide
simplified EIA documentation and analysis that:
study using
simple tools • Allows the preparer to
(e.g. the determine whether or not
USAID IEE) significant adverse impacts are
likely
• Allows the reviewer to agree or

! Screening
disagree with the preparer ’ s
determinations
determines whether • Sets out mitigation and
the preliminary monitoring for adverse impacts
assessment is
necessary
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 43
www.encapafrica.org

Phase 1 of the EIA process:

The Preliminary Assessment


Typical Preliminary
Assessment outline

1. Background (Development For each activity it covers, a


objective, list of activities) preliminary assessment has 3
possible findings:
2. Description of the baseline •The project is very unlikely
situation to have significant adverse
impacts. (EIA process ends)
3. Evaluation of potential
environmental impacts •With specified mitigation
and monitoring, the project
4. Mitigation & monitoring is unlikely to have
significant adverse impacts
5. Recommended Findings •The project is likely to have
significant adverse impacts
(full EIA study is required)
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 44
www.encapafrica.org

22
2/26/18

What is mitigation?

Mitigation is. . .
ü The implementation of
measures designed to
reduce the undesirable
effects of a proposed
action on the
environment

Mitigation is the topic of


an upcoming module!

ENCAP EA-ESD Course: Basic


Concepts for EIA. Visit 45
www.encapafrica.org

To arrive at findings:
Identify, Predict and Judge
Arriving at the FINDINGS in a preliminary
assessment requires 3 steps:
1
Identify potential Many resources describe the potential
impacts impacts of typical small-scale activities.

2 Determine which potential impacts are likely


Predict potential
to become actual, and quantify these
impacts
impacts to the extent possible.

3 Judge the Determine whether the predicted impacts are


significance of indeed significant!
potential impacts THIS WILL OFTEN DEPEND ON HOW
EFFECTIVE THE PROPOSED MITIGATION
ENCAP EA-ESD Course: Basic
MEASURES ARE!
Concepts for EIA. Visit 46
www.encapafrica.org

23
2/26/18

ü Subsequent modules. . .
§Present tools to assist
in identifying &
predicting impacts
§Discuss the factors
involved in judging
significance

ENCAP EA-ESD Course: Basic


Concepts for EIA. Visit 47
www.encapafrica.org

! We only proceed to
Phase II of the EIA process

if
Phase I indicates that
a FULL EIA STUDY
is required

Most small-scale activities do


not require a full EIA study!

ENCAP EA-ESD Course: Basic


Concepts for EIA. Visit 48
www.encapafrica.org

24
2/26/18

Phase 2 of the EIA process:

The Full EIA study

!
A formal scoping process
precedes the study to ID
The full EIA study has issues to be addressed
very similar objectives Analysis of environmental
and structure to a ! impacts is much more
detailed
preliminary Alternatives* must be
assessment. ! formally defined. The
impacts of each
However, the full EIA alternative must be
identified & evaluated,
study differs in and the results compared.
important ways: Public participation is

!
*includes the project as usually required.
proposed, the no-action alternative
at least one other real alternative A professional EIA team
is usually required.
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 49
www.encapafrica.org

Phase 2 of the EIA process:

The Full EIA study


With a few additions, the basic Basic steps of the full
outline of the preliminary EIA study
Scope
Communicate & Document throughout

assessment is the template for


the steps involved in a full EIA Evaluate baseline
study: situation
Identify & choose
1. Background (Development alternatives
objective, list of activities)
Identify and characterize
2. Description of the baseline
potential impacts of
situation
proposed activity and
3. Evaluation of potential each alternative
environmental impacts
Compare alternatives
4. Mitigation & monitoring
Develop mitigation and
5. Recommended Findings monitoring
ENCAP EA-ESD Course: Basic
Concepts for EIA. Visit 50
www.encapafrica.org

25
2/26/18

Phase 2 of the EIA process:


The Full EIA study

ü In summary,
The full EIA study is a far
more significant effort than
the preliminary assessment.

It is reserved for activities for


which screening or the
preliminary assessment
shows that significant
impacts are likely.

ENCAP EA-ESD Course: Basic


Concepts for EIA. Visit 51
www.encapafrica.org

Who is involved in EIA?


Public consultation is usually
Sponsor of the only REQUIRED for full EIA
activity studies.
(usually commissions/conducts the EIA) However, it is good practice
for preliminary assessments
Regulatory agencies/ because:
Review authorities • Predicting impacts is
FACILITATED by broad-
Broad-based public
Communities (men & women)
Civil society based public consultation;
Private Sector Judging significance is very
difficult without it.
• Transparency and
accessibility require
ENCAP EA-ESD Course: Basic disclosure to stakeholders
Concepts for EIA. Visit 52
www.encapafrica.org

26
2/26/18

Making EIA effective

EIA is undertaken early enough


To be an effective tool to affect project design
Mitigation and monitoring
for ESD, EIA must be: developed in the EIA process is
–a integral part of the project implemented.
development cycle.
The full EIA study must
consider real alternatives
–Honest Impacts must be assessed
honestly.

The EIA products must be clear


–Transparent & accessible and accessible to key actors.