1.00 PROJECT REVIEW WORKS
Next Days Planning soling,Backfilling,Reinforcement for LW2,concreting for LW1
CUMULATIVE
PLANNING PROGRESS UP BALANCE TO
SR NO DESCRIPTION OF WORK UNIT TENDER QTY FOR UPTO LAST COMPLETE
TODAY DAY
CIVIL WORKS
1
Civil Works /Page 2 of 22
Daily Progress Report
Project: Proposed Construction of Tower D - Pittie Kourtyard, Kharadi, Pune
Date - Saturday, July 15, 2017
1.00 PCC for foundation - CF4 Cum 55.00 - 19.00 36.00
2.00 foundation nos 16.00 - 11.00 5.00
3.00 staters nos 27.00 - 14.00 13.00
4.00 column nos 27.00 2.00 14.00 13.00
5.00 soling layers 4.00 1.00 1.00 3.00
TODAY'S
OPENING BALANCE RECEIVED TOTAL
MATERIALS UNIT CONSUMPTI
TODAY RECEIVED ON
MATERIALS FOR CIVIL WORKS
1.00 Steel
8 mm MT 4.05 4.05
10 mm MT 7.93 7.93
12 mm MT 2.25 4.65 6.90
16 mm MT 10.37 10.37
20 mm MT 12.15 12.15
25 mm MT 12.20 12.20
32 mm MT 3.65 0.63 4.28
52.60 57.88 -
3
Civil Works /Page 4 of 22
d, Kharadi, Pune
4
Civil Works /Page 5 of 22
d, Kharadi, Pune
0.35 5.00
0.69 -
0.52
0.52
0.25
4.05
7.93
6.90
10.37
12.15
12.20
4.28
- 57.88
- 60.00
5
Civil Works /Page 6 of 22
d, Kharadi, Pune
6
Drawing Tracker /Page 7 of 22
Daily Progress Report
Project: Proposed Construction of Tower D - Pittie Kourtyard, Kharadi, Pune
Date - 15.06.2017
DRAWING TRACKER
SR NO DESCRIPTION DRAWING NAME DRAWING NO. REVISIONS
R0 R1
1.00 Architectural drawings by TKS
Centre line plan 1605-AS.02.A R1
Column Details 1605-AS.02.B R1
Ground floor plan 1605-TD.A1.01 R0
Upper parking plan 1605-TD.A1.02.A R0
1st(podium) floor plan 1605-TD.A1.03 R0
section AA & BB 1605-TD.A4.01.A R0
Seection cc 1605-TD.A4.02.B R0
ramp detail x 1605-TD.A1.02.B R0
grading plan 1605-AS-03 R0
typical sunk beam section 1605-TD.A5.00 R0
podium level column detail 1605-AS-04.B R0
podium level centreline plan 1605-AS.04.A R0
7
Drawing Tracker /Page 8 of 22
Daily Progress Report
Project: Proposed Construction of Tower D - Pittie Kourtyard, Kharadi, Pune
Date - 15.06.2017
Typical Reinforcement details 8136-WD-GEN-02 R0
General Notes 8136-WD-GEN-01 R0
First floor plan (Podium) 8136-WD-1ST-01 R0
8136-WD-COL-ELE-
Reinforcement Details R0
01
Upper ground floor plan 8136-WD-UG-01 R1
8
Drawing Tracker /Page 9 of 22
EVISIONS REMARKS
R2
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
VFC
9
Drawing Tracker /Page 10 of 22
VFC
VFC
Rev.yet to receive
VFC
VFC
VFC
Rev.yet to receive
10
Man Power/ Page 11 of 22
Project: Proposed
Date - Saturday, July 15, 2017
\
CARPENTER FITTER ELEC / MECH / WATERPROOFING PLUMBER WELDER POP
FEMALE COOLIE SAFETY
CARPENTER HELPER FITTER HELPER SUPERVISOR MALE COOLIE SKILLED
0 9 0
0 9 0
0 0 0
0 0 0
0 0 0
0 7 0
0 9 0
0 9 0
0 7 0 9 0 0 0 0 0 0
6 9
3 7 9
3 7 0 8
3 7 9 1
2 7 8
2 7 8 1
3 7 8 0
2 0 0
0 7 8 1
0 7 8 0
0 7 8
0 7 8
Man Power/ Page 14 of 22
2 3 2
2 0 0
2 5 0
1 2 3
2 5 3
2 5 3
2 6 3
2 6 4
2 6 4
2 6 8
0 6 12
0 6 12
0 4 12
0 4 14
0 4 14 1
Man Power/ Page 15 of 22
POP PAINTER
TOTAL REMARK
UNSKILLED
17
17
4
4
3
11
13
14
0 0 21
20
30
29
34
27
29
26
11
25
25
25
25
Man Power/ Page 16 of 22
15
11
16
15
20
20
26
27
26
31
37
37
35
38
38
Progress Snap / Page 17 of 22
Daily Progress Report
Project: Proposed Construction of Tower D - K
Date - 15.07.2017
WORK PROGRESS SNAPS
Progress Snap / Page 18 of 22
OGRESS SNAPS
Progress Snap / Page 21 of 22