KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
P16C / BBR84, Bandar Bukit Raja, 3. Air Compressor
Klang, Selangor. Date: Date:

3. Air Compressor
HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

(4) Provide proper working platform for workers.


Unsecure objects Serious injury / fatality - Provide safety access to work area.
2 5 10 Project Manager
- Falling objects -Damage to property - Barricade / cordon the activity area to warn public.
(6) To provide appropriate PPE. Site Manager
Site Agent
Site Engineer
-Minor injury Site Supervisor
(5) Work carry out by skill workers.
Noise exposure (long term can impair 2 3 6 (6) To provide appropriate PPE. SHO / SSS
workers hearing)
EO
Scaffolder
1 Air Compressor
-Minor injury (4) Good / open ventilation at working area. Work Leader
Chemical exposure
(Poisoned) 1 3 3 (5) Take a 2-3 minutes rest after every 2 ( two ) hours. Machinery opr/
- carbon monoxide (6) To provide appropriate PPE.
Driver
Signalman
(5) Training & Briefing.
Banksman
Lightning exposure -Serious injury / fatality 2 5 10 (5) Stop work during thunderstorm.
(6) To provide appropriate PPE. Rigger
Welder
(5) Training & Briefing. Workers
Rain / storm / wind exposure -Minor injury 2 2 4 (5) Stop work during thunderstorm.
(6) To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Air Compressor (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

(4) Good / open ventilation at working area. Project Manager


--Heat stress
- To provide shelter/ rest area & drinking facilities Site Manager
Hot weather (low productivity) 2 3 6 (5) Take a 2-3 minutes rest after every 2 ( two ) hours.
- Skin burn (6) To provide appropriate PPE. Site Agent
Site Engineer
Site Supervisor
SHO / SSS
-Minor injury
Dust exposure 2 3 6 (6) To provide appropriate PPE.
EO
(lung-impaction)
Scaffolder
1 Air Compressor
Work Leader
Machinery opr/
(5) Working area must be free from any flammable
Driver
material.
- Work to be done by experience Workers or trained by Signalman
-Minor injury experience supervisor.
Fire exposure 2 3 6 Banksman
-Damage to property - To ensure machine in good condition before used.
- Machine inspection before work commences. Rigger
(6) To provide appropriate PPE.
Welder
- To provide fire extinguisher at activity area
Workers

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)