Schedule of Drills
TSM Form
THOME No. 091
SHIP MANAGEMENT PTE LTD

                 


Vessel Name: Master: Year:

Interval Recorded by: Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec

Oil Spill Drill

Bunker Spill P P

Sea Pollution P P

Toxic Chemical Spill P P


One Of These

Toxic Chemical Spill at P P


Sea or Anchor

Hose Burst, Pipework Monthly P P


Fracture or Cargo
Overflow

Tank Leakage in Double ` P P


Bottoms, Side Spaces
etc.

Abandon Ship / Life Boat Muster and Drill P P P P P P P P P P P P


Note: To be conducted fortnightly for Malta Flag vessels
To be conducted within 24 hours if 25 % or more crew
has been changed.

CONTROLLED Revision: 15 Feb 2017


Approved by DPA/DMR
Page 1 of 5
THOME TSM Form No. 091
SHIP MANAGEMENT PTE LTD Schedule of Drills

Interval Recorded by: Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec

Fire Drill
Note: To be conducted fortnightly for Malta Flag vessels
To be conducted within 24 hours if 25 % or more crew
has been changed.

In Accommodation P P
One Of These
Cargo Fire on Deck P P

In Engine Room P P P P
Monthly
On Deck P P

In Pump Room P P

Rescue Boat (if other than lifeboat) Drill


During the drill-
As far as is reasonable and practicable, rescue boats
other than lifeboats which are also rescue boats, P P P P P P P P P P P P
shall be launched each month with their assigned
crew aboard and manoeuvred in the water. In all
cases this requirement shall be complied with at least
once every three months.

Enclosed Space Entry & Rescue 2 Monthly P P P P P P

Emergency Towing Drill Quarterly P P P P

CONTROLLED Revision: 15 Feb 2017


Approved by DPA/DMR
Page 2 of 5
THOME TSM Form No. 091
SHIP MANAGEMENT PTE LTD Schedule of Drills

Interval Recorded by: Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec

Life Boats Waterborne (including free-fall P P P P


lifeboat and Rescue boats
If rescue boat is not waterborne every month then
must be done at least once in 3 months

Explosion P P P P

Man Overboard Drill P P P P

Gyro Failure P P P P

ECDIS failure ( Vessels fitted with 2 ECDIS) P P P P

Main Engine Failure / Loss of Propulsion Drill P P P P

Black Out / Loss of Electrical Power Drill P P P P

QI Notification Drill Quarterly P P P P

Emergency Steering Drill P P P P

Davit Launched Life Raft Training (If Fitted) Four P P P P


Monthly

Security Drill

Access Control Every P P


Three Of

three
These

Personnel Search months P P

Bomb Threat

CONTROLLED Revision: 15 Feb 2017


Approved by DPA/DMR
Page 3 of 5
THOME TSM Form No. 091
SHIP MANAGEMENT PTE LTD Schedule of Drills

Interval Recorded by: Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec

Unaccompanied Baggage P P

Increased Security Levels P P

Security Incident P P

Communications P P

Scenario as per SSP P P P P


Chapter 32 Section 0.1

Collision P P

GPS (Satellite Navigation position) Failure P P

Freefall launching of life boats P P

Grounding / Stranding P P
Six Monthly
Helicopter Evacuation P P

Extreme Cold / Icing P P

Extreme Weather / Typhoon P P

Serious Crew Illness P P

Gas or Toxic Vapor release P P

Search and Rescue P P

Cargo Jettison P P

CONTROLLED Revision: 15 Feb 2017


Approved by DPA/DMR
Page 4 of 5
THOME TSM Form No. 091
SHIP MANAGEMENT PTE LTD Schedule of Drills

Interval Recorded by: Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec

Breakaway During Cargo P P

Flooding / Breached Hull P P

Gas Leak (For Gas Carriers) Deck Area. P P

Six Monthly
Gas Leak (For Gas Carriers) Deck Area. P P
Compressor Room , Void Spaces ,
Cofferdams

Shifting of Cargo ( For all vessels) P P

Table Top Security with CSO Annual P

LEGEND:
P – PLAN (The actual date of all executed drills shall be updated accordingly when they are completed)

CONTROLLED Revision: 15 Feb 2017


Approved by DPA/DMR
Page 5 of 5