Sunteți pe pagina 1din 22

Civil Works /Page 1 of 22

Daily Progress Report


Project: Proposed Construction of Tower D - Pittie Kourtyard, Kharadi, Pune
Date - Saturday, July 15, 2017
SITE PROGRESS
Reinforcement for LW2 is in progress
footing
soling 2nd layer is in progress
Backfilling first layer is in progress
PCC
Dewatering is in progress

CIVIL columns
1.00 PROJECT REVIEW WORKS
Next Days Planning soling,Backfilling,Reinforcement for LW2,concreting for LW1

Constraints Rubble is not available on site

CUMULATIVE
PLANNING PROGRESS UP BALANCE TO
SR NO DESCRIPTION OF WORK UNIT TENDER QTY FOR UPTO LAST COMPLETE
TODAY DAY

CIVIL WORKS

1
Civil Works /Page 2 of 22
Daily Progress Report
Project: Proposed Construction of Tower D - Pittie Kourtyard, Kharadi, Pune
Date - Saturday, July 15, 2017
1.00 PCC for foundation - CF4 Cum 55.00 - 19.00 36.00
2.00 foundation nos 16.00 - 11.00 5.00
3.00 staters nos 27.00 - 14.00 13.00
4.00 column nos 27.00 2.00 14.00 13.00
5.00 soling layers 4.00 1.00 1.00 3.00

TODAY'S
OPENING BALANCE RECEIVED TOTAL
MATERIALS UNIT CONSUMPTI
TODAY RECEIVED ON
MATERIALS FOR CIVIL WORKS
1.00 Steel
8 mm MT 4.05 4.05
10 mm MT 7.93 7.93
12 mm MT 2.25 4.65 6.90
16 mm MT 10.37 10.37
20 mm MT 12.15 12.15
25 mm MT 12.20 12.20
32 mm MT 3.65 0.63 4.28
52.60 57.88 -

2.00 Cement Bag 60.00 60.00

EQUIPMENT / MACHINARY UNIT DEPLOYMENT


1.00 Tractor Nos
2
Civil Works /Page 3 of 22
Daily Progress Report
Project: Proposed Construction of Tower D - Pittie Kourtyard, Kharadi, Pune
Date - Saturday, July 15, 2017
2.00 Dewatering Pump Nos 2.00
3.00 RMC Plant Nos 1.00
4.00 Mixer Nos
5.00 Concrete Pump Nos 1.00
6.00 JCB+POCLAIN Nos
7.00 Soil Compactor Nos
8.00 V.M. Lift Set
9.00 Elect. Breaker Nos
10.00 Steel Bending/Cutting m/c Nos 1+1

3
Civil Works /Page 4 of 22

d, Kharadi, Pune

r LW2,concreting for LW1

PERCENTAGE (%) NEXT DAYS REMARKS


COMPLETED PLANNING

4
Civil Works /Page 5 of 22

d, Kharadi, Pune

0.35 5.00
0.69 -
0.52
0.52
0.25

TOTAL BALANCE AT REMARKS


CONSUMPTION SITE

4.05
7.93
6.90
10.37
12.15
12.20
4.28
- 57.88

- 60.00

5
Civil Works /Page 6 of 22

d, Kharadi, Pune

6
Drawing Tracker /Page 7 of 22
Daily Progress Report
Project: Proposed Construction of Tower D - Pittie Kourtyard, Kharadi, Pune
Date - 15.06.2017
DRAWING TRACKER
SR NO DESCRIPTION DRAWING NAME DRAWING NO. REVISIONS
R0 R1
1.00 Architectural drawings by TKS
Centre line plan 1605-AS.02.A R1
Column Details 1605-AS.02.B R1
Ground floor plan 1605-TD.A1.01 R0
Upper parking plan 1605-TD.A1.02.A R0
1st(podium) floor plan 1605-TD.A1.03 R0
section AA & BB 1605-TD.A4.01.A R0
Seection cc 1605-TD.A4.02.B R0
ramp detail x 1605-TD.A1.02.B R0
grading plan 1605-AS-03 R0
typical sunk beam section 1605-TD.A5.00 R0
podium level column detail 1605-AS-04.B R0
podium level centreline plan 1605-AS.04.A R0

2.00 Structural drawings by Sterling


Foundation level plan & details 8136-WD-FD-01 R1
Column details Foundation to 1st floor 8136-WD-COL-01 R1
RCC wall details Foundation to 1st floor 8136-WD-WALL-01 R0
Ramp Detail 8136-WD-RM-01 R0
Details of staircase NO 1 & NO 2 8136-WD-ST-01 R0
Foundation Details Sheet -2 8136-WD-FD-02 R1

7
Drawing Tracker /Page 8 of 22
Daily Progress Report
Project: Proposed Construction of Tower D - Pittie Kourtyard, Kharadi, Pune
Date - 15.06.2017
Typical Reinforcement details 8136-WD-GEN-02 R0
General Notes 8136-WD-GEN-01 R0
First floor plan (Podium) 8136-WD-1ST-01 R0
8136-WD-COL-ELE-
Reinforcement Details R0
01
Upper ground floor plan 8136-WD-UG-01 R1

