ENTER VALUES IN THE AR

H 3.9m
(B/H) 0.9
B 3.51m
slope 0.02
b 0.2m
c 0.4m
t 0.4m
D 0.9m
b 0o
f 30 o
Hkeybeam 0m
N THE AREAS HIGHLIGHTED IN RED

Unit weight of Concrete 24kN/m3


Unit weight of Soil 18kN/m3
Surcharge 10kN/m2
Bearing Capacity of Soil 120kN/m2
Grade of Concrete 25N/mm2
Cover to Wall/Base 50mm
Reinforcement diameter (wall) 20mm
fy 500N/mm2
Reinforcement diameter (Base) 12mm
Friction coefficient 0.6
RESTORING MOMENT
1. BASE Co-ef L
1 3.51
2. WALL
I 0.5 0.07
II 1 0.2

3. EARTH
I 1 2.84
II 1 0.4

4. SURCHARGE
1 2.84
5. INCLINED LOAD
CREST 0.5 2.84
SIN COMPONENT OF SOIL 0 3.9
SIN COMPONENT OF Q 0 1

X 1.9066883

OVERTURNING MOMENT
1 0.1666667 3.9
2 0.3333333 1
FOS 5.9531172

1. FORCE ASSISTING SLIDING 58.63


2. FORCE RESISTING SLIDING 264.356
COEFFICIENT 0.3464102
91.575605

CONSIDERING PASSIVE EARTH PRESSURE


Kp 3
Efective Height 0.9
Resistance from PEP 21.87
Total Resistance 113.4456

CONSIDERING KEY BEAM


Efective Height 0
Resistance due to Keybeam 0
Total Resistance 91.575605

KB + PEP + VR 113.4456
FOS1 1.561924
FOS2 1.9349412
FOS3 1.561924
FOS4 1.9349412

CHECK F
1. STRESS DUE TO VERTICAL LOADS
TOTAL LOADS ACTING ON THE BASE 264.36
AREA OF THE BASE 3.51
STRESS 1 75.32

2. STRESS DUE TO BENDING MOMENT


ECCENTRICITY OF VERTICAL LOADS
MOMENT ABOUT PIVOT 504.04
C.O.A 1.91
ECCENTRICITY 0.15
RESULTANT STRESS2 19.53

MAXIMUM PRESSURE 94.84


CHECK FOR OVERTURNING

H UW W Lever arm M
0.4 24 33.696 1.755 59.1

3.5 24 2.94 0.4466667 1.31


3.5 24 16.8 0.57 9.58

3.5 18 178.92 2.09 374


0.5 18 3.6 0.2 0.72

1 10 28.4 2.09 59.4

0 18 0 2.5633314 0
3.9 18 0 3.51 0
3.9 10 0 3.51 0
264.36 504

3.9 18 45.63 1.3 59.3


3.9 10 13 1.95 25.4
58.63 84.7
CHECK FOR SLIDING
CHECK FOR BEARING CAPACITY FAILURE
G
OVERTURNING
FOS

SLIDING
FOS
NONE

1.56
ALL COMBINED

1.93
OVERTURNING
5.95

SLIDING
FOS
WITH PEP WITH KEY BEAM

1.93 1.56
ALL COMBINED

1.93
BEARING CHECK
OK? YES

ECCENTRICITY
OK? YES
R/F FOR WALL
Soil
P1 P2
load acting on the cantilever 0 23.4

Moment due to soil wl2/6 wx2/2


0 47.775 0
0.875 47.775 8.95781
1.75 47.775 35.8313
2.625 47.775 80.6203
3.5 47.775 143.325

average depth 0.235


in milimeters 235
cover 50
half of bottom bar 10
efective depth d 175
d' 60

K1 0.1246933333
K1 - K' -0.0313066667

Shear Force 15.0333333333


Shear stress 0.0639716312
Shear check 4
Shear check 2 5
Lever arm d K
175 0.12469

Compression Reinforcement
K-K' d-d'
0 115
tension reinforcement
k b
0.1246933333 1000
As
Reinforcement type 20
area 314
nos 4.7898018929
spacing 208.7769019165
actual spacing 200
Remainder 8.7769019165
5
true spacing 205

A's
Reinforcement type 20
area 314
nos 0.9729299363 305.5
spacing 1027.823240589
actual spacing 1020
Remainder 7.8232405892
5
true spacing 1025
true spacing 1025

TOTAL VERTICAL LOAD ACTING


ON BASE 230.66
FACTOR 1.4
Total Ultimate Load 322.92

Max ultimate pressure 132.78


Min ultimate pressure 78.10

Pressure at wall Face 1 122.34


Pressure at wall Face 2 126.55

1. Moment about face1 327.5372 -314.96


-46.9019068986
efective depth 344
d' 60

K1 0.0158538084
K1 - K' -0.1401461916

Lever arm d K
344 0.01585

Compression Reinforcement
K-K' d-d'
0 284
tension reinforcement
k b
0.0158538084 1000
As
Reinforcement type 12
area 113.04
actual area 520
nos 4.6001415428
spacing 217.3846153846
actual spacing 210
Remainder 7.3846153846
5
true spacing 215

Minimum R/f 520

A's
Reinforcement type 12
area 113.04
520
nos 4.6001415428
spacing 217.3846153846
actual spacing 210
Remainder 0
0
true spacing 210

2. Moment about face 2


10.62
efective depth 344
d' 60

K1 0.0035906334
K1 - K' -0.1524093666

Lever arm d K
344 0.00359

Compression Reinforcement K-K' d-d'


0 284

tension reinforcement
k b
0.0035906334 1000
As
Reinforcement type 12
area 113.04
actual area 520
nos 4.6001415428
spacing 217.3846153846
actual spacing 210
Remainder 7.3846153846
5
true spacing 215

A's
Reinforcement type 12
area 113.04
520
nos 4.6001415428
spacing 217.3846153846
actual spacing 210
Remainder 7.3846153846
5
true spacing 215
R/F FOR WALL
Q
P
3.3333

wx3/6L wxL/2
0 0 47.775 20.417 68.1917
-0.7465 -35.831 20.155078 11.484 31.6395
-5.9719 -71.663 5.971875 5.1042 11.076
-20.155 -107.49 0.7464844 1.276 2.02253
-47.775 -143.33 0 0 0
A sqrtA Z' Z
0.11145 0.33384 145.92271 145.92

fcu b d A's
25 1000 175 0

d fcu fy z A1 As
175 25 500 145.92 1504 1504

305.5
R/F FOR BASE

-59.475

A sqrtA Z' Z
0.23238 0.48206 337.82964 326.8

fcu b d A's
25 1000 344 0

d fcu fy z A1 As
344 25 500 326.8 329.93 329.93
A sqrtA Z' Z
0.25399 0.50397 345.36699 326.8

fcu b d A's
25 1000 344 0

d fcu fy z A1 As
344 25 500 326.8 74.723 74.723
SUMMARY OF R/F

WALL MAIN R/F 5 4.68


5 4.68
35 1
FOOTING R/F
5.00 7.82
39.1 1

concrete volume 2.2265

form work 2 3.9


23.4 2.4649 57.6787 220 12689.3052
23.4 0.888 20.7792 220 4571.424
35 0.888 31.08 220 6837.6

39.10 0.888 34.72 220 7,638.58


39.1 0.888 34.7208 220 7638.576

18500 41190.25

1400 10920

91485.7312
Other costs 22871.4328

114357.164