CAPABILITY

PROFILE

Third Party Roles in


Construction Contracts

Construction contracts, such as


the FIDIC Red Book and NZS3916
that an ‘Engineer’ understands the
project intentions behind each of
Why third party
prescribe the appointment of a the proposed contracts. roles exist in
third party to act as an impartial
Appointing an ‘Engineer’ to act in
contracts?
authority to make determinations ›› To address the need
this capacity provides invaluable
and resolve disputes as they arise for impartiality,
support throughout the life of the
between the Contractor and the
project providing businesses with a ›› Ensure the philosophy
Principal. Under these forms of
high degree of surety that the right of the head contract is
contract the third party role is maintained and adhered to,
decisions are being made for the
defined as the ‘Engineer’.
right reasons. ›› Provide clear
It is recommended that the communication to both
This service is especially valuable
‘Engineer’ be engaged no later parties on every issue,
for an organisation new to
than the start of the contract ›› Provide interpretation
managing payments under the
procurement phase. Working of the contract, scope
Construction Contracts Act 2002
closely with an established design/ and specification.
or managing contractual claims.
engineering team, it is important

For further information please email: stuart.bailey1@WorleyParsons.com


www.worleyparsons.com
CAPABILITY
PROFILE

Common tasks of a third


party role in contracts
üüAdvising the obligations under
contract in plain english
üüAdvise change control procedures
It is important to differentiate the ‘Engineer to contract’ role üüReview contractual claims
from that of project management, discipline engineering, or üüIssue instructions
acting solely on behalf of the Principal. An ‘Engineer’ must have
üüIssue variations
an in-depth understanding of contract mechanisms and their
application so that later, should any challenge arise; decisions üüChairing construction
previously made can be demonstrated as being fair and reasonable. progress meetings
If you would like to know more about third party roles in contracts üüReview construction schedule
and how this is supported by WorleyParsons wider engineering üüReview construction
base then please email the contact referenced below. drawings by contractor
üüReviewing contractors
International Contract Forms payment claims
The following are examples of typical contracts that include the
üüCertifying payments
requirement for an impartial third party role.
üüReviewing progress and
Form of Contract Third Party Role ‘Title’ preparing monthly reports
NEC 3 Project Manager üüUndertake site visits
International
FIDIC Red Book Engineer and safety audits
üüParticipate and review all testing
NZS3910 Engineer and inspection as requested
New Zealand NZS3916 Engineer
üüIssuing schedules of defects
NZIA SCC:2011 Engineer
üüCertifying practical completion
AS4000 Superintendent
Australia AS4902 Superintendent
ABIC Architect

JCT DB 05 Employer’s Agent


United Kingdom
NEC 3 Project Manager

AIA B101 – 2007 Architect


United States
CD240 Architect/Engineer

Canada CCDC 2 Consultant

For further information please email: stuart.bailey1@WorleyParsons.com


www.worleyparsons.com