Beam And Schedule at upper ground floor 8136-WD-UG-02 R1

Beam & Slab schedule at First floor 8136-WD-1ST-02 R0

8
Drawing Tracker /Page 9 of 22

EVISIONS REMARKS
R2

VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC

VFC
VFC
VFC
VFC
VFC
VFC

9
Drawing Tracker /Page 10 of 22

VFC
VFC
Rev.yet to receive

VFC

VFC

VFC

Rev.yet to receive

10
Man Power/ Page 11 of 22

Project: Proposed
Date - Saturday, July 15, 2017

SR. MALE COOLIE /


NO DATE NAME OF CONTRACTOR ENGINEER SUPERVISOR MASON HELPER
.
1 Thursday, June 01, 2017 Lashkaria 1 0 7
2 Friday, June 02, 2017 Lashkaria 1 0 7
3 Saturday, June 03, 2017 Lashkaria 1 0 3
4 Monday, June 05, 2017 Lashkaria 1 0 3
5 Tuesday, June 06, 2017 Lashkaria 0 0 3
6 Wednesday, June 07, 2017 Lashkaria 1 0 3
7 Thursday, June 08, 2017 Lashkaria 1 0 3
8 Friday, June 09, 2017 Lashkaria 2 0 3
9 Saturday, June 10, 2017 Lashkaria 1 0 0 4
10 Monday, June 12, 2017 Lashkaria 1 4
11 Tuesday, June 13, 2017 Lashkaria 1 1 9
12 Wednesday, June 14, 2017 Lashkaria 2 1 1 7
13 Thursday, June 15, 2017 Lashkaria 3 1 2 8
14 Friday, June 16, 2017 Lashkaria 2 1 2 5
15 Saturday, June 17, 2017 Lashkaria 2 1 1 7
16 Monday, June 19, 2017 Lashkaria 2 1 1 4
17 Tuesday, June 20, 2017 Lashkaria 2 1 1 5
18 Wednesday, June 21, 2017 Lashkaria 2 1 1 5
19 Thursday, June 22, 2017 Lashkaria 2 1 1 6
20 Friday, June 23, 2017 Lashkaria 2 1 1 6
21 Saturday, June 24, 2017 Lashkaria 2 1 1 6
Man Power/ Page 12 of 22
22 Tuesday, June 27, 2017 Lashkaria 2 1 1 4
23 Wednesday, June 28, 2017 Lashkaria 2 1 1 5
24 Thursday, June 29, 2017 Lashkaria 2 1 1 5
25 Friday, June 30, 2017 Lashkaria 2 1 2 4
26 Saturday, July 01, 2017 Lashkaria 2 1 2 5
27 Tuesday, July 04, 2017 Lashkaria 2 1 2 5
28 Wednesday, July 05, 2017 Lashkaria 2 1 3 9
29 Thursday, July 06, 2017 Lashkaria 2 1 3 9
30 Friday, July 07, 2017 Lashkaria 1 1 3 9
31 Saturday, July 08, 2017 Lashkaria 2 1 3 9
31 Monday, July 10, 2017 Lashkaria 3 1 3 12
32 Tuesday, July 11, 2017 Lashkaria 3 1 3 12
33 Thursday, July 13, 2017 Lashkaria 3 1 3 12
34 Friday, July 14, 2017 Lashkaria 3 1 2 14
34 Saturday, July 15, 2017 Lashkaria 2 1 2 14
Man Power/ Page 13 of 22
Daily Progress Report
ect: Proposed Construction of Tower D - Kharadi, Pune

\
CARPENTER FITTER ELEC / MECH / WATERPROOFING PLUMBER WELDER POP
FEMALE COOLIE SAFETY
CARPENTER HELPER FITTER HELPER SUPERVISOR MALE COOLIE SKILLED
0 9 0
0 9 0
0 0 0
0 0 0
0 0 0
0 7 0
0 9 0
0 9 0
0 7 0 9 0 0 0 0 0 0
6 9
3 7 9
3 7 0 8
3 7 9 1
2 7 8
2 7 8 1
3 7 8 0
2 0 0
0 7 8 1
0 7 8 0
0 7 8
0 7 8
Man Power/ Page 14 of 22
2 3 2
2 0 0
2 5 0
1 2 3
2 5 3
2 5 3
2 6 3
2 6 4
2 6 4
2 6 8
0 6 12
0 6 12
0 4 12
0 4 14
0 4 14 1
Man Power/ Page 15 of 22

POP PAINTER
TOTAL REMARK
UNSKILLED
17
17
4
4
3
11
13
14
0 0 21
20
30
29
34
27
29
26
11
25
25
25
25
Man Power/ Page 16 of 22
15
11
16
15
20
20
26
27
26
31
37
37
35
38
38
Progress Snap / Page 17 of 22
Daily Progress Report
Project: Proposed Construction of Tower D - K
Date - 15.07.2017
WORK PROGRESS SNAPS
Progress Snap / Page 18 of 22

REINFORCEMENTFOR LW2 IS IN PROGRESS

SOLING FOR 2ND LAYER IS IN PROGRESS


Progress Snap / Page 19 of 22
Progress Snap / Page 20 of 22
ogress Report
tion of Tower D - Kharadi, Pune

OGRESS SNAPS
Progress Snap / Page 21 of 22

SHUTTERING FOR LW1 IS COMPLETED


Progress Snap / Page 22 of 22

S-ar putea să vă placă și